Potential CMP Work Program Tasks—Federal Fiscal Year 2016

High-Priority Tasks

Task 1  Support for the CMP Committee and Additional CMP Staff Activities—$9,484

The Boston Region Metropolitan Planning Organization (MPO) Congestion Management Process (CMP) committee was formed in January 2012. The purpose of the CMP committee is to help implement recommended solutions from the most recent CMP report, the Long-Range Transportation Plan (LRTP), the Transportation Improvement Program (TIP), and corridor studies.

The CMP committee will meet approximately four times during federal fiscal year (FFY) 2016. In order to support the CMP committee, MPO staff will organize and attend CMP committee meetings; create agendas, take minutes, present materials; and ensure that the meetings are accessible according to the Americans with Disabilities Act (ADA). When the CMP staff completes a task, it will present the results formally to the MPO.

Other CMP-related activities include monitoring progress of the TIP’s Intersection Improvement Program; enhancing the CMP’s Express Highway Performance Dashboard and Arterial Performance Dashboard; and evaluating projects for CMP criteria that were submitted for the FFYs 2017–21 TIP.

Subtasks

Products of Task 1

Task 2  Analyze the Regional Economic Costs of Congestion—$27,629

The Boston Region MPO will produce a white paper to calculate the cost of time lost because of traffic congestion. For this effort, staff will use INRIX data, combined with data from other sources. The methodology for calculating the cost of delay will be tailored to 2012 land use and transportation characteristics in the MPO region. The findings of this white paper may be used to develop future evaluation criteria for the CMP or the TIP.

Subtasks

Product of Task 2

Task 3  Transit Bus Performance Monitoring—$13,310

In December 2014, the MPO’s federal planning certification review recommended that the agency update its CMP transit-monitoring procedures, which evaluate performance monitoring on the Massachusetts Bay Transportation Authority (MBTA) bus system. In the past, the CMP has utilized two performance measures to monitor congestion on the MBTA bus system: on-time performance and passenger crowding. Staff will need to evaluate whether it should add more performance measures for this purpose. Ideally, transit performance measures should contain data that is readily available to the MPO. Staff should contact the Massachusetts Department of Transportation (MassDOT) and the MBTA to see what data they have collected already (e.g., automatic vehicle location data, passenger counts, wait time data, etc.). The selected performance measures should be consistent with those used for the LRTP’s objectives (e.g., a major objective of the LRTP is to improve the public transportation system’s reliability).

The Boston region MPO will obtain pre-existing data for this task from various sources such as the MBTA. Once staff has the data, it will calculate and map them, then write a short memorandum to summarize the findings.

 

Subtasks

Products of Task 3

Task 4  Add/Extend Coverage Routes of 2012 Express Highway Performance Dashboard and Arterial Performance Dashboard—$16,668

This task will consist of minor updates to the existing dashboards to expand coverage to include the entire MPO model region, which consists of 164 communities, instead of the actual MPO region, which contains 101 communities. The Arterial Performance Dashboard also will be expanded to include several more arterial roadways that are located in Boston Proper.

Subtasks

Products of Task 4

Task 5  Build Arterial and Express Highway Performance Dashboards for 2014 or 2015 Data—$24,623 if INRIX is Used, $24,623 if NPMRDS Data are Used1

Currently, the Express Highway Performance Dashboard and the Arterial Performance Dashboard display 2012 data from INRIX, the dataset that was purchased for $53,900. The Boston Region MPO is in the process of determining if it may obtain a more recent dataset from INRIX or another provider. The MPO also is exploring the possibility of collaborating with other organizations such as Boston University or MassDOT to obtain access to a new INRIX dataset. Currently, the options are either to purchase another INRIX dataset for a fee or use the National Performance Measure Research Dataset (NPMRDS) at no charge.

The NPMRDS is provided to MPOs at no cost through an agreement with the Federal Highway Administration (FHWA) and HERE2. Although the NPMRDS presently is available at no cost, the contract between FHWA and HERE will expire in 2017, so the availability, price, or format of NPMRDS data may change. If INRIX data is used, the 2012 dataset potentially could be compared to the newer dataset to see where congestion is increasing in the roadway network. If the NPMRDS is selected, then staff recommends that the dataset not be compared to the 2012 INRIX data because it is not good practice to compare two datasets that employ different collection methodologies. 

Regardless of which dataset is selected, the performance measures that presently are on the dashboards would be updated to reflect the current year. Thus, in either case, staff would need to calculate and upload the performance measures onto the dashboards.

Subtasks

Products of Task 5

Medium-Priority Task

Task 6 Interactive CMP Congestion Scans—$5,450

In FFY 2015, staff’s Information Technology and Services (IT&S) group built a proprietary in-house application to generate congestion scans. This is a stand-alone application that works by querying the dataset instantly via Google BigQuery and displaying colors to represent congestion levels. These graphical illustrations show where congestion is located along a roadway during a typical day. The scans can pinpoint the exact location of congestion and help planners determine what is causing it. With this tool, staff can provide on-demand congestion scans for all CMP-monitored roadway corridors.

To date, staff have created congestion scans for 11 expressways and 22 major arterial roadways in the Boston Region MPO area. However, staff is studying many roadways in the Boston region that do not have congestion scans. Thus, a goal of this task is for IT&S staff to enhance the congestion scan tool to allow the instant generation of congestion scans on CMP-monitored roadways. In addition, MPO staff incurs a cost whenever it executes Google BigQuery. Hence, these costs will need to be managed.

Subtasks

Product of Task 6

Low-Priority Tasks

Task 7  Bicycle Parking/MBTA Park-and-Ride Lot Monitoring—$34,047 if Temporary Staff Collect Data; $50,961 if MPO Staff Collect Data, Including Direct Costs

In the past, Boston Region MPO staff have assembled both MBTA parking lot (2013) and bicycle parking inventories (2012) separately, and then shared this analysis with MassDOT and the MBTA. MassDOT has expressed interest in working with MPO staff to collect updated bicycle parking data at MBTA stations.

Two hundred and seventy-nine (279) MBTA stations would need to be surveyed for bicycle parking data. Additionally, the MBTA parking lots, which have not been surveyed since 2013, also would need to be updated. Because it is less costly to make a single visit to stations that offer parking for both modes, this collection effort will combine the data for both bicycle and automobile parking.

Station fare data may be available from the MBTA, which could help determine park-and-ride utilization. Bicycle parking data may be available from the MBTA for cyclists who are registered to store bikes in cages. This task could be spread out over two federal fiscal years, if necessary. In addition, this task may be better suited as a Unified Planning Work Program study rather than a CMP-based study.

Subtasks

Products of Task 7

Task 8  Create Quarterly Congestion Reports Performance Targets Using INRIX or NPMRDS Data—$8,521

One method of monitoring congestion management-related performance targets is to create periodic reports. These reports would display congestion trends for the entire Boston Region MPO area. Staff will create these reports quarterly. The performance measures will be calculated for the composite region, rather than being based on corridors or segments. Examples include:

Any performance measures that are selected for regional performance monitoring should be consistent with the LRTP. Freight performance measures also can be used if the NPMRDS is chosen for this activity.

Subtasks

Product of Task 8

Task 9  Congestion Management Strategies Toolbook—$22,539

In 2013, a congestion management report3 was completed that described the Boston Region MPO’s CMP. Chapter six of the report cited six strategies for improving a congested corridor:

  1. Travel demand management
  2. Use of nonmotorized modes
  3. Incident management
  4. Intelligent transportation systems
  5. Management and operations
  6. Public transportation

The proposed task would create a toolbook to detail each individual strategy, explain how to implement it, and provide a classic example of the strategy.

The study also would analyze the before-and-after effects of the strategies, such as the change in average speed or speed index if a particular strategy were implemented. This toolbook would be shared with local municipalities to show how low-cost strategies can improve congestion.

Subtasks

Product of Task 9

Task 10  Update Monitored Intersection Database—$35,225 (Estimated)

The MPO website contains an interactive tool that displays detailed information about many of the region’s intersections. This database contains data that were collected from various sources, such as speed runs, surveys, and independent studies. The database includes statistics about control signals, travel time delay, crash data, transit information, and bicycle and pedestrian information. 

This database was last updated in 2012 and currently contains outdated data. The task will require extensive work from both IT&S and CMP staff. Instead of conducting site visits to update the database, CMP staff will look at data collected from recent planning studies and MassDOT functional design reports. The original database contains more than 1,200 intersections. To reduce the workload of the update, staff will focus on only 100 intersections. The criteria displayed in the application will be simplified to make optimal use of data from previous studies. Because this update would require a lot of work by the IT&S group, it may be costly; however, it might be possible to spread this task over several federal fiscal years.

Subtasks

Product of Task 10

Task 11  MassDOT Park-and-Ride Monitoring—$12,278

Every few years, MassDOT park-and-ride lots are monitored, and parking utilization is reported through the CMP. Because MassDOT park-and-ride lots have not been monitored since 2011, they need to be monitored again. The monitoring process entails surveying each lot for parking capacity, parking utilization, and license plate numbers. The license plate numbers will be used to track origin-destination movement. Once the surveying has been completed, staff will write a short memorandum to explain the findings. This task can be spread over two federal fiscal years.

Subtasks

Products of Task 11

1 Cost does not include purchase of either dataset.

2 HERE is a company, owned by Nokia, that brings together mapping and location businesses under one brand, which the NPMRDS uses to collect data.

3 Boston Region MPO Congestion Management Process Performance-Based Planning for Efficiency, Mobility, and Safety, available online at http://www.ctps.org/cmp.