TIP ID | Proponent | Project Name | System Preservation, Modernization and Efficiency (36 points possible) | Improves substandard pavement (up to 6 points) | Improves substandard signal equipment condition (up to 6 points) | Improves traffic signal operations (up to 6 points) | In a Congestion Management Process Identified Area (up to 6 points) | Improves intermodal accommodations/connections to transit (up to 6 points) | Implements ITS strategies other than traffic signal operations (up to 6 points) | Livability and Economic Benefit (29 points possible) | Design is consistent with complete streets policies (up to 4 points) | Provides multimodal access to an activity center (up to 3 points) | Reduces auto dependency (up to 8 points) | Project serves a targeted development site (up to 6 points) | Consistent with MetroFuture compact growth strategies (up to 5 points) | Project improves Quality of Life (up to 3 points) | Mobility (25 points possible) | Existing peak hour level of service (LOS) (up to 3 points) | Improves or completes an identified freight movement issue (up to 3 points) | Address proponent identified primary mobility need (up to 3 points) | Addresses MPO identified primary mobility need (up to 3 points) | Project reduces congestion (up to 6 points) | Improves transit reliability (up to 7 points) | Environment and Climate Change (25 points possible) | Air Quality (improves or degrades) (up to 5 points) | CO2 reduction (up to 5 points) | Project is in an EOEEA certified _Green Community_ (up to 4 points) | Project reduces VMT/VHT (up to 7 points) | Addresses identified environmental impacts (up to 4 points) | Environmental Justice (10 points possible) | Improves transit for an EJ population (up to 3 points) | Design is consistent with complete streets policies in an EJ area (up to 4 points) | Addresses an MPO identified EJ transportation issue (up to 3 points) | Safety and Security (29 points possible) | Improves emergency response (up to 2 points) | Design effect ability to respond to extreme conditions (up to 6 points) | EPDO/Injury Value (up to 3 points) | Design addresses proponent identified primary safety need (up to 3 points) | Design addresses MPO identified primary safety need (up to 3 points) | Improves freight related safety issue (up to 3 points) | Improves bicycle safety (up to 3 points) | Improves pedestrian safety (up to 3 points) | Improves safety or removes an at grade railroad crossing (up to 3 points) | Total Score (154 points possible) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
606635 | Newton & Needham | Reconstruction of Highland Avenue, Needham Street & Charles River Bridge, from Webster Street to Route 9 | 30 | 6 | 4 | 6 | 6 | 4 | 4 | 15 | 3 | 3 | 1 | 3 | 3 | 2 | 13 | 2 | 2 | 3 | 2 | 4 | 0 | 18 | 5 | 5 | 4 | 2 | 2 | 6 | 1 | 3 | 2 | 20 | 2 | 1 | 3 | 3 | 3 | 3 | 2 | 3 | 0 | 102 |
600220 | Beverly | Reconstruction & Signal Improvements on Rantoul Street (Route 1A), from Cabot Street (South) to Cabot Street (North) | 28 | 4 | 4 | 6 | 4 | 6 | 4 | 18 | 4 | 3 | 1 | 2 | 5 | 3 | 15 | 2 | 2 | 3 | 3 | 4 | 1 | 18 | 5 | 5 | 4 | 2 | 2 | 0 | 0 | 0 | 0 | 19 | 1 | 2 | 3 | 3 | 3 | 1 | 2 | 3 | 1 | 98 |
606284 | Boston | Improvements to Commonwealth Avenue, from Amory Street to Alcorn Street | 28 | 6 | 6 | 6 | 4 | 6 | 0 | 16 | 4 | 3 | 0 | 3 | 3 | 3 | 15 | 2 | 0 | 3 | 3 | 6 | 1 | 9 | 1 | 1 | 4 | 1 | 2 | 8 | 1 | 4 | 3 | 20 | 2 | 2 | 2 | 3 | 3 | 1 | 3 | 3 | 1 | 96 |
606320 | Boston | Reconstruction of Causeway Street (Pedestrian & Bicycle Improvements) | 32 | 6 | 6 | 4 | 4 | 6 | 6 | 20 | 4 | 3 | 2 | 3 | 5 | 3 | 12 | 0 | 0 | 3 | 3 | 6 | 0 | 6 | 0 | 0 | 4 | 2 | 0 | 7 | 1 | 4 | 2 | 15 | 1 | 1 | 1 | 3 | 3 | 0 | 3 | 3 | 0 | 92 |
605034 | Natick | Reconstruction of Route 27 (North Main Street), from North Avenue to the Wayland Town Line | 32 | 4 | 6 | 6 | 6 | 4 | 6 | 16 | 3 | 3 | 1 | 3 | 3 | 3 | 14 | 2 | 0 | 3 | 3 | 6 | 0 | 9 | 1 | 1 | 4 | 2 | 1 | 0 | 0 | 0 | 0 | 15 | 1 | 1 | 1 | 3 | 3 | 1 | 2 | 3 | 0 | 86 |
605146 | Salem | Reconstruction on Canal Street, from Washington Street & Mill Street to Loring Avenue & Jefferson Avenue | 22 | 4 | 4 | 6 | 2 | 6 | 0 | 16 | 3 | 3 | 2 | 3 | 3 | 2 | 12 | 2 | 0 | 3 | 3 | 4 | 0 | 10 | 1 | 1 | 4 | 2 | 2 | 6 | 1 | 3 | 2 | 19 | 2 | 2 | 3 | 3 | 3 | 1 | 2 | 3 | 0 | 85 |
605313 | Natick | Bridge Replacement, Route 27 (North Main St.) over Route 9 (Worcester St.) and Interchange Improvements | 34 | 6 | 6 | 6 | 6 | 4 | 6 | 12 | 3 | 3 | 2 | 0 | 3 | 1 | 15 | 2 | 1 | 3 | 3 | 6 | 0 | 8 | 0 | 0 | 4 | 2 | 2 | 0 | 0 | 0 | 0 | 15 | 0 | 1 | 3 | 3 | 3 | 1 | 1 | 3 | 0 | 84 |
605110 | Brookline | Intersection & Signal Improvements at Route 9 & Village Square (Gateway East) | 30 | 6 | 6 | 6 | 6 | 6 | 0 | 19 | 3 | 3 | 1 | 4 | 5 | 3 | 14 | 3 | 2 | 2 | 2 | 4 | 1 | 10 | 1 | 1 | 4 | 2 | 2 | 0 | 0 | 0 | 0 | 11 | 0 | 0 | 1 | 2 | 2 | 1 | 2 | 3 | 0 | 84 |
29492 | Bedford, Billerica, & Burlington | Middlesex Turnpike Improvements, from Crosby Drive North to Manning Road (Phase III) | 28 | 6 | 6 | 6 | 6 | 2 | 2 | 9 | 3 | 3 | 2 | 0 | 0 | 1 | 18 | 3 | 2 | 3 | 3 | 6 | 1 | 13 | 3 | 3 | 4 | 2 | 1 | 3 | 1 | 2 | 0 | 12 | 0 | 0 | 1 | 3 | 3 | 1 | 1 | 3 | 0 | 83 |
604810 | Marlborough | Reconstruction of Route 85 (Maple Street) | 16 | 4 | 2 | 6 | 4 | 0 | 0 | 14 | 3 | 3 | 1 | 3 | 1 | 3 | 10 | 0 | 0 | 3 | 3 | 4 | 0 | 18 | 5 | 5 | 4 | 2 | 2 | 6 | 1 | 3 | 2 | 18 | 1 | 3 | 2 | 3 | 3 | 1 | 2 | 3 | 0 | 82 |
605657 | Medway | Reconstruction on Route 109, from Holliston Street to 100 Feet West of Highland Street | 28 | 4 | 6 | 6 | 6 | 0 | 6 | 13 | 3 | 2 | 2 | 0 | 3 | 3 | 10 | 2 | 0 | 2 | 2 | 4 | 0 | 16 | 5 | 5 | 4 | 2 | 0 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 3 | 3 | 3 | 1 | 2 | 3 | 0 | 82 |
606460 | Boston | Improvements at Audubon Circle | 24 | 4 | 4 | 6 | 4 | 6 | 0 | 14 | 3 | 3 | 0 | 3 | 3 | 2 | 11 | 2 | 0 | 2 | 2 | 4 | 1 | 9 | 1 | 1 | 4 | 2 | 1 | 7 | 1 | 3 | 3 | 13 | 0 | 0 | 1 | 3 | 3 | 0 | 3 | 3 | 0 | 78 |
601553 | Melrose | Intersection & Signal Improvement to Lebanon Street, from Lynde Street to Main Street | 26 | 6 | 4 | 6 | 4 | 4 | 2 | 12 | 2 | 2 | 0 | 2 | 3 | 3 | 13 | 2 | 1 | 3 | 2 | 4 | 1 | 11 | 3 | 3 | 4 | 1 | 0 | 0 | 0 | 0 | 0 | 15 | 1 | 1 | 2 | 3 | 3 | 1 | 1 | 3 | 0 | 77 |
605189 | Concord | Bruce Freeman Rail Trail, Phase 2C | 24 | 4 | 4 | 4 | 6 | 6 | 0 | 14 | 2 | 2 | 4 | 3 | 1 | 2 | 10 | 3 | 0 | 3 | 2 | 2 | 0 | 14 | 3 | 3 | 4 | 2 | 2 | 2 | 0 | 2 | 0 | 13 | 0 | 0 | 1 | 3 | 3 | 0 | 3 | 3 | 0 | 77 |
602261 | Walpole (MassDOT) | Reconstruction on Route 1A (Main Street), from the Norwood Town Line to Route 27 | 28 | 4 | 4 | 6 | 4 | 4 | 6 | 14 | 3 | 3 | 1 | 2 | 2 | 3 | 10 | 2 | 0 | 2 | 2 | 4 | 0 | 6 | 3 | 1 | 0 | 2 | 0 | 6 | 1 | 3 | 2 | 12 | 0 | 0 | 3 | 3 | 3 | 0 | 1 | 2 | 0 | 76 |
604652 | Winchester, Stoneham, & Woburn | Tri-Community Bikeway | 20 | 4 | 0 | 4 | 6 | 6 | 0 | 15 | 2 | 2 | 3 | 3 | 3 | 2 | 9 | 2 | 0 | 3 | 2 | 2 | 0 | 17 | 3 | 5 | 4 | 3 | 2 | 0 | 0 | 0 | 0 | 14 | 0 | 0 | 2 | 3 | 3 | 0 | 3 | 3 | 0 | 75 |
605729 | Quincy | Intersection & Signal Improvements at Hancock Street & East/West Squantum Streets | 24 | 4 | 4 | 6 | 4 | 6 | 0 | 11 | 2 | 2 | 0 | 2 | 2 | 3 | 10 | 0 | 0 | 3 | 3 | 4 | 0 | 7 | 1 | 1 | 4 | 1 | 0 | 5 | 1 | 2 | 2 | 17 | 2 | 2 | 2 | 3 | 3 | 1 | 0 | 3 | 1 | 74 |
604532 | Acton, Carlisle, & Westford | Bruce Freeman Rail Trail, Phase 2A | 24 | 4 | 4 | 4 | 6 | 6 | 0 | 14 | 2 | 2 | 4 | 3 | 1 | 2 | 8 | 2 | 0 | 2 | 2 | 2 | 0 | 10 | 1 | 1 | 4 | 2 | 2 | 2 | 0 | 2 | 0 | 13 | 0 | 0 | 1 | 3 | 3 | 0 | 3 | 3 | 0 | 71 |
604935 | Woburn | Reconstruction of Montvale Avenue, from I-93 Interchange to Central Street | 26 | 0 | 4 | 6 | 6 | 4 | 6 | 10 | 3 | 3 | 1 | 0 | 1 | 2 | 9 | 0 | 0 | 3 | 2 | 4 | 0 | 8 | 1 | 1 | 4 | 2 | 0 | 0 | 0 | 0 | 0 | 18 | 2 | 1 | 3 | 3 | 3 | 2 | 1 | 3 | 0 | 71 |
601704 | Newton | Reconstruction & Signal Improvements on Walnut Street, from Homer Street to Route 9 | 24 | 6 | 4 | 6 | 2 | 6 | 0 | 16 | 3 | 3 | 1 | 4 | 2 | 3 | 8 | 1 | 0 | 2 | 2 | 2 | 1 | 7 | 0 | 0 | 4 | 1 | 2 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 2 | 3 | 3 | 1 | 3 | 3 | 0 | 70 |
601513 | Saugus (MassDOT) | Interchange Reconstruction at Walnut Street & Route 1 (Phase II) | 22 | 6 | 6 | 6 | 4 | 0 | 0 | 12 | 3 | 3 | 3 | 0 | 1 | 2 | 15 | 3 | 1 | 3 | 3 | 4 | 1 | 7 | 1 | 1 | 0 | 3 | 2 | 0 | 0 | 0 | 0 | 13 | 1 | 0 | 3 | 3 | 3 | 0 | 1 | 2 | 0 | 69 |
602077 | Lynn | Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square | 20 | 4 | 0 | 6 | 6 | 4 | 0 | 8 | 2 | 2 | 0 | 0 | 2 | 2 | 11 | 0 | 0 | 3 | 3 | 4 | 1 | 9 | 3 | 3 | 0 | 1 | 2 | 5 | 1 | 2 | 2 | 16 | 2 | 2 | 2 | 3 | 3 | 1 | 0 | 3 | 0 | 69 |
604989 | Southborough | Reconstruction of Main Street (Route 30), from Sears Road to Park Street | 22 | 6 | 6 | 6 | 4 | 0 | 0 | 13 | 3 | 3 | 2 | 0 | 2 | 3 | 12 | 2 | 0 | 3 | 3 | 4 | 0 | 7 | 1 | 1 | 0 | 3 | 2 | 0 | 0 | 0 | 0 | 15 | 1 | 1 | 1 | 3 | 3 | 1 | 2 | 3 | 0 | 69 |
602310 | Danvers | Reconstruction on Collins Street, from Sylvan Street to Centre & Holten Streets | 20 | 6 | 6 | 6 | 2 | 0 | 0 | 13 | 2 | 2 | 2 | 3 | 2 | 2 | 14 | 3 | 1 | 3 | 1 | 6 | 0 | 6 | 1 | 1 | 0 | 2 | 2 | 2 | 0 | 2 | 0 | 13 | 0 | 0 | 1 | 3 | 3 | 1 | 2 | 3 | 0 | 68 |
601579 | Wayland | Signal & Intersection Improvements at Route 27 (Main Street) and Route 30 (Commonwealth Road) | 24 | 4 | 6 | 4 | 4 | 0 | 6 | 8 | 2 | 2 | 1 | 0 | 2 | 1 | 8 | 2 | 0 | 2 | 0 | 4 | 0 | 12 | 3 | 3 | 4 | 1 | 1 | 0 | 0 | 0 | 0 | 14 | 1 | 1 | 1 | 3 | 3 | 1 | 1 | 3 | 0 | 66 |
604531 | Acton & Maynard | Assabet River Rail Trail | 16 | 4 | 0 | 0 | 6 | 6 | 0 | 14 | 2 | 2 | 3 | 3 | 2 | 2 | 10 | 3 | 0 | 3 | 2 | 2 | 0 | 13 | 1 | 3 | 4 | 3 | 2 | 0 | 0 | 0 | 0 | 13 | 0 | 0 | 1 | 3 | 3 | 0 | 3 | 3 | 0 | 66 |
604377 | Gloucester | Washington Street and Railroad Avenue | 12 | 6 | 0 | 0 | 2 | 4 | 0 | 15 | 2 | 2 | 0 | 3 | 5 | 3 | 9 | 2 | 1 | 2 | 2 | 2 | 0 | 8 | 1 | 1 | 4 | 1 | 1 | 4 | 1 | 1 | 2 | 17 | 1 | 2 | 2 | 3 | 3 | 2 | 1 | 3 | 0 | 65 |
604231 | Marlborough | Intersection & Signal Improvements on Route 20 (East Main Street/Boston Post Road) at Concord Road | 24 | 4 | 6 | 6 | 6 | 0 | 2 | 4 | 1 | 1 | 0 | 0 | 0 | 2 | 16 | 3 | 1 | 3 | 3 | 6 | 0 | 7 | 1 | 1 | 4 | 0 | 1 | 3 | 0 | 1 | 2 | 10 | 0 | 0 | 1 | 3 | 3 | 0 | 0 | 3 | 0 | 64 |
607258 | Quincy | Intersection Improvements at Quincy Avenue & East Howard Street | 18 | 4 | 0 | 6 | 4 | 2 | 2 | 7 | 2 | 2 | 0 | 0 | 1 | 2 | 8 | 0 | 0 | 2 | 2 | 4 | 0 | 12 | 5 | 3 | 4 | 0 | 0 | 5 | 1 | 2 | 2 | 14 | 1 | 1 | 1 | 3 | 3 | 1 | 0 | 3 | 1 | 64 |
601705 | Reading | Reconstruction of West Street, from Woburn City Line to Summer Ave/Willow Street | 24 | 6 | 4 | 6 | 0 | 4 | 4 | 10 | 2 | 2 | 2 | 0 | 1 | 3 | 11 | 1 | 0 | 3 | 3 | 4 | 0 | 6 | 1 | 1 | 0 | 2 | 2 | 0 | 0 | 0 | 0 | 12 | 0 | 0 | 1 | 3 | 3 | 0 | 2 | 3 | 0 | 63 |
601019 | Winchester | Signal & Improvements at 4 Locations on Church Street & Route 3 (Cambridge Street) | 18 | 4 | 4 | 6 | 2 | 2 | 0 | 9 | 2 | 2 | 0 | 2 | 1 | 2 | 11 | 3 | 0 | 2 | 2 | 4 | 0 | 17 | 5 | 5 | 4 | 2 | 1 | 0 | 0 | 0 | 0 | 7 | 0 | 0 | 1 | 2 | 0 | 1 | 0 | 3 | 0 | 62 |
604996 | Woburn | Bridge Replacement, New Boston Street over MBTA | 12 | 0 | 0 | 0 | 6 | 6 | 0 | 19 | 2 | 2 | 3 | 6 | 4 | 2 | 11 | 0 | 1 | 3 | 3 | 4 | 0 | 13 | 3 | 3 | 4 | 3 | 0 | 0 | 0 | 0 | 0 | 7 | 0 | 0 | 0 | 0 | 0 | 1 | 2 | 3 | 1 | 62 |
606117 | Boston | Traffic Signal Improvements at 9 Locations | 16 | 0 | 4 | 6 | 2 | 2 | 2 | 11 | 2 | 2 | 0 | 0 | 5 | 2 | 8 | 2 | 0 | 3 | 3 | 0 | 0 | 7 | 1 | 1 | 4 | 1 | 0 | 5 | 1 | 2 | 2 | 13 | 1 | 1 | 1 | 3 | 3 | 1 | 1 | 2 | 0 | 60 |
605721 | Weymouth | Intersection Improvements at Middle Street, Libbey Industrial Parkway and Tara Drive | 20 | 4 | 6 | 6 | 2 | 2 | 0 | 9 | 2 | 2 | 1 | 0 | 2 | 2 | 16 | 3 | 1 | 3 | 3 | 6 | 0 | 4 | 1 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 11 | 0 | 0 | 1 | 3 | 3 | 1 | 0 | 3 | 0 | 60 |
600518 | Hingham (MassDOT) | Intersection Improvements at Derby Street, Whiting Street (Route 53) and Gardner Street | 22 | 4 | 6 | 6 | 6 | 0 | 0 | 10 | 2 | 2 | 2 | 0 | 1 | 3 | 13 | 2 | 0 | 3 | 3 | 4 | 1 | 2 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 12 | 0 | 0 | 2 | 3 | 3 | 0 | 1 | 3 | 0 | 59 |
602000 | Weston | Intersection & Signal Improvements at Route 30 (South Ave) & Wellesley Street | 18 | 6 | 0 | 6 | 6 | 0 | 0 | 5 | 1 | 1 | 1 | 0 | 0 | 2 | 12 | 2 | 0 | 3 | 3 | 4 | 0 | 12 | 3 | 3 | 4 | 1 | 1 | 0 | 0 | 0 | 0 | 11 | 0 | 0 | 1 | 3 | 3 | 1 | 0 | 3 | 0 | 58 |
606002 | Duxbury | Signal Installation at Route 3 (NB & SB) Ramps & Route 3A (Tremont St) | 20 | 0 | 6 | 6 | 2 | 0 | 6 | 4 | 1 | 0 | 1 | 0 | 1 | 1 | 17 | 3 | 2 | 3 | 3 | 6 | 0 | 3 | 1 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 13 | 1 | 1 | 1 | 3 | 3 | 1 | 0 | 3 | 0 | 57 |
604923 | Swampscott | Reconstruction of Humphrey Street and Salem Street | 6 | 4 | 0 | 0 | 0 | 2 | 0 | 17 | 4 | 3 | 1 | 4 | 2 | 3 | 9 | 0 | 0 | 3 | 3 | 2 | 1 | 10 | 1 | 1 | 4 | 2 | 2 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 2 | 3 | 3 | 1 | 3 | 3 | 0 | 57 |
602602 | Hanover (MassDOT) | Reconstruction of Washington Street (Route 53) and Related Work From the Route 3 Northbound Ramp to Webster Street (Route 123) | 20 | 4 | 0 | 6 | 4 | 0 | 6 | 9 | 2 | 2 | 2 | 0 | 1 | 2 | 11 | 0 | 0 | 3 | 2 | 6 | 0 | 7 | 0 | 1 | 4 | 2 | 0 | 0 | 0 | 0 | 0 | 9 | 0 | 0 | 2 | 2 | 2 | 1 | 1 | 1 | 0 | 56 |
603739 | Wrentham | Construction of I-495/Route 1A Ramps | 18 | 4 | 2 | 6 | 2 | 0 | 4 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 15 | 2 | 2 | 3 | 2 | 6 | 0 | 10 | 5 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 11 | 0 | 0 | 2 | 3 | 3 | 3 | 0 | 0 | 0 | 55 |
604697 | Marlborough | Reconstruction of Farm Road, from Cook Lane to Route 20 (Boston Post Road) | 20 | 6 | 4 | 6 | 4 | 0 | 0 | 7 | 1 | 1 | 1 | 0 | 2 | 2 | 6 | 0 | 0 | 2 | 2 | 2 | 0 | 8 | 1 | 1 | 4 | 1 | 1 | 3 | 0 | 1 | 2 | 11 | 0 | 0 | 1 | 3 | 3 | 1 | 0 | 3 | 0 | 55 |
605857 | Norwood | Intersection Improvements at Route 1 & University Avenue/Everett Street | 22 | 6 | 4 | 6 | 4 | 2 | 0 | 8 | 1 | 1 | 1 | 2 | 1 | 2 | 12 | 2 | 0 | 3 | 3 | 4 | 0 | 3 | 1 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 9 | 0 | 0 | 2 | 2 | 2 | 0 | 0 | 3 | 0 | 54 |
606130 | Norwood | Intersection Improvements at Route 1A & Upland Road/Washington Street & Prospect Street/Fulton Street | 20 | 6 | 6 | 6 | 2 | 0 | 0 | 5 | 2 | 0 | 1 | 0 | 0 | 2 | 10 | 3 | 1 | 3 | 3 | 0 | 0 | 5 | 1 | 1 | 0 | 2 | 1 | 0 | 0 | 0 | 0 | 13 | 0 | 1 | 1 | 3 | 3 | 2 | 0 | 3 | 0 | 53 |
606316 | Brookline | Pedestrian Bridge Rehabilitation over MBTA off Carlton Street | 10 | 4 | 0 | 0 | 0 | 6 | 0 | 7 | 2 | 2 | 2 | 0 | 0 | 1 | 8 | 0 | 0 | 3 | 3 | 2 | 0 | 11 | 1 | 1 | 4 | 3 | 2 | 5 | 1 | 2 | 2 | 12 | 0 | 0 | 0 | 3 | 2 | 0 | 3 | 3 | 1 | 53 |
604638 | Danvers & Peabody (MassDOT) | Mainline Improvements on Route 128 (Phase II) | 12 | 6 | 0 | 0 | 6 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 18 | 3 | 2 | 3 | 3 | 6 | 1 | 3 | 1 | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 13 | 1 | 1 | 3 | 3 | 3 | 2 | 0 | 0 | 0 | 47 |
605743 | Ipswich | Resurfacing & Related Work on Central & South Main Streets | 6 | 0 | 0 | 0 | 2 | 4 | 0 | 13 | 2 | 2 | 1 | 3 | 3 | 2 | 8 | 2 | 0 | 2 | 2 | 2 | 0 | 6 | 1 | 1 | 0 | 2 | 2 | 0 | 0 | 0 | 0 | 14 | 1 | 3 | 1 | 1 | 1 | 2 | 2 | 3 | 0 | 47 |
601359 | Franklin | Reconstruction of Pleasant Street, from Main Street to Chestnut Street | 12 | 4 | 4 | 4 | 0 | 0 | 0 | 11 | 2 | 2 | 2 | 2 | 1 | 2 | 6 | 0 | 0 | 2 | 2 | 2 | 0 | 4 | 1 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 12 | 0 | 0 | 2 | 2 | 2 | 1 | 2 | 3 | 0 | 45 |
601607 | Hull | Reconstruction of Atlantic Avenue and Related Work, from Nantasket Avenue to Cohasset Town Line | 6 | 6 | 0 | 0 | 0 | 0 | 0 | 11 | 2 | 2 | 2 | 0 | 2 | 3 | 2 | 0 | 0 | 0 | 0 | 2 | 0 | 8 | 1 | 1 | 0 | 2 | 4 | 0 | 0 | 0 | 0 | 16 | 1 | 3 | 1 | 3 | 2 | 1 | 2 | 3 | 0 | 43 |
604811 | Marlborough | Reconstruction of Route 20 (East Main Street), from Main Street Easterly to Lincoln Street | 6 | 0 | 0 | 0 | 4 | 2 | 0 | 4 | 1 | 1 | 0 | 0 | 0 | 2 | 11 | 3 | 2 | 2 | 2 | 2 | 0 | 7 | 1 | 1 | 4 | 0 | 1 | 3 | 0 | 1 | 2 | 11 | 1 | 1 | 2 | 1 | 1 | 1 | 1 | 3 | 0 | 42 |
603462 | Duxbury (MassDOT) | Intersection Improvements at Kingstown Way (Route 53) & Winter Street | 10 | 4 | 0 | 0 | 4 | 2 | 0 | 4 | 1 | 0 | 1 | 0 | 1 | 1 | 11 | 2 | 2 | 2 | 1 | 4 | 0 | 4 | 1 | 1 | 0 | 1 | 1 | 0 | 0 | 0 | 0 | 11 | 0 | 0 | 1 | 3 | 2 | 1 | 1 | 3 | 0 | 40 |
604745 | Wrentham | Reconstruction of Taunton Street (Route 152) | 6 | 6 | 0 | 0 | 0 | 0 | 0 | 10 | 2 | 2 | 2 | 0 | 2 | 2 | 2 | 0 | 0 | 1 | 1 | 0 | 0 | 4 | 1 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 14 | 0 | 1 | 1 | 3 | 3 | 1 | 2 | 3 | 0 | 36 |
TIP ID | Proponent | Project Name |
---|---|---|
604761 | Boston | Multi-Use Trail Construction (South Bay Harbor) From Ruggles Station to Fort Point Channel |
605789 | Boston | Reconstruction of Melnea Cass Boulevard |
606134 | Boston | Traffic Signal Improvements on Blue Hill Avenue and Warren Street |
602984 | Concord & Lincoln | Limited Access Highway Improvements at Route 2 & 2A, Between Crosby's Corner & Bedford Road |
604655 | Marshfield (MassDOT) | Bridge Replacement, Beach Street over the Cut River |
603711 | Needham & Wellesley (MassDOT) | Rehab/Replacement of 6 Bridges on I-95/Route 128 (Add-a-Lane Contract 5) |
N/A | Somerville & Medford | Green Line Extension Project (Phase II), Medford Hillside (College Avenue) to Mystic Valley Parkway/Route 16 |
601630 | Weymouth (MassDOT) | Reconstruction & Widening on Route 18 (Main Street), from Highland Place to Route 139 |
TIP ID | Proponent | Project Name |
---|---|---|
604123 | Ashland | Reconstruction on Route 126 (Pond Street), from the Framingham T.L. to the Holliston T.L. |
604369 | Beverly | Reconstruction & Improvements on Route 128 (Interchange 19) at Brimbal Avenue, Sohier Road, Dunham Road, Otis Road |
601274 | Boston | Reconstruction of Tremont Street, from Court Street to Boylston Street |
53001 | Boston | Northern Avenue Connector Roads (Phase 1) |
606226 | Boston | Reconstruction of Rutherford Avenue, from City Square to Sullivan Square |
606453 | Boston | Improvements on Boylston Street, from Intersection of Brookline Avenue & Park Drive to Ipswich Street |
900 | Canton | East-West Connector, between Pleasant St. & Route 138 |
603883 | Canton | Reconstruction on Route 138, from I-93 to Dan Road |
87790 | Canton, Dedham, Norwood & Westwood (MassDOT) | Interchange Improvements at I-95/I-93 (University Avenue, Dedham Street) |
606146 | Canton, Norwood & Westwood | Ramp Construction on I-95 (NB) & Improvements on Dedham Street |
1063 | Chelsea | Beacham and Williams Street |
1443 | Chelsea | Broadway Reconstruction |
953 | Chelsea | Spruce Street |
1441 | Concord | Route 62 (Main St) Phase 3 |
1450 | Concord | Route 117 (Fitchburg Turnpike) |
602091 | Concord | Improvements & Upgrades to Concord Rotary (Routes 2/2A/119) |
606223 | Concord, Acton | Bruce Freeman Rail Trail Construction, Phase II-B |
600650 | Duxbury | Route 3A (Tremont Street) Bridge |
942 | Duxbury | Intersection Improvements at Route 3A and Route 139 |
1313 | Everett | Bike to the Sea/ Northern Strand Community Trail |
649 | Everett & Malden | TeleCom Boulevard, Phase 2 |
955 | Framingham | Route 126 (Route 9 to Lincoln Street) |
602038 | Framingham | Edgell Road Corridor Project |
606109 | Framingham | Intersection Improvements at Route 126/135/MBTA & CSX Railroad |
1546 | Hingham | Derby Street Corridor Improvements |
602260 | Holbrook | Abington Avenue-Plymouth Street |
606501 | Holbrook | Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street |
607255 | Holbrook | Intersection Improvements and Related Work at Weymouth Street/Pine Street/Sycamore Street |
602929 | Holliston | Multi-Use Trail Construction on a Section of the Upper Charles Trail (2 Miles of Proposed 27 Miles) |
1006 | Hopkinton | School Street/W. Main Street Intersections |
606043 | Hopkinton | Signal & Intersection Improvements on Route 135 |
1047 | Hudson | South Street |
1488 | Hudson | Lincoln St. at Cox St. and Packard St. |
601906 | Hudson (MassDOT) | Bridge Replacement, Cox Street over the Assabet River |
603345 | Hudson & Marlborough (MassDOT) | Reconstruction on Routes I-290 & 495 and Bridge Replacement |
1139 | Hudson & Stow | Assabet River Rail Trail (through Stow) |
1141 | Lexington | West Lexington Greenway |
1157 | Lexington | East Mass Ave Intersections |
604619 | Lexington | Route 4/225 (Bedford Street) and Hartwell Avenue |
1319 | Lynn | Route 129 (Boston St./Washington St.) |
1320 | Lynn | Route 1 (Copeland Circle, Fox Hill Bridge) |
1321 | Lynn | Route 1A Lynnway at Blossom Street |
1322 | Lynn | Route 1A Lynnway intersection at Market St. |
1323 | Lynn | Route 1A Lynn (GE Bridge Nahant Rotary) |
1324 | Lynn | Blue Line Extension (Wonderland Connection) |
1454 | Lynn | Route 1 South (Jug handle lights at Goodwin Circle) |
601138 | Lynn | Traffic Signals at 4 Locations (Contract E) |
602081 | Lynn | Route 107 (Western Avenue)/ Eastern Avenue |
602093 | Lynn | Route 107 (Western Avenue) |
943 | Lynn | Broad Street/Lewis Street /Route 129 |
944 | Lynn | Boston Street - Hamilton Street |
374 | Lynn | Lynn Garage |
351 | Lynn, Malden, Revere & Saugus | Bike to the Sea, Phase 2 |
1454 | Lynnfield, Lynn & Peabody | Route 1 South (Jug handle lights at Goodwin Circle) |
605012 | Malden, Revere & Saugus (MassDOT) | Reconstruction & Widening on Route 1, from Route 60 to Route 99 |
605664 | Marshfield (MassDOT) | Resurfacing & Related Work on Route 3A |
1458 | Medford | Mystic River Linear Park |
1146 | Medford | Medford Square Parking |
1455 | Medford | Medford Square Phase 2 Improvements |
1456 | Medford | Medford Square Water Taxi Landing and related Park Improvements |
1457 | Medford | Medford Square Transit Center |
1167 | Medway | Route 109 (Milford Street) |
602134 | Medway | Resurfacing & Related Work on a Section of Village Street |
601551 | Melrose | Intersection & Signal Improvements at Main Street & Essex Street |
967 | Milford | Veteran's Memorial Drive/Alternate Route |
602364 | Millis | Reconstruction of Village Street, from Main Street (Route 109) to the Medway Town Line |
1066 | Natick | Cochituate Rail Trail, Phase Two |
607312 | Natick | Superstructure Replacement, Marion Street over MBTA |
1067 | Newton | Washington St., Phase 2 |
600932 | Newton | Reconstruction on Route 30 (Commonwealth Avenue), from Weston Town Line to Auburn Street |
1451 | Quincy | Quincy Center Multimodal MBTA Station |
5399 | Salem | Reconstruction of Bridge Street, from Flint Street to Washington Street |
1311 | Salem | Canal Street Bikeway |
600986 | Salem | Boston Street |
1461 | Somerville | Community Path (Phase 3) - Lowell to Lechmere |
600831 | Somerville (MassDOT) | I-93 Mystic Avenue Interchange (Design and Study) |
1064 | Southborough | Cordaville Road/Route 85 Rehabilitation |
1037 | Sudbury | Route 20/Horsepond Road |
1069 | Sudbury | Route 20/Wayside Inn Road |
1164 | Sudbury | Bruce Freeman Rail Trail, Phase 2D |
1305 | Sudbury | Bruce Freeman Rail Trail, Phase 2E |
971 | Sudbury | Old Sudbury Road (Route 27) |
607249 | Sudbury | Route 20/Landham Road Intersection |
997 | Walpole | Coney Street Interchange with Route 95 |
1151 | Walpole | Walpole Central Business District |
1152 | Walpole | Elm St Improvements |
600671 | Walpole (MassDOT) | Reconstruction of Route 1A, from Common Street to the Norfolk Town Line |
1153 | Woburn | Woburn Loop Bikeway Project |
1449 | Woburn | Route 38 (Main St.) Traffic Lights |
950 | Woburn | South Bedford Street |