Updated Statewide Bridge List for the Draft FFYs 2015-18 TIP
MassDOT Project ID ▼ MassDOT
Project Description▼
District Funding Source Currently Programmed
FFY 2014
Proposed Draft Amendment Three
FFY 2014
Draft FFY 2015 Updated Draft
FFY 2015
Draft FFY 2016 Updated Draft
FFY 2016
Draft FFY 2017 Updated Draft
FFY 2017
Draft FFY 2018 Updated Draft
FFY 2018
Prior
Funding
Total Funds Proposed in Draft FFYs 2015-18 TIP Future Funding Total TIP Funding Additional Information TFPC 4% 8% 12% SD FO Existing Ped Proposed Ped Existing Bike Proposed Bike
603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD-A-LANE - CONTRACT V) 6 ON $8,500,000 $8,500,000                 $8,500,000 $0   $8,500,000               X X X X
600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 ON $15,000,000 $15,000,000 $14,886,555 $14,886,555 $5,108,000 $5,108,000         $16,800,000 $19,994,555   $36,794,555 funded over four years; Total Cost = $35,108,000 $45,626,555         -1 none none none none
604660 EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018 OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OVER MBTA AND RIVERS EDGE DRIVE 4 GANS $50,704,030 $50,704,030                 $50,704,030 $0   $50,704,030 ABP-GANS+NFA Total Cost =
$81,695,030
            both sides both sides none none
605895 BELLINGHAM- BRIDGE DEMOLITION, B-06-011, ROUTE 126 OVER CSX RAILROAD (ABANDONED) & INSTALLATION OF BIKE PATH CULVERT 3 ON $2,059,246 $2,059,246                 $2,059,246 $0   $2,059,246   $1,555,200           none path none path
607338 GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) 4 ON $8,450,000 $8,450,000 $8,800,000 $5,506,585             $8,450,000 $5,506,585   $13,956,585 funded over two years; Total Cost = $13,956,585; was $17,250,000 $13,956,585       -1   both sides both sides none none
604796 DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK 6 ON $5,859,000 $5,859,000 $5,009,550 $1,192,805             $5,859,000 $1,192,805   $7,051,805 funded over two years; Total Cost = $7,051,805; was $10,868,550 $7,051,805       -1   both sides both sides none none
607273 FRANKLIN- BRIDGE DEMOLITION, F-08-005, OLD STATE ROUTE 140 OVER MBTA/CSX & NEW PEDESTRAIN BRIDGE CONSTRUCTION 3 ON     $1,780,272 $1,780,272               $1,780,272   $1,780,272   $1,709,061           none both sides none both sides
605883 DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH 6 ON     $3,029,032 $3,029,032               $3,029,032   $3,029,032   $3,118,708           none none none none
603008 WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 4 ON     $5,018,477 $5,018,477               $5,018,477   $5,018,477   $2,115,784           both sides both sides none none
600867 BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 6 ON     $1,600,000 $1,600,000 $12,500,000 $7,535,161 $1,000,000 $5,964,839       $15,100,000   $15,100,000 funded over three years; Total Cost = $15,100,000; cash flow adjustment to FFYs 2016-17 $13,933,960       -1   both sides both sides both sides  both sides
607345 COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET 5 OFF         $6,416,550 $6,416,550           $6,416,550   $6,416,550   $4,336,600 $4,510,064       -1 one side both sides none none
604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER 6 ON         $5,000,000 $5,000,000 $23,000,000 $18,035,161 $30,000,000 $30,000,000   $53,035,161 $31,964,839 $85,000,000 funded over five years; Total Cost = $85,000,000; $53,035,161 programmed within FFYs 2015-18 TIP) $50,600,000 $52,624,000     -1   both sides both sides none both sides
606632 HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER 3 OFF                 $12,727,339 $12,727,339   $12,727,339   $12,727,339   $7,657,850     $8,614,040 -1   one side one side none none
607133 QUINCY- BRIDGE REPLACEMENT, Q-01-039, ROBERTSON STREET OVER I-93/US 1/SR 3 6 OFF                 $6,004,908 $6,435,763   $6,435,763   $6,435,763 cost increase of $430,855 $4,929,600     $5,545,130 -1   both sides both sides none none
607685 BRAINTREE- BRIDGE REHABILITATION, B-21-060 AND B-21-061, ST 3 (SB) AND ST 3 (NB) OVER RAMP C (QUINCY ADAMS) 6 ON         $6,668,480 $6,668,480           $6,668,480   $6,668,480   $3,156,120 $3,282,365                
606553 HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) 6 ON         $8,554,209 $8,554,209 $2,879,981 $2,879,981       $11,434,190   $11,434,190 funded over two years; Total Cost = $11,434,190 $13,570,000 $14,112,800         both sides both sides both sides both sides
607507 WAKEFIELD- BRIDGE DECK REPLACEMENT, W-01-021 (2MF), HOPKINS STREET OVER I-95/ST 128 4 NHPP             $2,469,936 $2,469,936       $2,469,936   $2,469,936   $2,646,360   $2,862,303   -1   one side both sides none none
604655 MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER 5 OFF                 $4,822,854 $4,822,854   $4,822,854   $4,822,854   $3,767,422     $4,237,837 -1   none both sides none none
607533 WALTHAM- WOERD AVENUE OVER THE CHARLES RIVER  4 ON                 $2,873,360 $3,873,360   $3,873,360   $3,873,360 cost increase of $1,000,000 $2,254,560     $2,536,073 -1   both sides both sides none none
604952 LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) 4 ON             $4,150,000 $4,150,000 $16,250,000 $16,250,000   $20,400,000 $24,600,000 $45,000,000 funded over four years; Total Cost = $45,000,000 ($20,400,000 programmed within FFYs 2015-18 TIP) $41,432,760   $44,813,673   -1   one side   none none
PENDING DANVERS - BRIDGE REPLACEMENT, D-03-018, ROUTE 128 OVER WATERS RIVER 4 NHPP             $8,949,150 $8,949,150       $8,949,150   $8,949,150       $0       none none none none
607915 NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N-12-056 ON I-95/ROUTE 128 6 NHPP                 $1,724,400 $1,724,400   $1,724,400   $1,724,400   $1,724,400     $1,939,715     none none none none
Bridge Program Total $90,572,276 $90,572,276 $40,123,886 $33,013,726 $44,247,239 $39,282,400 $33,499,917 $42,449,067 $72,678,461 $75,833,716   $190,578,909      
Indicates a change in project cost
Indicates a project moved in to an earlier TIP element
Indicates a project moved out to a later TIP element  
Indicates a new addition to the TIP
Indicates removed from TIP