FFYs 2016-19 TIP Universe of Projects - Evaluation Results
TIP ID Proponent Project Name System Preservation, Modernization and Efficiency (36 points possible) Improves substandard pavement (up to 6 points) Improves substandard signal equipment condition (up to 6 points) Improves traffic signal operations (up to 6 points) Is in a Congestion Management Process identified area (up to 6 points) Improves intermodal accommodations/connections to transit (up to 6 points) Implements ITS strategies other than traffic signal operations (up to 6 points) Livability and Economic Benefit (29 points possible) Design is consistent with complete streets policies (up to 4 points) Provides multimodal access to an activity center (up to 3 points) Reduces auto dependency (up to 8 points) Serves a targeted development site (up to 6 points) Consistent with MetroFuture compact growth strategies (up to 5 points) Improves quality of life (up to 3 points) Mobility (25 points possible) Existing peak hour level of service (LOS) (up to 3 points) Improves or completes an identified freight movement issue (up to 3 points) Addresses proponent-identified primary mobility need (up to 3 points) Addresses MPO-identified primary mobility need (up to 3 points) Reduces congestion (up to 6 points) Improves transit reliability (up to 7 points) Environment and Climate Change (25 points possible) Improves or degrades air quality (up to 5 points) Reduces CO2 (up to 5 points) Is in an EOEEA certified “Green Community” (up to 4 points)   Reduces VMT/VHT (up to 7 points) Addresses identified environmental impacts (up to 4 points) Environmental Justice (10 points possible) Improves transit for an EJ population (up to 3 points) Design is consistent with complete streets policies and in an EJ area (up to 4 points) Addresses an MPO-identified EJ transportation issue (up to 3 points) Safety and Security (29 points possible) Improves emergency response (up to 2 points) Design affects ability to respond to extreme conditions (up to 6 points) EPDO/Injury Value (up to 3 points) Design addresses proponent-identified primary safety need (up to 3 points) Design addresses MPO-identified primary safety need (up to 3 points) Improves freight related safety issue (up to 3 points) Improves bicycle safety (up to 3 points) Improves pedestrian safety (up to 3 points) Improves safety or removes an at grade railroad crossing (up to 3 points) Total Score (154 points possible)
606635 Newton & Needham Reconstruction of Highland Avenue, Needham Street & Charles River Bridge, from Webster Street to Route 9 30 6 4 6 6 4 4 17 3 3 1 3 5 2 13 2 2 3 2 4 0 18 5 5 4 2 2 6 1 3 2 20 2 1 3 3 3 3 2 3 0 104
606284 Boston Improvements to Commonwealth Avenue, from Amory Street to Alcorn Street 28 6 6 6 4 6 0 16 4 3 0 3 3 3 15 2 0 3 3 6 1 9 1 1 4 1 2 8 1 4 3 20 2 2 2 3 3 1 3 3 1 96
607981 Somerville
(MassDOT)
McGrath Boulevard Project 30 6 6 6 6 6 0 18 3 3 1 4 5 2 13 3 0 3 3 4 0 12 3 3 4 2 0 9 3 3 3 14 0 0 2 3 3 0 3 3 0 96
607652 Everett Reconstruction of Ferry Street 30 6 6 6 6 4 2 12 2 2 0 2 3 3 14 2 2 3 3 4 0 11 3 3 4 1 0 5 1 2 2 18 1 2 3 3 3 2 1 3 0 90
605034 Natick Reconstruction of Route 27 (North Main Street), from North Avenue to the Wayland town line 32 4 6 6 6 4 6 16 3 3 1 3 3 3 14 2 0 3 3 6 0 9 1 1 4 2 1 0 0 0 0 17 1 1 3 3 3 1 2 3 0 88
607409 Lexington Reconstruction on Massachusetts Avenue, from Marrett Road to Pleasant Street 30 4 6 6 6 4 4 10 3 3 1 0 1 2 15 3 1 3 3 4 1 8 1 1 4 2 0 6 1 3 2 18 1 1 2 3 3 2 3 3 0 87
605146 Salem Reconstruction on Canal Street, from Washington Street and Mill Street to Loring Avenue and Jefferson Avenue 22 4 4 6 2 6 0 16 3 3 2 3 3 2 12 2 0 3 3 4 0 10 1 1 4 2 2 6 1 3 2 19 2 2 3 3 3 1 2 3 0 85
605110 Brookline Intersection and signal improvements at Route 9 and Village Square (Gateway East) 30 6 6 6 6 6 0 19 3 3 1 4 5 3 14 3 2 2 2 4 1 10 1 1 4 2 2 0 0 0 0 12 0 0 1 2 2 1 3 3 0 85
606043 Hopkinton Signal and intersection improvements on Route 135 24 6 4 4 6 2 2 14 3 3 2 0 3 3 14 3 1 3 3 4 0 16 5 5 4 2 0 0 0 0 0 17 1 1 3 3 2 3 2 2 0 85
605313 Natick Bridge replacement, Route 27 (North Main St.) over Route 9 (Worcester St.) and interchange improvements 34 6 6 6 6 4 6 12 3 3 2 0 3 1 15 2 1 3 3 6 0 8 0 0 4 2 2 0 0 0 0 15 0 1 3 3 3 1 1 3 0 84
604810 Marlborough Reconstruction of Route 85 (Maple Street) 16 4 2 6 4 0 0 15 3 3 1 4 1 3 10 0 0 3 3 4 0 18 5 5 4 2 2 6 1 3 2 19 1 3 3 3 3 1 2 3 0 84
29492 Bedford, Billerica, and Burlington Middlesex Turnpike Improvements, from Crosby Drive North to Manning Road (Phase III) 28 6 6 6 6 2 2 9 3 3 2 0 0 1 18 3 2 3 3 6 1 13 3 3 4 2 1 3 1 2 0 12 0 0 1 3 3 1 1 3 0 83
606453 Boston Improvements on Boylston Street, from intersection of Brookline Avenue and Park Drive to Ipswich Street 16 4 0 6 0 4 2 18 3 3 1 4 5 2 14 3 1 3 3 4 0 16 5 5 4 2 0 5 1 2 2 14 0 0 2 3 3 0 3 3 0 83
605657 Medway Reconstruction on Route 109, from Holliston Street to 100 feet west of Highland Street 28 4 6 6 6 0 6 13 3 2 2 0 3 3 10 2 0 2 2 4 0 16 5 5 4 2 0 0 0 0 0 15 0 0 3 3 3 1 2 3 0 82
602261 Walpole (MassDOT) Reconstruction on Route 1A (Main Street), from the Norwood town line to Route 27 28 4 4 6 4 4 6 14 3 3 1 2 2 3 10 2 0 2 2 4 0 6 3 1 0 2 0 6 1 3 2 12 0 0 3 3 3 0 1 2 0 76
604652 Winchester, Stoneham, and Woburn Tri-Community Bikeway 20 4 0 4 6 6 0 15 2 2 3 3 3 2 9 2 0 3 2 2 0 17 3 5 4 3 2 0 0 0 0 14 0 0 2 3 3 0 3 3 0 75
604935 Woburn Reconstruction of Montvale Avenue, from I-93 Interchange to Central Street 30 4 4 6 6 4 6 10 3 3 1 0 1 2 9 0 0 3 2 4 0 8 1 1 4 2 0 0 0 0 0 18 2 1 3 3 3 2 1 3 0 75
605189 Concord Bruce Freeman Rail Trail, Phase 2C 24 4 4 4 6 6 0 14 2 2 4 3 1 2 10 3 0 3 2 2 0 10 1 1 4 2 2 2 0 2 0 13 0 0 1 3 3 0 3 3 0 73
604989 Southborough Reconstruction of Main Street (Route 30), from Sears Road to Park Street 22 6 6 6 4 0 0 13 3 3 2 0 2 3 12 2 0 3 3 4 0 11 3 3 0 3 2 0 0 0 0 15 1 1 1 3 3 1 2 3 0 73
607309 Hingham  Reconstruction and related work on Derby Street from Pond Park Road to Cushing Street 22 4 6 6 2 0 4 9 2 2 2 0 1 2 15 2 3 3 3 4 0 8 3 3 0 2 0 0 0 0 0 17 0 0 3 3 3 3 2 3 0 71
602077 Lynn Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square 20 4 0 6 6 4 0 8 2 2 0 0 2 2 13 2 0 3 3 4 1 9 3 3 0 1 2 5 1 2 2 16 2 2 2 3 3 1 0 3 0 71
606117 Boston Traffic signal improvements at 11 locations 20 4 4 6 2 2 2 13 2 2 0 2 5 2 12 2 0 3 3 4 0 7 1 1 4 1 0 5 1 2 2 14 1 1 1 3 3 1 1 3 0 71
604123 Ashland Reconstruction on Route 126 (Pond Street), from the Framingham town line to the Holliston town line 18 4 4 4 2 4 0 15 3 3 2 3 2 2 8 1 0 3 2 2 0 9 1 1 4 3 0 6 1 3 2 15 0 0 3 3 3 1 2 3 0 71
601579 Wayland Signal and intersection improvements at Route 27 (Main Street) and Route 30 (Commonwealth Road) 24 4 6 4 4 0 6 10 3 3 1 0 2 1 10 2 0 2 2 4 0 12 3 3 4 1 1 0 0 0 0 14 1 1 1 3 3 1 1 3 0 70
601704 Newton Reconstruction and signal improvements on Walnut Street, from Homer Street to Route 9 24 6 4 6 2 6 0 16 3 3 1 4 2 3 8 1 0 2 2 2 1 7 0 0 4 1 2 0 0 0 0 15 0 0 2 3 3 1 3 3 0 70
601513 Saugus (MassDOT) Interchange reconstruction at Walnut Street and Route 1 (Phase II) 22 6 6 6 4 0 0 12 3 3 3 0 1 2 15 3 1 3 3 4 1 7 1 1 0 3 2 0 0 0 0 13 1 0 3 3 3 0 1 2 0 69
N/A Everett Rehabilitation of Beacham Street 20 6 6 6 0 2 0 10 2 2 1 0 2 3 8 0 2 3 3 0 0 9 1 1 4 2 1 4 1 1 2 18 0 1 2 3 2 3 2 2 3 69
604531 Acton and Maynard Assabet River Rail Trail 16 4 0 0 6 6 0 14 2 2 3 3 2 2 10 3 0 3 2 2 0 13 1 3 4 3 2 2 0 2 0 13 0 0 1 3 3 0 3 3 0 68
602310 Danvers Reconstruction on Collins Street, from Sylvan Street to Centre and Holten Streets 20 6 6 6 2 0 0 13 2 2 2 3 2 2 14 3 1 3 1 6 0 6 1 1 0 2 2 2 0 2 0 13 0 0 1 3 3 1 2 3 0 68
605721 Weymouth Intersection improvements at Middle Street, Libbey Industrial Parkway and Tara Drive 20 4 6 6 2 2 0 12 3 3 2 0 2 2 16 3 1 3 3 6 0 5 1 1 0 3 0 0 0 0 0 15 1 1 1 3 3 1 2 3 0 68
604231 Marlborough Intersection & Signal Improvements on Route 20 (East Main Street/Boston Post Road) at Concord Road 24 4 6 6 6 0 2 7 1 1 0 3 0 2 16 3 1 3 3 6 0 7 1 1 4 0 1 3 0 1 2 10 0 0 1 3 3 0 0 3 0 67
607428 Milford Resurfacing and intersection improvements on Route 16 (Main Street), from Water Street to the Hopedale town line

18 6 4 4 2 2 0 11 2 2 1 2 2 2 13 2 2 3 2 4 0 4 1 1 0 1 1 6 1 3 2 15 1 1 2 3 2 1 2 3 0 67
607255 Holbrook Intersection improvements and related work at Weymouth Street/Pine Street/Sycamore Street 24 4 6 6 0 4 4 6 2 0 1 0 1 2 13 3 0 3 3 4 0 7 3 3 0 1 0 0 0 0 0 16 1 1 2 3 3 0 3 3 0 66
604377 Gloucester Washington Street and Railroad Avenue 12 6 0 0 2 4 0 15 2 2 0 3 5 3 9 2 1 2 2 2 0 8 1 1 4 1 1 4 1 1 2 17 1 2 2 3 3 2 1 3 0 65
607888 Boston Multi-use path construction on New Fenway 6 0 0 0 0 6 0 17 2 2 3 3 5 2 11 3 0 3 3 2 0 13 1 3 4 3 2 5 1 2 2 13 0 0 1 3 3 0 3 3 0 65
604996 Woburn Bridge replacement, New Boston Street over MBTA 12 0 0 0 6 6 0 19 2 2 3 6 4 2 11 0 1 3 3 4 0 13 3 3 4 3 0 0 0 0 0 7 0 0 0 0 0 1 2 3 1 62
606002 Duxbury Signal installation at Route 3 (NB and SB) ramps and Route 3A (Tremont Street) 24 4 6 6 2 0 6 4 1 0 1 0 1 1 17 3 2 3 3 6 0 3 1 1 0 1 0 0 0 0 0 13 1 1 1 3 3 1 0 3 0 61
607732 Natick Cochituate Rail Trail, Phase Two 6 0 0 0 0 6 0 14 2 2 3 3 2 2 10 2 0 3 3 2 0 12 1 3 4 3 1 3 1 2 0 15 0 0 3 3 3 0 3 3 0 60
600518 Hingham (MassDOT) Intersection improvements at Derby Street, Whiting Street (Route 53) and Gardner Street 22 4 6 6 6 0 0 10 2 2 2 0 1 3 13 2 0 3 3 4 1 2 0 0 0 0 2 0 0 0 0 12 0 0 2 3 3 0 1 3 0 59
606316 Brookline Pedestrian bridge rehabilitation over MBTA off Carlton Street 10 4 0 0 0 6 0 13 2 2 2 3 3 1 8 0 0 3 3 2 0 11 1 1 4 3 2 5 1 2 2 12 0 0 0 3 2 0 3 3 1 59
603739 Wrentham
(MassDOT)
Construction of I-495/Route 1A ramps 18 4 2 6 2 0 4 1 0 0 0 0 0 1 15 2 2 3 2 6 0 10 5 5 0 0 0 0 0 0 0 11 0 0 2 3 3 3 0 0 0 55
606130 Norwood Intersection improvements at Route 1A and Upland Road/Washington Street and Prospect Street/Fulton Street 20 6 6 6 2 0 0 7 2 0 1 1 1 2 10 3 1 3 3 0 0 5 1 1 0 2 1 0 0 0 0 13 0 1 1 3 3 2 0 3 0 55
605857 Norwood Intersection improvements at Route 1 and University Avenue/Everett Street 22 6 4 6 4 2 0 8 1 1 1 2 1 2 12 2 0 3 3 4 0 3 1 1 0 1 0 0 0 0 0 9 0 0 2 2 2 0 0 3 0 54
605743 Ipswich Resurfacing and related work on Central and South Main Streets 10 4 0 0 2 4 0 13 2 2 1 3 3 2 8 2 0 2 2 2 0 6 1 1 0 2 2 0 0 0 0 14 1 3 1 1 1 2 2 3 0 51
604811 Marlborough Reconstruction of Route 20 (East Main Street), from Main Street easterly to Lincoln Street 10 4 0 0 4 2 0 9 1 1 0 2 3 2 11 3 2 2 2 2 0 7 1 1 4 0 1 3 0 1 2 11 1 1 2 1 1 1 1 3 0 51
604638 Danvers and Peabody (MassDOT) Mainline improvements on Route 128 (Phase II) 12 6 0 0 6 0 0 3 0 0 0 1 1 1 18 3 2 3 3 6 1 3 1 1 0 0 1 0 0 0 0 13 1 1 3 3 3 2 0 0 0 49
606501 Holbrook Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street 10 6 0 0 0 4 0 13 2 2 2 4 1 2 7 1 0 3 3 0 0 5 1 1 0 3 0 0 0 0 0 13 0 0 1 3 2 1 3 3 0 48
601359 Franklin Reconstruction of Pleasant Street, from Main Street to Chestnut Street 12 4 4 4 0 0 0 11 2 2 2 2 1 2 6 0 0 2 2 2 0 4 1 1 0 2 0 0 0 0 0 12 0 0 2 2 2 1 2 3 0 45
601607 Hull Reconstruction of Atlantic Avenue and related work, from Nantasket Avenue to Cohasset town line 6 6 0 0 0 0 0 11 2 2 2 0 2 3 2 0 0 0 0 2 0 8 1 1 0 2 4 0 0 0 0 16 1 3 1 3 2 1 2 3 0 43
604745 Wrentham Reconstruction of Taunton Street (Route 152) 6 6 0 0 0 0 0 10 2 2 2 0 2 2 2 0 0 1 1 0 0 4 1 1 0 2 0 0 0 0 0 14 0 1 1 3 3 1 2 3 0 36