The proposed budget below reflects continuing, cooperative, and comprehensive transportation planning (3C) funds, consisting of Federal Highway Administration (FHWA) metropolitan planning (PL) funds and Federal Transit Administration (FTA) Section 5303 funds that the Central Transportation Planning Staff (CTPS) expects to receive for federal fiscal year (FFY) 2016. CTPS has received its estimated FFY 2016 FHWA PL allocation of $2,708,771, which includes a state match. Until final allocations have been determined, CTPS assumes that its FTA Section 5303 allocation will be level-funded compared to FFY 2015 and has estimated $1,301,271 in MPO Section 5303 funds, which includes a state match, for FFY 2016.
This proposed budget also reflects projects funded with State Planning and Research (SPR), FTA Section 5303, and other funds from the Massachusetts Department of Transportation (MassDOT); projects funded with Massachusetts Bay Transportation Authority (MBTA) funds; and projects funded from other sources.
Amounts have been rounded to the nearest $10. Project status and financial data on this sheet are subject to change.
Project ID | CTPS Administration and Resource Management Projects | Total Budget or Contract Amount | FFY 2015 CTPS UPWP Budget | Expected Project Status as of 10/1/2015 | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
60405-60492 | Computer Resources Management | Not applicable | $441,900 | Ongoing | $334,810 | $143,490 | $0 | $0 | $0 | $0 | $0 | $478,300 | No notes. |
60120-60600 | Data Resource Management | Not applicable | $357,300 | Ongoing | $213,730 | $109,510 | $0 | $0 | $0 | $0 | $0 | $323,240 | The budget for the Data Resources Management project has been increased by $19,340 since the April 16, 2015 UPWP Committee meeting (previous budget was $303,900). |
90000 | Direct Support | Not applicable | $82,070 | Ongoing | $50,000 | $22,500 | $15,000 | $0 | $6,000 | $77,870 | $100 | $171,470 | No notes. |
Null | Administration and Resource Management Projects Subtotal | Null | $881,270 | Null | $598,540 | $275,500 | $15,000 | $0 | $6,000 | $77,870 | $100 | $973,010 | Null |
Project ID | CTPS Certification Requirements Projects | Total Budget or Contract Amount | FFY 2015 CTPS UPWP Budget | Expected Project Status as of 10/1/2015 | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
90011 | Support to the MPO and Its Committees | Not applicable | $215,300 | Ongoing | $183,610 | $78,690 | $0 | $0 | $0 | $0 | $0 | $262,300 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90014 | Planning Topics | Not applicable | $13,200 | Ongoing | $2,240 | $960 | $0 | $0 | $0 | $0 | $0 | $3,200 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90019 | Subregional Outreach | Not applicable | $3,700 | Ongoing | $3,360 | $1,440 | $0 | $0 | $0 | $0 | $0 | $4,800 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90021 | Regional Transportation Advisory Council Committee Support | Not applicable | $83,200 | Ongoing | $52,360 | $22,440 | $0 | $0 | $0 | $0 | $0 | $74,800 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90025 | TRANSReport | Not applicable | $34,400 | Ongoing | $21,980 | $9,420 | $0 | $0 | $0 | $0 | $0 | $31,400 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90026 | Public Participation Process | Not applicable | $89,400 | Ongoing | $67,410 | $28,890 | $0 | $0 | $0 | $0 | $0 | $96,300 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90012 | Professional Development | Not applicable | $15,000 | Ongoing | $10,500 | $4,500 | $0 | $0 | $0 | $0 | $0 | $15,000 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. |
90090 | General Graphics | Not applicable | $57,000 | Ongoing | $63,420 | $27,180 | $0 | $0 | $0 | $0 | $0 | $90,600 | This item will be included in the 3C Planning and MPO Support budget in the FFY 2016 UPWP document. The proposed General Graphics budget has been reduced by $9,700 (previous total budget was $100,300). These funds have been transferred to the Provision of Materials of Accessible Formats project (previous budget was $59,700). |
90024 | Access Advisory Committee Support | Not applicable | $86,200 | Ongoing | $60,130 | $25,770 | $0 | $0 | $0 | $0 | $0 | $85,900 | No notes. |
90061 | Air Quality Conformity Determinations and Support | Not applicable | $52,100 | Ongoing | $17,150 | $7,350 | $0 | $0 | $0 | $0 | $0 | $24,500 | No notes. |
11355 | Boston Region MPO Title VI Reporting | Not applicable | $17,200 | Ongoing | $22,400 | $9,600 | $0 | $0 | $0 | $0 | $0 | $32,000 | No notes. |
10101 | Long Range Transportation Plan | Not applicable | $271,200 | Ongoing | $238,840 | $102,360 | $0 | $0 | $0 | $0 | $0 | $341,200 | No notes. |
90028 | Provision of Materials in Accessible Formats | Not applicable | $72,100 | Ongoing | $47,880 | $20,520 | $0 | $0 | $0 | $0 | $0 | $68,400 | The proposed General Graphics budget has been reduced by $9,700 (previous total budget was $100,300) since the April 16, 2015 UPWP Committee meeting. These funds have been transferred to the Provision of Materials of Accessible Formats project (previous budget was $59,700). |
11124 | Regional Model Enhancement | Not applicable | $766,800 | Ongoing | $518,280 | $294,600 | $0 | $0 | $0 | $0 | $0 | $740,400 | The previously-listed Integrating Land Use in Regional Transportation Models project, and its proposed budget of $99,600, have been folded into the Regional Model Enhancement program since the April 16, 2015 UPWP Committee meeting. The FFY 2015 UPWP Budget value reflects the FFY 2015 UPWP budgets of both the Integrating Land Use in Regional Transportation Models project and the Regional Model Enhancement program. |
11147 | Transportation Equity / Environmental Justice Support | Not applicable | $111,900 | Ongoing | $70,630 | $30,270 | $0 | $0 | $0 | $0 | $0 | $100,900 | No notes. |
10103 | Transportation Improvement Program | Not applicable | $174,400 | Ongoing | $121,940 | $52,260 | $0 | $0 | $0 | $0 | $0 | $174,200 | No notes. |
10104 | Unified Planning Work Program (CTPS) | Not applicable | $102,200 | Ongoing | $68,600 | $29,400 | $0 | $0 | $0 | $0 | $0 | $98,000 | No notes. |
null | Certification Requirements Subtotal | null | $2,165,300 | null | $1,570,730 | $673,170 | $0 | $0 | $0 | $0 | $0 | $2,243,900 | No notes. |
Project ID | CTPS Planning Studies | Total Budget or Contract Amount | FFY 2015 CTPS UPWP Budget | Expected Project Status as of 10/1/2015 | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
13266 | Addressing Safety, Mobility, and Access on Subregional Priority Roadways: FFY 2015 | $110,000 | $110,000 | 98% | $770 | $330 | $0 | $0 | $0 | $0 | $0 | $1,100 | No notes. |
13208 | Bicycle/Pedestrian Support Activities | Not applicable | $40,000 | Ongoing | $33,180 | $14,220 | $0 | $0 | $0 | $0 | $0 | $47,400 | No notes. |
11123 | Congestion Management Process | Not applicable | $92,000 | Ongoing | $64,540 | $27,660 | $0 | $0 | $0 | $0 | $0 | $92,200 | No notes. |
23326 | Core Capacity Constraints | $120,000 | $120,000 | 90% | $8,890 | $3,810 | $0 | $0 | $0 | $0 | $0 | $12,700 | No notes. |
11249 | Fairmount Line Station Access Analysis | $40,000 | $40,000 | 75% | $560 | $240 | $0 | $0 | $0 | $0 | $0 | $800 | No notes. |
22236 | Green Line Extension: Completion of New Starts Analysis | To be determined | $12,000 | 93% | $0 | $0 | $0 | $0 | $0 | $18,550 | $0 | $18,550 | No notes. |
73216 | I-93/I-95 Interchange Improvements North of Boston: Modeling Support | $215,980 | $42,500 | 79% | $0 | $0 | $0 | $44,720 | $0 | $0 | $0 | $44,720 | No notes. |
TBD | MassDOT Highway Division On-Call Modeling Support | $400,000 | Not applicable | Contract | $0 | $0 | $0 | $137,800 | $0 | $0 | $0 | $137,800 | This line item reflects salary and overhead costs associated with an anticipated contract. This contract will include multiple individual projects. Not all of these projects have been identified or programmed. |
22125 | Massport Technical Assistance: SFY 2015-17a | $150,000 | $37,500 | Contract | $0 | $0 | $0 | $0 | $0 | $0 | $11,790 | $11,790 | This line item reflects salary and overhead costs associated with an anticipated contract. This contract will include multiple individual projects. Not all of these projects have been identified or programmed. |
22208 | McGrath Boulevard Area Traffic Analysis: Modeling Support | To be determined | Not applicable | 95% | $0 | $0 | $0 | $6,700 | $0 | $0 | $0 | $6,700 | No notes. |
13267 | Priority Corridors for LRTP Needs Assessment: FFY 2015 | $110,000 | $110,000 | 98% | $770 | $330 | $0 | $0 | $0 | $0 | $0 | $1,100 | No notes. |
73218 | Route 3 South Express Toll Lanes – Public-Private Partnership Study: Modeling Support | $197,970 | Not applicable | 81% | $0 | $0 | $0 | $37,040 | $0 | $0 | $0 | $37,040 | No notes. |
null | Planning Studies Subtotal | null | $604,000 | null | $108,710 | $46,590 | $0 | $226,260 | $0 | $18,550 | $11,790 | $411,900 | No notes. |
Project ID | CTPS Technical Support Operations Analysis Projects | Total Budget or Contract Amount | FFY 2015 CTPS UPWP Budget | Expected Project Status as of 10/1/2015 | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
13150 | Community Transportation Technical Assistance Program | Not applicable | $38,700 | Ongoing | $28,420 | $12,180 | $0 | $0 | $0 | $0 | $0 | $40,600 | This project also receives funding from MAPC; these additional funds are accounted for in MAPC's draft FFY 2016 UPWP budget. |
11145 | Freight Planning Support | Not applicable | $41,000 | 0% | $46,000 | $0 | $0 | $0 | $0 | $0 | $0 | $46,000 | No notes. |
11152 | Household-Survey-Based Travel Profiles and Trends: Selected Policy Topics | $75,000 | $75,000 | 98% | $1,050 | $450 | $0 | $0 | $0 | $0 | $0 | $1,500 | No notes. |
14344 | Intercity Bus and Rail Maps | $110,270 | $40,000 | 43% | $0 | $0 | $0 | $39,930 | $0 | $0 | $0 | $39,930 | No notes. |
13801 | Livable Communities Workshop Program | Not applicable | $39,600 | Ongoing | $17,640 | $7,560 | $0 | $0 | $0 | $0 | $0 | $25,200 | This project also receives funding from MAPC; these additional funds are accounted for in MAPC's draft FFY 2016 UPWP budget. |
Varies by Project | MassDOT SPR Program Support | $495,000 | $559,000 | Contract | $0 | $0 | $480,000 | $0 | $0 | $0 | $0 | $480,000 | This line item reflects salary and overhead costs associated with an anticipated contract with MassDOT. This contract will include multiple individual projects. Not all of these projects have been identified or programmed. |
13154 | MassDOT Title VI Program: FFY 2014 | To be determined | $70,000 | 60% | $0 | $0 | $0 | $72,490 | $0 | $0 | $0 | $72,490 | No notes. |
13156 | MassDOT Title VI Program: FFY 2015 | To be determined | $40,000 | To be determined | $0 | $0 | $0 | $1,750 | $0 | $0 | $0 | $1,750 | No notes. |
Varies by Project | MassDOT Transit Planning Assistance | $256,000 | $264,770 | Contract | $0 | $0 | $0 | $0 | $250,000 | $0 | $0 | $250,000 | This line item reflects salary and overhead costs associated with an anticipated contract with MassDOT. This contract will include multiple individual projects. Not all of these projects have been identified or programmed. |
14341 | MBTA 2015 National Transit Database: Data Collection and Analysis | $130,000 | $88,000 | 97% | $0 | $0 | $0 | $0 | $0 | $2,070 | $0 | $2,070 | No notes. |
14345 | MBTA 2016 National Transit Database: Data Collection and Analysis | $135,000 | $31,250 | 5% | $0 | $0 | $0 | $0 | $0 | $89,630 | $0 | $89,630 | No notes. |
To be determined | MBTA 2017 National Transit Database: Data Collection and Analysis | $135,000 | Not applicable | 0% | $0 | $0 | $0 | $0 | $0 | $32,520 | $0 | $32,520 | No notes. |
To be determined | MBTA 2016 Review of Fare Structure, Tariff's and Policy | $110,000 | Not applicable | 25% | $0 | $0 | $0 | $0 | $0 | $112,590 | $0 | $112,590 | No notes. |
11395 | MBTA 2016 Title VI Program Monitoring | $117,000 | $3,500 | 1% | $0 | $0 | $0 | $0 | $0 | $102,460 | $0 | $102,460 | No notes. |
11384 | MBTA Bus Service Data Collection VIII | $450,000 | $110,000 | 82% | $0 | $0 | $0 | $0 | $0 | $112,930 | $0 | $112,930 | No notes. |
14339 | MBTA Rider Oversight Committee Support | $24,500 | $6,000 | 50% | $0 | $0 | $0 | $0 | $0 | $8,040 | $0 | $8,040 | No notes. |
To be determined | MBTA Systemwide Passenger Survey | $1,180,000 | Not applicable | To be determined | $0 | $0 | $0 | $0 | $0 | $482,550 | $0 | $482,550 | No notes. |
To be determined | MBTA University Pass Title VI Equity Analysis | $20,000 | Not applicable | To be determined | $0 | $0 | $0 | $0 | $0 | $2,670 | $0 | $2,670 | No notes. |
To be determined | MBTA Youth Pass Program Evaluation | $60,000 | Not applicable | To be determined | $0 | $0 | $0 | $0 | $0 | $1,790 | $0 | $1,790 | No notes. |
To be determined | MBTA Youth Pass Title VI Equity Analysis | $20,000 | Not applicable | To be determined | $0 | $0 | $0 | $0 | $0 | $1,940 | $0 | $1,940 | No notes. |
14346 | Regional Transit Service Planning Technical Support | Not applicable | $12,100 | Ongoing | $0 | $20,500 | $0 | $0 | $0 | $0 | $0 | $20,500 | No notes. |
11150 | Roadway Safety Audits | Not applicable | $13,100 | Ongoing | $13,800 | $0 | $0 | $0 | $0 | $0 | $0 | $13,800 | No notes. |
13269 | Safety Analysis for Intersections Near MAGIC Schools | $22,500 | $22,500 | 98% | $350 | $150 | $0 | $0 | $0 | $0 | $0 | $500 | No notes. |
90080 | Travel Data Forecasts | Not applicable | $7,800 | Ongoing | $5,530 | $2,370 | $0 | $0 | $0 | $0 | $0 | $7,900 | No notes. |
90040 | Travel Operations Analyses | Not applicable | $7,900 | Ongoing | $0 | $10,800 | $0 | $0 | $0 | $0 | $0 | $10,800 | No notes. |
null | Technical Support / Operations Analysis Projects Subtotal | null | $1,470,220 | null | $112,790 | $54,010 | $480,000 | $114,170 | $250,000 | $949,190 | $0 | $1,960,160 | No notes. |
Row Identifier | Project and Budget Categories | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|---|
A | CTPS Administration and Resource Management Projects - Salary and Overhead | $548,540 | $253,000 | $0 | $0 | $0 | $0 | $0 | $801,540 | No notes. |
B | CTPS Certification Requirements - Salary and Overhead | $1,570,730 | $673,170 | $0 | $0 | $0 | $0 | $0 | $2,243,900 | No notes. |
C | CTPS Planning Studies - Salary and Overhead | $108,710 | $46,590 | $0 | $226,260 | $0 | $18,550 | $11,790 | $411,900 | No notes. |
D | CTPS Technical Support and Operations Analysis Projects - Salary and Overhead | $112,790 | $54,010 | $480,000 | $114,170 | $250,000 | $949,190 | $0 | $1,960,160 | No notes. |
E | All CTPS Project Groups - Salary and Overhead (A+B+C+D) | $2,340,770 | $1,026,770 | $480,000 | $340,430 | $250,000 | $967,740 | $11,790 | $5,417,500 | No notes. |
F | All CTPS Project Groups - Direct Support | $50,000 | $22,500 | $15,000 | $0 | $6,000 | $77,870 | $100 | $171,470 | See the CTPS Administration and Resource Management Projects table above. |
G | Total for Ongoing and Continuing CTPS Projects (E+F) | $2,390,770 | $1,049,270 | $495,000 | $340,430 | $256,000 | $1,045,610 | $11,890 | $5,588,970 | No notes. |
Project and Budget Categories | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|
Total Funds Available for Programming | $2,708,770 | $1,301,270 | $495,000 | $340,430 | $256,000 | $1,045,610 | $11,890 | $6,158,970 | This information may be updated when FTA Section 5303 allocations for FFY 2016 become available. The total CTPS PL funds available for programming have been reduced from $2,719,650 to $2,708,770 since the April 16, 2015 UPWP Committee meeting, per updated information from MassDOT's Office of Transportation Planning. |
Total Funds for Ongoing and Continuing CTPS Projects | $2,390,770 | $1,049,270 | $495,000 | $340,430 | $256,000 | $1,045,610 | $11,890 | $5,588,970 | See line G in the Summary of Proposed FFY 2016 Budgets for Ongoing and Continuing Projects table. |
Total Available for New Discrete Projects | $318,000 | $252,000 | $0 | $0 | $0 | $0 | $0 | $570,000 | This information may be updated when FTA Section 5303 allocations for FFY 2016 become available. |
MPO Staff-recommended New Discrete Projects | $318,000 | $252,000 | $0 | $0 | $0 | $0 | $0 | $570,000 | See the MPO Staff-recommended New Discrete Projects table below. |
Remaining Funds Available for Programming | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | This information may be updated when FTA Section 5303 allocations for FFY 2016 become available. |
Universe ID | Staff-recommended New Projects | CTPS PL Funds | CTPS Section 5303 Funds | MassDOT SPR Funds | MassDOT Funds | MassDOT Section 5303 Funds | MBTA Funds | Other Funds | Proposed FFY 2016 CTPS Budget | Notes |
---|---|---|---|---|---|---|---|---|---|---|
A-1 | Addressing Safety, Mobility, and Access on Subregional Priority Roadways: FFY 2016 | $77,000 | $33,000 | $0 | $0 | $0 | $0 | $0 | $110,000 | No notes. |
A-2 | Priority Corridors for LRTP Needs Assessment: FFY 2016 | $77,000 | $33,000 | $0 | $0 | $0 | $0 | $0 | $110,000 | No notes. |
A-3 | Safety and Operations at Selected Intersections: FFY 2016 | $45,500 | $19,500 | $0 | $0 | $0 | $0 | $0 | $65,000 | No notes. |
B-2 | Pedestrian Level-of-Sevice Metric Development | $30,000 | $0 | $0 | $0 | $0 | $0 | $0 | $30,000 | No notes. |
D-1 | Systemwide Title VI/Environmental Justice Assessment of TIP Projects | $52,500 | $22,500 | $0 | $0 | $0 | $0 | $0 | $75,000 | No notes. |
E-1 | MBTA Parking Lots: Price Sensitivity Analysis | $15,000 | $15,000 | $0 | $0 | $0 | $0 | $0 | $30,000 | No notes. |
F-1 | First-Mile-and-Last-Mile Transit Connections Studies | $0 | $55,000 | $0 | $0 | $0 | $0 | $0 | $55,000 | No notes. |
F-5 | Identifying Opportunities to Alleviate Bus Delay | $0 | $65,000 | $0 | $0 | $0 | $0 | $0 | $65,000 | No notes. |
G-1 | Research Topics Generated by MPO Staff | $21,000 | $9,000 | $0 | $0 | $0 | $0 | $0 | $30,000 | No notes. |
null | Total for Staff-recommended New Projects | $318,000 | $252,000 | $0 | $0 | $0 | $0 | $0 | $570,000 | This information may be updated as the FFY 2016 UPWP budget continues to develop. |