TABLE C-1: Greenhouse Gas Regional Highway Project Tracking

MassDOT Project ID  MassDOT Project Description GHG Analysis  Type GHG CO2 Impact (kg/yr) GHG Impact Description
606223 Acton-Concord - Bruce Freeman Rail Construction (Phase II-B)  Quantified TBD
607748 Acton - Intersection and Signal Improvements on SR 2 and SR 111 (Massachusetts Avenue) at Piper Road and Taylor Road  Quantified   TBD
606381 Arlington - Belmont - Highway Lighting Repair and Maintenance on Route 2 Qualitative No assumed impact/negligible impact on emissions
604123 Ashland - Reconstruction on Route 126 (Pond Street) from Framingham Town Line to Holliston Town Line  Quantified 140,616 Quantified Decrease in Emissions from Complete Streets Project
29492 Bedford- Billerica- Middlesex Turnpike Improvements, from Crosby Drive North to Manning Road, includes Reconstruction of B-04-006 (Phase III) Quantified RTP project included in the statewide model
608347 Beverly- Intersection Improvements at 3 Locations: Cabot Street (Route 1A/97) at Dodge Street (Route 1A), County Way, Longmeadow Road and Scott Street, McKay Street at Balch Street and Veterans Memorial Bridge (Route 1A) at Rantoul, Cabot, Water, and Front Streets Quantified 582,422 Quantified Decrease in Emissions from Traffic Operational Improvement
608614 Boston - Superstructure Replacement, B-16-179, Austin Street over I-93 Ramps, MBTA Commuter Rail and Orange Line Qualitative No assumed impact/negligible impact on emissions
604173 Boston- Bridge Rehabilitation, B-16-016, North Washington Street over the Boston Inner Harbor Qualitative   Qualitative Decrease in Emissions
607888 Boston- Brookline- Multi-Use Path Construction on New Fenway Quantified 96,163 Quantified Decrease in Emissions from Bicycle and Pedestrian Infrastructure
605733 Boston- Highway Lighting System Replacement on I-93, from Southampton Street to Neponset Avenue Qualitative   No assumed impact/negligible impact on emissions
605733 Boston- Highway Lighting System Replacement on I-93, from Southampton Street to Neponset Avenue Qualitative No assumed impact/negligible impact on emissions
606453 Boston- Improvements on Boylston Street, from Intersection of Brookline Avenue and Park Drive to Ipswich Street Quantified 1,780,834 Quantified Decrease in Emissions from Complete Streets Project
607759 Boston- Intersection and Signal Improvements at the VFW Parkway and Spring Street Quantified TBD
604761 Boston- Multi-Use Trail Construction (South Bay Harbor), from Ruggles Station to Fort Point Channel Quantified 767,491 Quantified Decrease in Emissions from Bicycle and Pedestrian Infrastructure
608234 Boston- Randolph- Bridge Preservation of 3 Bridges: B-16-165, R-01-005 and R-01-007 Qualitative No assumed impact/negligible impact on emissions
605789 Boston- Reconstruction of Melnea Cass Boulevard Quantified   TBD
606226 Boston- Reconstruction of Rutherford Avenue, from City Square to Sullivan Square Quantified RTP project included in the statewide model
606134 Boston- Traffic Signal Improvements on Blue Hill Avenue and Warren Street Quantified   TBD
608009 Boxborough- Bridge Replacement, B-18-002, Route 111 over I-495 Qualitative   No assumed impact/negligible impact on emissions
608608 Braintree - Highway Lighting Improvements at I-93/Route 3 Interchange Qualitative   No assumed impact/negligible impact on emissions
605110 Brookline- Intersection and Signal Improvements at Route 9 and Village Square (Gateway East) Quantified 66,226 Quantified Decrease in Emissions from Complete Streets Project
606316 Brookline- Pedestrian Bridge Rehabilitation, B-27-016, over MBTA off Cartlon Street Qualitative   Qualitative Decrease in Emissions
608149 Burlington- Bridge Replacement, B-29-010, I-95/St 128 (NB) and I-95/St 128 (SB) over Route 3A (Cambridge Street) Qualitative No assumed impact/negligible impact on emissions
608482 Cambridge- Somerville- Resurfacing and Related Work on Route 28 Qualitative   No assumed impact/negligible impact on emissions
608484 Canton- Milton- Resurfacing and Related Work on Route 138 Qualitative No assumed impact/negligible impact on emissions
608599 Canton-Foxborough-Norwood-Walpole- Stormwater Improvements along Route 1, Route 1A, and Interstate 95 Qualitative   No assumed impact/negligible impact on emissions
608611 Canton-Milton-Randolph - Replacement and Rehabilitation of the Highway Lighting System at the Route 24/Route 1/I-93 Interchange Qualitative No assumed impact/negligible impact on emissions
608206 Chelsea to Danvers- Guide and Traffic Sign Replacement on a Section of US Route 1 Qualitative   No assumed impact/negligible impact on emissions
BN1800 Community Transportation Program Quantified TBD
608220 Concord- Resurfacing and Related Work on Route 2 Qualitative   No assumed impact/negligible impact on emissions
608478 Concord- Resurfacing and Related Work on Route 2 Qualitative No assumed impact/negligible impact on emissions
607954 Danvers- Bridge Replacement, D-03-018, St 128 over Waters River Qualitative   No assumed impact/negligible impact on emissions
607901 Dedham- Pedestrian Improvements along Elm Street and Rustcraft Road Corridors Quantified 13,608 Quantified Decrease in Emissions from Complete Streets Project
605608 Dedham- Resurfacing and Related Work on Route 109 Qualitative   No assumed impact/negligible impact on emissions
608596 Essex- Bridge Preservation, E-11-001, Route 133/Main Street over Essex River Qualitative No assumed impact/negligible impact on emissions
607998 Everett - Improvements at Madelaine English (SRTS) Qualitative   Qualitative Decrease in Emissions
607652 Everett- Reconstruction of Ferry Street, South Ferry Street and a Portion of Elm Street Quantified 415,498 Quantified Decrease in Emissions from Complete Streets Project
608210 Foxborough- Plainville- Wrentham- Franklin- Interstate Maintenance and Related Work on I-495 Qualitative   No assumed impact/negligible impact on emissions
608480 Foxborough- Walpole- Resurfacing and Related Work on Route 1 Qualitative No assumed impact/negligible impact on emissions
607732 Framingham- Natick- Cochituate Rail Trail Construction including Pedestrian Bridge, N-03-014, over Route 9 and F-07-033=N-03-029 over Route 30 Quantified 78,019 Quantified Decrease in Emissions from Bicycle and Pedestrian Infrastructure
608228 Framingham- Reconstruction of Union Avenue, from Proctor Street to Main Street Quantified -196,862 Quantified Increase in Emissions
BN1570 Green Line Extension Project- Extension to College Avenue with the Union Square Spur Quantified   RTP project included in the statewide model
606553 Hanover- Norwell- Superstructure Replacement, H-06-010, St 3 over St 123 (Webster Street) and N-24-003, St 3 over ST 123 (High Street) Qualitative Qualitative Decrease in Emissions
600518 Hingham- Intersection Improvements at Derby Street, Whiting Street (Route 53) and Gardner Street Quantified -113,400 Quantified Increase in Emissions
607309 Hingham- Reconstruction and Related Work on Derby Street, from Pond Park Road to Cushing Street Quantified 351,994 Quantified Decrease in Emissions from Complete Streets Project
606501 Holbrook- Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street Quantified 4,536 Quantified Decrease in Emissions from Complete Streets Project
607428 Hopedale- Milford- Resurfacing and Intersection Improvements on Route 16 (Main Street), from Water Street West to Approximately 120 Feet West of the Milford/Hopedale Town Line and the Intersection of Route 140 Quantified 186,883 Quantified Decrease in Emissions from Complete Streets Project
606043 Hopkinton- Signal and Intersection Improvements on Route 135 Quantified 1,194,782 Quantified Decrease in Emissions from Complete Streets Project
606632 Hopkinton- Westborough- Bridge Replacement, H-23-006=W-24-016, Fruit Street over CSX and Sudbury River Qualitative No assumed impact/negligible impact on emissions
607977 Hopkinton- Westborough- Reconstruction of I-90/I-495 Interchange Quantified   RTP project included in the statewide model
608379 Lexington- Belmont- Arlington- Cambridge- Pavement Preservation on Route 2 Qualitative No assumed impact/negligible impact on emissions
602077 Lynn- Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square Quantified 15,422 Quantified Decrease in Emissions from Complete Streets Project
604952 Lynn- Saugus- Bridge Replacement, L-18-016=S-05-008, Route 107 over the Saugus River (AKA - Belden G. Bly Bridge) Qualitative Qualitative Decrease in Emissions
607477 Lynnfield- Peabody- Resurfacing and Related Work on Route 1 Qualitative   No assumed impact/negligible impact on emissions
604810 Marlborough- Reconstruction of Route 85 (Maple Street) Quantified 589,680 Quantified Decrease in Emissions from Complete Streets Project
608467 Marlborough- Sudbury- Resurfacing and Related Work on Route 20 Qualitative   No assumed impact/negligible impact on emissions
608217 Marlborough- Sudbury- Stormwater Improvements along Route 20 Qualitative No assumed impact/negligible impact on emissions
604655 Marshfield- Bridge Replacement, M-07-007, Beach Street over the Cut River Qualitative   Qualitative Decrease in Emissions
608069 Marshfield- Pembroke- Norwell- Hanover- Rockland- Hingham- Resurfacing and Related Work on Route 3 Qualitative   No assumed impact/negligible impact on emissions
608637 Maynard - Bridge Replacement, M-10-006, Florida Road over Assabet River Qualitative   No assumed impact/negligible impact on emissions
603917 Medford- Stoneham- Woburn- Reading- Highway Lighting Rehabilitation on I-93 (Phase II) Qualitative No assumed impact/negligible impact on emissions
608522 Middleton- Bridge Replacement- M-20-003, RT 62/Maple Street over Ipswich River Qualitative   No assumed impact/negligible impact on emissions
607763 Milton- Intersection and Signal Improvements at 2 Locations: SR 138 (Blue Hill Avenue) at Atherton Street and Bradlee Road and SR 138 (Blue Hill Avenue) at Milton Street and Dollar Lane Quantified   TBD
607754 Milton- Intersection and Signal Improvements at Granite Avenue and Squantum Street Quantified   TBD
605034 Natick- Reconstruction of Route 27 (North Main Street), from North Avenue to the Wayland Town Line Quantified 177,811 Quantified Decrease in Emissions from Complete Streets Project
606635 Needham- Newton- Reconstruction of Highland Avenue, Needham Street and Charles River Bridge, N-04-002, from Webster Street (Needham) to Route 9 (Newton) Quantified 729,389 Quantified Decrease in Emissions from Complete Streets Project
603711 Needham- Wellesley- Rehab/Replacement of 6 Bridge on I-95/Route 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027, N-04-037 and W-13-023 (Add-a-Lane- Contract V) Quantified   RTP project included in the statewide model
608609 Newton - Westwood, Bridge No. N-12-0056 and W-31-006: Clean and Paint Structural Steel Qualitative   No assumed impact/negligible impact on emissions
607915 Newton- Wellesley- Weston- Bridge Maintenance of N-12-063, N-12-054, N-12-055 and N-12-056 on I-95/Route 128 Qualitative   No assumed impact/negligible impact on emissions
608610 Newton, Bridge Number N-12-055: Clean and Paint Structural Steel Qualitative   No assumed impact/negligible impact on emissions
608052 Norwood- Intersection and Signal Improvements at US 1 (Providence Highway) and Morse Street Quantified   TBD
605857 Norwood- Intersection Improvements at Route 1 and University Avenue/Everett Street Quantified 1,003,363 Quantified Decrease in Emissions from Traffic Operational Improvement
608468 Peabody- Danvers- Resurfacing and Related Work on Route 1 Qualitative   No assumed impact/negligible impact on emissions
608208 Quincy- Milton- Boston- Interstate Maintenance and Related Work on I-93 Qualitative   No assumed impact/negligible impact on emissions
608208 Quincy- Milton- Boston- Interstate Maintenance and Related Work on I-93 Qualitative   No assumed impact/negligible impact on emissions
607133 Quincy- Superstructure Replacement, Q-01-039, Robertson Street over I-93/US 1/SR 3 Qualitative   No assumed impact/negligible impact on emissions
607481 Randolph- Quincy- Braintree- Interstate Maintenance and Related Work on I-93 (SB) Qualitative   No assumed impact/negligible impact on emissions
608205 Reading to Lynnfield- Guide and Traffic Sign Replacement on a Section of I-95(SR 128) Qualitative   No assumed impact/negligible impact on emissions
608219 Reading- Wakefield- Interstate Maintenance and Related Work on I-95 Qualitative   No assumed impact/negligible impact on emissions
607999 Revere- Improvements at Garfield Elementary and Middle School (SRTS) Qualitative   Qualitative Decrease in Emissions
608521 Salem - Structural Steel Repairs, Bridge No. S-01-018 Qualitative   No assumed impact/negligible impact on emissions
608352 Salem- Canal Street Rail Trail Construction (Phase 2) Quantified 9,979 Quantified Decrease in Emissions from Bicycle and Pedestrian Infrastructure
608008 Saugus - Resurfacing and Related Work on Route 1 Qualitative   No assumed impact/negligible impact on emissions
608079 Sharon- Bridge Replacement, S-09-003 (40N), Maskwonicut Street over Amtrak/MBTA Qualitative   Qualitative Decrease in Emissions
604989 Southborough- Reconstruction of Main Street (Route 30), from Sears Road to Park Street Quantified 213,192 Quantified Decrease in Emissions from Complete Streets Project
607488 Southborough- Resurfacing and Related Work on Route 9, from the Framingham Town Line to White Bagley Road Qualitative   No assumed impact/negligible impact on emissions
608476 Southborough- Resurfacing and Related Work on Route 30 Qualitative   No assumed impact/negligible impact on emissions
608613 Stoneham - Bridge Replacement, S-27-008,  Marble Street over I-93 Qualitative   No assumed impact/negligible impact on emissions
602165 Stoneham- Signal and Intersection Improvements at Route 28/North Street Quantified 139,709 Quantified Decrease in Emissions from Traffic Operational Improvement
605342 Stow- Bridge Replacement, S-29-001, (ST 62) Gleasondale Road over the Assabet River Qualitative   No assumed impact/negligible impact on emissions
608255 Stow- Bridge Replacement, S-29-011, Box Mill Road over Elizabeth Brook Qualitative   No assumed impact/negligible impact on emissions
607761 Swampscott- Intersection and Signal Improvements at SR 1A (Paradise Road) at Swampscott Mall Quantified   TBD
607507 Wakefield- Bridge Deck Replacement, W-01-021 (2MF), Hopkins Street over I-95/St 128 Qualitative   Qualitative Decrease in Emissions
607329 Wakefield- Lynnfield- Rail Trail Extension, from the Galvin Middle School to Lynnfield/Peabody Town Line Quantified   TBD
602261 Walpole- Reconstruction on Route 1A (Main Street), from the Norwood Town Line to Route 27, includes W-03-024 over the Neponset River Quantified 215,006 Quantified Decrease in Emissions from Complete Streets Project
607533 Waltham- Bridge Replacement, W-04-006, Woerd Avenue over Charles River Qualitative   No assumed impact/negligible impact on emissions
608004 Watertown- Improvements at Hosmer Elementary School (SRTS) Qualitative   Qualitative Decrease in Emissions
601630 Weymouth- Abington- Reconstruction and Widening on Route 18 (Main Street) from Highland Place to Route 139 (4.0 Miles) includes Replacing W-32-013, Route 18 over the Old Colony Railroad (MBTA) Quantified   RTP project included in the statewide model
608003 Weymouth- Improvements at Pingree Elementary School (SRTS) Qualitative   Qualitative Decrease in Emissions
608483 Weymouth- Resurfacing and Related Work on Route 3A Qualitative   No assumed impact/negligible impact on emissions
608214 Winchester- Stormwater Improvements along Route 3 Qualitative   No assumed impact/negligible impact on emissions
608097 Woburn- Bridge Replacement and Related Work, W-43-028, Washington Street over I-95 Qualitative   No assumed impact/negligible impact on emissions
604996 Woburn- Bridge Replacement, W-43-017, New Boston Street over MBTA Quantified   RTP project included in the statewide model
604935 Woburn- Reconstruction of Montvale Avenue, from I-93 Interchange to Central Street (Approx. 1,850 FT) Quantified 98,885 Quantified Decrease in Emissions from Complete Streets Project

TABLE C-2: Greenhouse Gas Regional Transit Project Tracking

Regional Transit Authority  Project Description GHG Analysis  Type GHG CO2 Impact (kg/yr) GHG Impact Description
CATA Acquire  - Miscellaneous Support Equipment  Qualitative   No assumed impact/negligible impact on emissions
CATA Acquire - Shop Equipment/Software Maintenance  Qualitative No assumed impact/negligible impact on emissions
CATA Buy Replacement 30-Foot Buses (3)  Quantified 1,278 Quantified Decrease in Emissions from Bus Replacement
CATA Buy Replacement Trolley Buses (2)  Quantified 530 Quantified Decrease in Emissions from Bus Replacement
CATA Construct - Bus Shelter-CATA HUB/COA Qualitative   No assumed impact/negligible impact on emissions
CATA Preventative Maintenance Qualitative No assumed impact/negligible impact on emissions
CATA Rehab- Shelters Railroad, Park and Ride, Emerson Ave Qualitative   No assumed impact/negligible impact on emissions
CATA Rehab/Renovate - Bus Passenger Shelters Qualitative   No assumed impact/negligible impact on emissions
MBTA Bridge and Tunnel Program Qualitative   No assumed impact/negligible impact on emissions
MBTA Green Line Extension Project - Extension to College Avenue with the Union Square Spur  Quantified   RTP project included in the statewide model
MBTA Green Line Overhaul Qualitative   No assumed impact/negligible impact on emissions
MBTA Green Line Reliability Improvements Qualitative   No assumed impact/negligible impact on emissions
MBTA Stations and Facilities Qualitative   No assumed impact/negligible impact on emissions
MBTA Bus Overhaul Qualitative   No assumed impact/negligible impact on emissions
MBTA Elevator Program Qualitative   No assumed impact/negligible impact on emissions
MBTA Revenue Vehicle Program Qualitative No assumed impact/negligible impact on emissions
MBTA Emission Control Diesel Bus Selective System Reliability Program  Qualitative   No assumed impact/negligible impact on emissions
MBTA Bus Program Qualitative   No assumed impact/negligible impact on emissions
MBTA Positive Train Control Qualitative   No assumed impact/negligible impact on emissions
MBTA South Shore Parking Garage Qualitative   No assumed impact/negligible impact on emissions
MBTA Bus Procurement (60 Hybrid Buses) Quantified 2,398,879 Quantified Decrease in Emissions from Bus Replacement
MBTA Systems Upgrade Qualitative   No assumed impact/negligible impact on emissions
MWRTA Acquisition of Bus Support Equipment/Facilities   Qualitative   No assumed impact/negligible impact on emissions
MWRTA Construct Miscellaneous Electric/Power Equipment  Qualitative   No assumed impact/negligible impact on emissions
MWRTA Construction of Bus Stations/Terminals  Qualitative   No assumed impact/negligible impact on emissions
MWRTA Mobility Management Qualitative   No assumed impact/negligible impact on emissions
MWRTA Non-Fixed Route ADA Paratransit Services  Quantified 6,653 Quantified Decrease in Emissions from Bus Replacement
MWRTA Terminal, Intermodal (Transit)  Qualitative   No assumed impact/negligible impact on emissions

 

TABLE C-3: Greenhouse Gas Regional Highway "Completed" Project Tracking

 

MassDOT Project ID  MassDOT Project Description GHG Analysis  Type GHG CO2 Impact (kg/yr) GHG Impact Description FFY of Contract Award
606284 Boston- Improvements to Commonwealth Avenue, from Amory Street to Alcorn Street Quantified 162,389 Quantified Decrease in Emissions from Complete Streets Project 2015
605657 Medway- Reconstruction on Route 109, from Holliston Street to 100 Feet West of Highland Street Quantified 707,616 Quantified Decrease in Emissions from Complete Streets Project 2015
605146 Salem- Reconstruction on Canal Street, from Washington Street and Mill Street to Loring Avenue and Jefferson Avenue Quantified 66,226 Quantified Decrease in Emissions from Complete Streets Project 2015
604531 Acton- Assabet River Rail Trail Quantified 61,690 Quantified Decrease in Emissions from Bicycle and Pedestrian Infrastructure 2015
602000 Weston- Intersection and Signal Improvements at Route 30 (South Ave) and Wellesley Street Quantified 214,099 Quantified Decrease in Emissions from Traffic Operational Improvement 2015
607209 Somerville- Cambridge- Reconstruction of Beacon Street, from Oxford Street to Cambridge City Line Quantified 684,057 Quantified Decrease in Emissions from Complete Streets Project 2015
601579 Wayland- Signal and Intersection Improvements at Route 27 (Main Street) and Route 30 (Commonwealth Road) Quantified 205,105 Quantified Decrease in Emissions from Traffic Operational Improvement 2016

 

TABLE C-4 GREENHOUSE GAS REGIONAL TRANSIT "COMPLETED" PROJECT TRACKING

Regional Transit Authority Project Description GHG Analysis  Type GHG CO2 Impact (kg/yr) GHG Impact Description FFY of Contract Award
CATA Bus Replacement - 30-Foot Bus (2) Quantified 786 Quantified Decrease in Emissions from Bus Replacement 2015
CATA Bus Replacement - Less than 30-Foot Bus (3) Quantified 18,666 Quantified Decrease in Emissions from Bus Replacement 2015
MBTA Revenue Vehicle Program - Bus Replacement (60) Quantified 2,398,879 Quantified Decrease in Emissions from Bus Replacement 2015
MWRTA Van Replacement (2) Quantified 4,457 Quantified Decrease in Emissions from Bus Replacement 2015
MWRTA Mini-Van Replacement (8) Quantified 5,211 Quantified Decrease in Emissions from Bus Replacement 2015
MWRTA Bus Replacement - Less than 30-Foot Bus (2) Quantified 8,640 Quantified Decrease in Emissions from Bus Replacement 2015
CATA Bus Replacement - 30-Foot Bus (4) Quantified 1,660 Quantified Decrease in Emissions from Bus Replacement 2016
CATA Bus Replacement - Less than 30-Foot Bus (3) Quantified 10,151 Quantified Decrease in Emissions from Bus Replacement 2016
MBTA Revenue Vehicle Program - Bus Replacement (369) Quantified 1,264,520 Quantified Decrease in Emissions from Bus Replacement 2016
MWRTA Bus Replacement - Less than 30-Foot Bus (5) Quantified 20,107 Quantified Decrease in Emissions from Bus Replacement 2016