This is a complex table that has not been optimized for screen–reading software. If you would like to request this table in a alternative format, please contact the Central Transportation Planning Staff (CTPS) via email at publicinfo@ctps.org | Overall Changes in Funding in TIP | |||||
Project | Proposed Change | Explanation | Section/Funding Source | From | To | Difference |
FFY 2023 Regional Target Highway | ||||||
607899: Dedham – Pedestrian Improvements along Bussey Street, Superstructure Replacement of D–05–10 over Mother Brook | Cost Increase | The budget for this project is increasing by $1,981,087 based on the submission of 100% designs and updated costs. This increase is entirely funded by Bridge Formula Program funding and will not impact the MPO's Regional Target allocation. This project is planned to advertise for construction on February 11, 2023. | STBG, TAP, Bridge Formula | $6,314,855 | $8,295,942 | $1,981,087 |
FFY 2023 Statewide Highway | ||||||
603722: Lexington – Bridge Replacement L–10–010 Route 2A (Marrett Road) over I–95/Route 128 | Cost Increase | The budget for this project is increasing by $6,822,579 based on the submission of 100% designs and updated costs. This project is planned to advertise for construction on January 21, 2023. | Bridge Formula | $20,456,841 | $27,278,841 | $6,822,579 |
608818: Danvers–Middleton– Resurfacing and Related Work on Route 114 | Cost Increase | The budget for this project is increasing by $1,661,763 based on the submission of 100% designs and updated costs. This project is planned to advertise for construction on February 18, 2023. | NHPP | $4,175,264 | $5,837,027 | $1,661,763 |
610726: Medford–Reading–Somerville– Stoneham–Winchester–Woburn – Interstate Pavement Preservation on I–93 | Cost Increase | The budget for this project is increasing by $26,483,619 based on the bundling of bridge preservation work along the corridor and final costs for the 100% design of pavement work. This project is planned to advertise for construction on February 25, 2023. | NHPP, Bridge Formula | $21,907,511 | $48,391,130 | $26,483,619 |
FFY 2023 Member-Designated Projects | ||||||
S12749: Stow – Assabet River Rail Trail Extension Engineering and Design | New Project | This is a new line item to fund the design and engineering of the Stow section of the Assabet River Rail Trail. The construction for this line item will be programmed under Project # 613096 outside of the current STIP. |
Earmark | N/A | $937,500 | $937,500 |
FFY 2023 Transit Program | ||||||
RTD0011099: MWRTA – Operating Assistance Non Fixed Route ADA Para Serv | Shift Funds | The budget for this line item is being increased due to the apportionment of additional Section 5307 Transit operating funding from the Federal Transit Administration to the MetroWest RTA in the FY 2023 Boston UZA split letter. | FTA Section 5307, State Contract Assistance | $2,000,000 | $2,646,494 | $646,494 |
T00072: CATA – Replacement of Two Replica Trolleys | New Project | This is a new line item in the TIP that provides funding for the replacement of two trolleys in the Cape Ann Transportation Authority fleet that have reached the end of their useful lives. | FTA Section 5307, RTA Capital Funds | N/A | $1,280,000 | $1,280,000 |
ADA = Americans with Disabilities Act. Boston UZA = Boston Urbanized Area. FFY = Federal Fiscal Year. FTA = Federal Transit Administration. CATA = Cape Ann Transit Authority. MWRTA = MetroWest Regional Transportation Authority. NHPP = National Highway Performance Program. RTA = Regional Transportation Authority. STBG = Surface Transportation Block Grant. STIP = State Transportation Improvement Program. TAP = Transportation Alternatives Program. TIP = Transportation Improvement Program. UZA = Urbanized Area.