| TIP ID | 
    Proponent(s) | 
    Project Name | 
    Investment Category | 
    MAPC       Subregion | 
    Programmed Year(s) | 
    Design Status | 
    FFY 2024 | 
    FFY 2025 | 
    FFY 2025 (New) | 
    FFY 2026 | 
    FFY 2026 (New) | 
    FFY 2027 | 
    FFY 2027 (New) | 
    FFY 2028 | 
    FFY 2028 (New) | 
    FFY 2029 (New) | 
    Other Non-Target Funds | 
    Adjusted   TFPC  (FFYs 2024-28) | 
    Adjusted TFPC       (FFYs 2025-29) | 
    Cost Increase   (%) | 
  
  
    | S12818 | 
    Acton | 
    ACTON PARKING MANAGEMENT SYSTEM | 
    CC | 
    MAGIC | 
    2024 | 
    Approved | 
    $15,000 | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
      | 
    $0 | 
    $15,000  | 
    $15,000  | 
    $15,000  | 
  
  
    | 608436 | 
    Ashland | 
    ASHLAND- REHABILITATION AND RAIL   CROSSING IMPROVEMENTS ON CHERRY STREET | 
    CS | 
    MWRC | 
    2028 | 
    25% Comments | 
    $0 | 
    $742,315 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $831,393 | 
    $0 | 
    $480,000 | 
    $1,222,315  | 
    $1,316,340  | 
    8% | 
  
  
    | 609204 | 
    Belmont | 
    BELMONT- COMMUNITY PATH, BELMONT   COMPONENT OF THE MCRT (PHASE I) | 
    BP | 
    ICC | 
    2027 | 
    25% Received | 
    $0 | 
    $0 | 
    $0 | 
    $21,288,202 | 
    $0 | 
    $0 | 
    $21,288,201 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $21,288,202  | 
    $21,288,202  | 
    0% | 
  
  
    | 606453 | 
    Boston | 
    BOSTON- IMPROVEMENTS ON BOYLSTON   STREET, FROM INTERSECTION OF BROOKLINE AVENUE & PARK DRIVE TO IPSWICH   STREET | 
    CS | 
    ICC | 
    2026 | 
    25% Received R1 | 
    $0 | 
    $8,665,052 | 
    $0 | 
    $0 | 
    $9,011,654 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $8,665,052  | 
    $9,011,654  | 
    4% | 
  
  
    | 606226 | 
    Boston | 
    BOSTON- RECONSTRUCTION OF   RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE | 
    MI | 
    ICC | 
    2027-29 | 
    25% Received R1 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $8,600,000 | 
    $8,600,000 | 
    $33,500,000 | 
    $33,500,000 | 
    $45,000,000 | 
    $0 | 
    $197,759,449  | 
    $197,759,449  | 
    0% | 
  
  
    | S12823 | 
    Boston | 
    BOSTON ELECTRIC BLUEBIKES   ADOPTION | 
    CC | 
    ICC | 
    2024 | 
    N/A | 
    $1,020,000 | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
      | 
    $0 | 
    $1,020,000  | 
    $1,020,000  | 
    0% | 
  
  
    | 612989 | 
    Boston | 
    BOSTON- BRIDGE PRESERVATION,   B-16-066 (38D), CAMBRIDGE STREET OVER MBTA | 
    CS | 
    ICC | 
    2027 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $16,632,000 | 
    $0 | 
    $0 | 
    $17,297,280 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $16,632,000  | 
    $17,297,280  | 
    4% | 
  
  
    | 610932 | 
    Brookline | 
    BROOKLINE- REHABILITATION OF   WASHINGTON STREET | 
    CS | 
    ICC | 
    2028 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $28,995,267 | 
    $0 | 
    $0 | 
    $30,155,078 | 
    $0 | 
    $0 | 
    $28,995,267  | 
    $30,155,078  | 
    4% | 
  
  
    | S12824 | 
    Cambridge | 
    CAMBRIDGE ELECTRIC BLUEBIKES   ADOPTION | 
    CC | 
    ICC | 
    2024 | 
    N/A | 
    $315,000 | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
      | 
      | 
      | 
    $0 | 
    $315,000  | 
    $315,000  | 
    0% | 
  
  
    | S12114 | 
    Canton | 
    ROYALL STREET SHUTTLE | 
    CC | 
    State Highway Project | 
    2023-24 | 
    N/A | 
    $148,542 | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
      | 
      | 
      | 
    $0 | 
    $148,542  | 
    $148,542  | 
    0% | 
  
  
    | S12806 | 
    Canton | 
    CANTON CENTER BICYCLE RACKS | 
    CC | 
    TRIC | 
    2024 | 
    N/A | 
    $12,500 | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
      | 
      | 
      | 
    $0 | 
    $12,500  | 
    $12,500  | 
    0% | 
  
  
    | S12805 | 
    Canton | 
    CANTON PUBLIC SCHOOLS BIKE   PROGRAM | 
    CC | 
    TRIC | 
    2024 | 
    N/A | 
    $28,125 | 
    $0 | 
      | 
    $0 | 
      | 
    $0 | 
      | 
      | 
      | 
      | 
    $0 | 
    $28,125  | 
    $28,125  | 
    0% | 
  
  
    | S12700 | 
    CATA | 
    CATA ON DEMAND MICROTRANSIT   SERVICE EXPANSION | 
    CC | 
    NSTF | 
    2023-25 | 
    N/A | 
    $0 | 
    $214,776 | 
    $214,776 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $214,776  | 
    $214,776  | 
    0% | 
  
  
    | 611983 | 
    Chelsea | 
    CHELSEA- PARK STREET &   PEARL STREET RECONSTRUCTION | 
    CS | 
    ICC | 
    2027 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $11,705,708 | 
    $11,705,708 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $11,705,708  | 
    $11,705,708  | 
    0% | 
  
  
    | 609257 | 
    Everett | 
    EVERETT- RECONSTRUCTION OF   BEACHAM STREET | 
    CS | 
    ICC | 
    2027 | 
    Approved | 
    $0 | 
    $10,548,928 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $11,392,842 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $10,548,928  | 
    $11,392,842  | 
    8% | 
  
  
    | 605168 | 
    Hingham | 
    HINGHAM- IMPROVEMENTS ON ROUTE   3A FROM OTIS STREET/COLE ROAD    INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE   WASHINGTON BOULEVARD  | 
    CS | 
    SSC | 
    2026 | 
    25% DPH | 
    $0 | 
    $15,018,900 | 
    $0 | 
    $0 | 
    $33,754,352 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $15,018,900  | 
    $33,754,352  | 
    125% | 
  
  
    | 605743 | 
    Ipswich | 
    IPSWICH- RESURFACING &   RELATED WORK ON CENTRAL & SOUTH MAIN STREETS | 
    CS | 
    NSTF | 
    2027-28 | 
    25% Received R1 | 
    $0 | 
    $0 | 
    $0 | 
    $5,702,076 | 
    $0 | 
    $6,026,622 | 
    $6,000,000 | 
    $0 | 
    $6,197,846 | 
    $0 | 
    $0 | 
    $11,728,698  | 
    $12,197,846  | 
    4% | 
  
  
    | 609054 | 
    Littleton | 
    LITTLETON- RECONSTRUCTION OF   FOSTER STREET | 
    CS | 
    MAGIC | 
    2024 | 
    PS&E Received - R1 | 
    $6,476,821 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
      | 
    $0 | 
    $0 | 
    $6,351,061  | 
    $6,476,821  | 
    2% | 
  
  
    | 609252 | 
    Lynn | 
    LYNN- REHABILITATION OF ESSEX   STREET | 
    CS | 
    ICC | 
    2027 | 
    Approved | 
    $0 | 
    $19,698,640 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $21,274,531 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $19,698,640  | 
    $21,274,531  | 
    8% | 
  
  
    | 609246 | 
    Lynn | 
    LYNN- REHABILITATION OF WESTERN   AVENUE (ROUTE 107) | 
    CS | 
    ICC | 
    2028-29 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $15,000,000 | 
    $0 | 
    $20,000,000 | 
    $15,000,000 | 
    $20,000,000 | 
    $0 | 
    $40,980,000  | 
    $45,897,600  | 
    12% | 
  
  
    | 613088 | 
    Malden | 
    MALDEN- SPOT POND BROOK GREENWAY | 
    BP | 
    ICC | 
    2027 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $4,858,127 | 
    $4,684,622 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $4,858,127  | 
    $4,684,622  | 
    -4% | 
  
  
    | S12703 | 
    MART | 
    MONTACHUSETT   RTA MICROTRANSIT SERVICE | 
    CC | 
    MAGIC | 
    2023-25 | 
    N/A | 
    $430,354 | 
    $406,641 | 
    $406,641 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $836,995  | 
    $836,995  | 
    0% | 
  
  
    | 608007 | 
    MassDOT | 
    COHASSET- SCITUATE- CORRIDOR   IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM   BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD | 
    CS | 
    SSC | 
    2024 | 
    100% Complete | 
    $15,118,044 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $15,496,957  | 
    $15,118,044  | 
    -2% | 
  
  
    | 603739 | 
    MassDOT | 
    WRENTHAM- CONSTRUCTION OF ROUTE   I-495/ROUTE 1A RAMPS | 
    MI | 
    SWAP | 
    2024 | 
    100% Received      R1 | 
    $18,998,683 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $17,994,890  | 
    $18,998,683  | 
    6% | 
  
  
    | 110980 | 
    MassDOT | 
    NEWTON- WESTON- BRIDGE   REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE   CHARLES RIVER | 
    CS | 
    ICC | 
    2024 | 
    75% Received | 
    $24,182,579 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $21,851,750  | 
    $24,182,579  | 
    11% | 
  
  
    | 608067 | 
    MassDOT | 
    WOBURN- INTERSECTION   RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH   BEDFORD STREET | 
    II | 
    NSPC | 
    2025 | 
    25% Approved | 
    $0 | 
    $1,978,080 | 
    $3,438,311 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $1,978,080  | 
    $3,438,311  | 
    74% | 
  
  
    | 608045 | 
    MassDOT | 
    MILFORD- REHABILITATION ON   ROUTE 16, FROM ROUTE 109 TO BEAVER STREET | 
    CS | 
    SWAP | 
    2026 | 
    25% Received      R2 | 
    $0 | 
    $0 | 
    $0 | 
    $9,758,201 | 
    $13,548,565 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $9,758,201  | 
    $13,548,565  | 
    39% | 
  
  
    | 607981 | 
    MassDOT | 
    SOMERVILLE-   MCGRATH BOULEVARD CONSTRUCTION | 
    MI | 
    ICC | 
    2027-29 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $35,000,000 | 
    $35,000,000 | 
    $30,000,000 | 
    $30,000,000 | 
    $33,840,000 | 
    $0 | 
    $88,250,000  | 
    $88,250,000  | 
    0% | 
  
  
    | 608051 | 
    MassDOT | 
    WILMINGTON- RECONSTRUCTION ON   ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN C.L. | 
    CS | 
    NSPC | 
    2025 | 
    75% Comments | 
    $0 | 
    $23,731,429 | 
    $22,818,682 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $23,731,429  | 
    $22,818,682  | 
    -4% | 
  
  
    | 613121 | 
    MassDOT | 
    EVERETT- TARGETED MULTI-MODAL   AND SAFETY IMPROVEMENTS ON ROUTE 16 | 
    II | 
    ICC | 
    2027 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $5,246,920 | 
    $5,059,530 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $5,246,920  | 
    $5,059,530  | 
    -4% | 
  
  
    | 609532 | 
    MassDOT | 
    CHELSEA- TARGETED SAFETY   IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL   AVENUE | 
    II | 
    ICC | 
    2026 | 
    75% Received | 
    $0 | 
    $6,315,013 | 
    $0 | 
    $0 | 
    $9,807,515 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $6,315,013  | 
    $9,807,515  | 
    55% | 
  
  
    | S12705 | 
    MBTA | 
    LYNN STATION IMPROVEMENTS PHASE   II | 
    TT | 
    ICC | 
    2023-24 | 
    N/A | 
    $13,600,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $13,600,000  | 
    $13,600,000  | 
    0% | 
  
  
    | S12819 | 
    MBTA | 
    JACKSON SQUARE STATION   ACCESSIBILITY IMPROVEMENTS | 
    TT | 
    ICC | 
    2024-25 | 
    N/A | 
    $12,250,000 | 
    $14,000,000 | 
    $14,000,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $26,250,000  | 
    $26,250,000  | 
    0% | 
  
  
    | S12821 | 
    MBTA | 
    RAIL TRANSFORMATION - EARLY   ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING | 
    TT | 
    NSPC | 
    2024 | 
    N/A | 
    $14,000,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $14,000,000  | 
    $14,000,000  | 
    0% | 
  
  
    | S12822 | 
    MBTA | 
    COLUMBUS AVE BUS LANE PHASE II | 
    TT | 
    ICC | 
    2024 | 
    N/A | 
    $11,750,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $11,750,000  | 
    $11,750,000  | 
    0% | 
  
  
    | S12701 | 
    MWRTA | 
    MWRTA CATCHCONNECT MICROTRANSIT   SERVICE EXPANSION | 
    CC | 
    MWRC | 
    2023-25 | 
    N/A | 
    $149,425 | 
    $159,488 | 
    $159,488 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $308,913  | 
    $308,913  | 
    0% | 
  
  
    | S12807 | 
    MWRTA | 
    CATCHCONNECT MICTROTRANSIT   EXPANSION PHASE 2 | 
    CC | 
    MWRC | 
    2024-27 | 
    N/A | 
    $175,000 | 
    $165,625 | 
    $165,625 | 
    $162,500 | 
    $162,500 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $380,477  | 
    $380,477  | 
    0% | 
  
  
    | 610691 | 
    Natick | 
    COCHITUATE RAIL TRAIL EXTENSION   (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION | 
    BP | 
    MWRC | 
    2028 | 
    25% Received | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
      | 
    $7,760,451 | 
    $7,492,849 | 
    $0 | 
    $0 | 
    $7,760,451  | 
    $7,492,849  | 
    -3% | 
  
  
    | S12694 | 
    Newton | 
    NEWMO MICROTRANSIT SERVICE   EXPANSION | 
    CC | 
    ICC | 
    2023-25 | 
    N/A | 
    $268,246 | 
    $209,663 | 
    $209,663 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $477,909  | 
    $477,909  | 
    0% | 
  
  
    | 605857 | 
    Norwood | 
    NORWOOD-   INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT   STREET  | 
    II | 
    TRIC | 
    2026-27 | 
    25% Received R1 | 
    $0 | 
    $0 | 
    $0 | 
    $11,125,872 | 
    $11,125,872 | 
    $17,573,400 | 
    $17,573,400 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $28,699,272  | 
    $28,699,272  | 
    0% | 
  
  
    | 609211 | 
    Peabody | 
    PEABODY- INDEPENDENCE GREENWAY   EXTENSION | 
    BP | 
    NSTF | 
    2024 | 
    75% Comments | 
    $7,231,633 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $7,524,204  | 
    $7,231,633  | 
    -4% | 
  
  
    | 610544 | 
    Peabody | 
    PEABODY- MULTI-USE PATH   CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 | 
    BP | 
    NSTF | 
    2025 | 
    25% Received      R1 | 
    $0 | 
    $15,777,132 | 
    $13,966,099 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $15,777,132  | 
    $13,966,099  | 
    -11% | 
  
  
    | 609437 | 
    Salem | 
    SALEM- PEABODY- BOSTON STREET   IMPROVEMENTS | 
    CS | 
    NSTF | 
    2027 | 
    75% Received | 
    $0 | 
    $0 | 
    $0 | 
    $14,172,868 | 
    $0 | 
    $0 | 
    $26,122,722 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $14,172,868  | 
    $26,122,722  | 
    84% | 
  
  
    | S12699 | 
    Stoneham | 
    STONEHAM SHUTTLE SERVICE | 
    CC | 
    NSPC | 
    2023-25 | 
    N/A | 
    $261,439 | 
    $205,189 | 
    $205,189 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $466,628  | 
    $466,628  | 
    0% | 
  
  
    | 610666 | 
    Swampscott | 
    SWAMPSCOTT- RAIL TRAIL   CONSTRUCTION | 
    BP | 
    NSTF | 
    2028 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $8,932,000 | 
    $8,624,000 | 
    $0 | 
    $0 | 
    $8,932,000  | 
    $8,624,000  | 
    -3% | 
  
  
    | 613145 | 
    Wakefield | 
    WAKEFIELD- COMPREHENSIVE   DOWNTOWN TRANSPORTATION IMPROVEMENT PROJECT | 
    CS | 
    NSPC | 
    2028 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $16,581,200 | 
    $18,435,976 | 
    $0 | 
    $0 | 
    $16,581,200  | 
    $18,435,976  | 
    11% | 
  
  
    | S12697 | 
    Watertown | 
    PLEASANT STREET SHUTTLE SERVICE   EXPANSION | 
    CC | 
    ICC | 
    2023-25 | 
    N/A | 
    $335,434 | 
    $228,939 | 
    $228,939 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $564,373  | 
    $564,373  | 
    0% | 
  
  
    | 607777 | 
    Watertown | 
    WATERTOWN- REHABILITATION OF   MOUNT AUBURN STREET (ROUTE 16) | 
    CS | 
    ICC | 
    2023-24 | 
    Advertised | 
    $3,494,249 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $3,494,249  | 
    $3,494,249  | 
    0% | 
  
  
    | 608940 | 
    Weston | 
    WESTON- INTERSECTION   IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  | 
    II | 
    MWRC | 
    2026 | 
    75% Received | 
    $0 | 
    $0 | 
    $0 | 
    $2,185,303 | 
    $3,362,335 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $2,185,303  | 
    $3,237,804  | 
    48% | 
  
  
    | 608954 | 
    Weston | 
    WESTON- RECONSTRUCTION ON ROUTE   30 | 
    CS | 
    MWRC | 
    2027 | 
    25% DPH | 
    $0 | 
    $0 | 
    $0 | 
    $16,420,119 | 
    $0 | 
    $0 | 
    $20,740,442 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $16,420,119  | 
    $19,999,712  | 
    22% | 
  
  
    | 608158 | 
    Westwood | 
    WESTWOOD- NORWOOD-   RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE | 
    CS | 
    TRIC | 
    2028 | 
    25% Received | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $22,094,875 | 
    $22,854,846 | 
    $0 | 
    $0 | 
    $22,094,875  | 
    $22,854,846  | 
    3% | 
  
  
    | 610662 | 
    Woburn | 
    WOBURN- ROADWAY AND   INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN   STREET, PLEASANT STREET AND MONTVALE AVENUE | 
    CS | 
    NSPC | 
    2027 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $17,382,600 | 
    $0 | 
    $0 | 
    $18,077,904 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $17,382,600  | 
    $17,382,600  | 
    0% | 
  
  
    | 612963 | 
    Bellingham | 
    BELLINGHAM- ROADWAY   REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 NORTH OF THE I-495 NB   OFF RAMP TO MEDWAY TL, INCLUDING B-06-017 | 
    CS | 
    SWAP | 
    2028 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $16,680,000 | 
    $0 | 
    $0  | 
    $16,680,000  | 
    N/A | 
  
  
    | 612738 | 
    Ipswich | 
    IPSWICH- ARGILLA ROAD ROADWAY   RECONSTRUCTION | 
    CS | 
    NSTF | 
    2029 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $10,000,000 | 
    $0 | 
    $0  | 
    $5,368,966  | 
    N/A | 
  
  
    | 613319 | 
    Sudbury | 
    SUDBURY-FRAMINGHAM- BIKE PATH   CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD   CROSSING TO EATON ROAD WEST | 
    BP | 
    MAGIC | 
    2029 | 
    Approved | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $8,820,000 | 
    $0 | 
    $0  | 
    $8,820,000  | 
    N/A | 
  
  
    | 610823 | 
    Quincy | 
    QUINCY- INTERSECTION   IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE | 
    II | 
    ICC | 
    2026 | 
    75% Received | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $1,885,352 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $1,957,866  | 
    N/A | 
  
  
    | S12113 | 
    CTPS | 
    TRANSIT TRANSFORMATION PROGRAM | 
    TT | 
    REGIONWIDE | 
    2026-29 | 
    Administrative | 
    $0 | 
    $2,000,000 | 
    $0 | 
    $6,500,000 | 
    $6,500,000 | 
    $6,500,000 | 
    $6,500,000 | 
    $6,500,000 | 
    $6,500,000 | 
    $6,500,000 | 
    $0 | 
    $21,500,000  | 
    $28,500,000  | 
    N/A | 
  
  
    | TBD | 
    MWRTA | 
    MWRTA- PROCUREMENT OF THREE 29   FOOT BUSES | 
    TT | 
    MWRC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $1,980,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $1,980,000  | 
    N/A | 
  
  
    | S12124 | 
    CTPS | 
    COMMUNITY CONNECTIONS PROGRAM | 
    CC | 
    REGIONWIDE | 
    2026-29 | 
    Administrative | 
    $0 | 
    $909,679 | 
    $0 | 
    $2,337,500 | 
    $2,337,500 | 
    $2,500,000 | 
    $2,500,000 | 
    $2,500,000 | 
    $2,500,000 | 
    $2,500,000 | 
    $0 | 
    $8,334,827  | 
    $10,337,500  | 
    N/A | 
  
  
    | TBD | 
    Arlington | 
    ARLINGTON- INSTALLATION OF 123   BICYCLE RACKS AND RELATED MATERIALS | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $90,878 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $90,878  | 
    N/A | 
  
  
    | TBD | 
    Boston | 
    BOSTON- REPURPOSING SINGLE   SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $379,470 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $379,470  | 
    N/A | 
  
  
    | TBD | 
    Chelsea,   Revere | 
    CHELSEA-REVERE- REGIONAL ON   DEMAND MICROTRANSIT PILOT PROJECT | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $499,649 | 
    $0 | 
    $450,278 | 
    $0 | 
    $463,807 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $1,413,375  | 
    N/A | 
  
  
    | TBD | 
    Malden | 
    MALDEN- CANAL STREET BICYCLE   LANES | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $81,250 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $81,250  | 
    N/A | 
  
  
    | TBD | 
    Revere | 
    REVERE- BLUEBIKES EXPANSION TO   NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD   PARK  | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $169,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $169,000  | 
    N/A | 
  
  
    | TBD | 
    Scituate | 
    SCITUATE- INSTALLATION OF 30   BICYCLE RACKS | 
    CC | 
    SSC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $22,800 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $22,800  | 
    N/A | 
  
  
    | S12820 | 
    CTPS | 
    BIKESHARE STATE OF GOOD REPAIR   SET-ASIDE | 
    CC | 
    REGIONWIDE | 
    2025-29 | 
    Administrative | 
    $0 | 
    $1,000,000 | 
    $0 | 
    $1,000,000 | 
    $1,000,000 | 
    $2,000,000 | 
    $2,000,000 | 
    $2,000,000 | 
    $2,000,000 | 
    $2,000,000 | 
    $0 | 
    $6,000,000  | 
    $7,500,000  | 
    N/A | 
  
  
    | TBD | 
    Boston | 
    BOSTON- BLUEBIKES STATION   REPLACEMENT AND ELECTRIFICATION, 12 STATIONS | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $590,348 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $590,348  | 
    N/A | 
  
  
    | TBD | 
    Brookline | 
    BROOKLINE- BLUEBIKES STATE OF   GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $200,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $200,000  | 
    N/A | 
  
  
    | TBD | 
    Cambridge | 
    CAMBRIDGE- BLUEBIKES STATE OF   GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $385,456 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $385,456  | 
    N/A | 
  
  
    | TBD | 
    Somerville | 
    SOMERVILLE- BLUEBIKES STATE OF   GOOD REPAIR, 13 STATIONS | 
    CC | 
    ICC | 
    2025 | 
    N/A | 
    $0 | 
    $0 | 
    $278,127 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $278,127  | 
    N/A | 
  
  
    | S12825 | 
    CTPS | 
    PROJECT DESIGN SUPPORT PILOT | 
    N/A | 
    REGIONWIDE | 
    2025 | 
    Administrative | 
    $0 | 
    $4,000,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $4,000,000  | 
    $0  | 
    N/A | 
  
  
    | TBD | 
    Acton | 
    ACTON– GREAT ROAD- HARRIS TO   DAVIS INTERSECTIONS AND COMPLETE STREETS PROJECT [DESIGN ONLY] | 
    CS | 
    MAGIC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $860,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $860,000  | 
    N/A | 
  
  
    | TBD | 
    Arlington | 
    ARLINGTON- BROADWAY COMPLETE   STREETS 25% DESIGN | 
    CS | 
    ICC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $575,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $575,000  | 
    N/A | 
  
  
    | TBD | 
    Boston | 
    BOSTON- RECONSTRUCTION OF   BENNINGTON STREET, PORTER STREET TO WOOD ISLAND BUSWAY | 
    CS | 
    ICC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $1,500,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $21,500,000  | 
    N/A | 
  
  
    | TBD | 
    Malden | 
    MALDEN- ROUTE 60 IMPROVEMENTS   [DESIGN ONLY] | 
    CS | 
    ICC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $2,600,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $2,600,000  | 
    N/A | 
  
  
    | TBD | 
    Malden | 
    MALDEN- COMMERCIAL STREET   RECONSTRUCTION [DESIGN ONLY] | 
    CS | 
    ICC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $935,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $935,000  | 
    N/A | 
  
  
    | 612285 | 
    Marlborough | 
    MARLBOROUGH- RECONSTRUCTION OF   GRANGER BOULEVARD [DESIGN ONLY] | 
    CS | 
    MWRC | 
    2025 | 
    Approved | 
    $0 | 
    $0 | 
    $1,215,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $1,215,000  | 
    N/A | 
  
  
    | TBD | 
    Salem | 
    SALEM- BROAD STREET AND DALTON   PARKWAY CORRIDOR PROJECT [DESIGN ONLY] | 
    CS | 
    NSTF | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $250,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $250,000  | 
    N/A | 
  
  
    | 612962 | 
    Southborough | 
    SOUTHBOROUGH- RECLAMATION OF   MARLBOROUGH ROAD (ROUTE 85) AND FRAMINGHAM ROAD FROM MARLBOROUGH C.L to ROUTE   30 [DESIGN ONLY] | 
    CS | 
    MWRC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $1,315,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $1,315,000  | 
    N/A | 
  
  
    | 613641 | 
    Burlington | 
    BURLINGTON- INTERSECTION   IMPROVEMENTS AT ROUTE 3A/CAMBRIDGE STREET AND WINN STREET [DESIGN ONLY] | 
    II | 
    NSPC | 
    2025 | 
    Approved | 
    $0 | 
    $0 | 
    $1,700,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $1,700,000  | 
    N/A | 
  
  
    | TBD | 
    Holliston | 
    HOLLISTON- INTERSECTION   IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] | 
    II | 
    MWRC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $250,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $250,000  | 
    N/A | 
  
  
    | TBD | 
    Sherborn | 
    SHERBORN- RECONSTRUCTION OF   ROUTE 27 AND ROUTE 16 [DESIGN ONLY] | 
    II | 
    SWAP | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $900,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $900,000  | 
    N/A | 
  
  
    | 613568 | 
    Cambridge | 
    CAMBRIDGE-NEW BRIDGE AND   SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR   [DESIGN ONLY] | 
    BP | 
    ICC | 
    2025 | 
    Approved | 
    $0 | 
    $0 | 
    $3,000,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $3,000,000  | 
    N/A | 
  
  
    | TBD | 
    Framingham | 
    FRAMINGHAM- CHRIS WALSH TRAIL   PHASE 2 [DESIGN ONLY] | 
    BP | 
    MWRC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $850,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $850,000  | 
    N/A | 
  
  
    | TBD | 
    Hudson | 
    HUDSON- MASSACHUSETTS CENTRAL   RAIL TRAIL CONSTRUCTION [DESIGN ONLY] | 
    BP | 
    MAGIC | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $909,700 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $909,700  | 
    N/A | 
  
  
    | 613644 | 
    Norfolk,   Wrentham, Walpole | 
    NORFOLK-WRENTHAM-WALPOLE-   SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] | 
    BP | 
    SWAP | 
    2025 | 
    Initiated | 
    $0 | 
    $0 | 
    $1,550,000 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0 | 
    $0  | 
    $1,550,000  | 
    N/A |