FFYs 2026-2030 Transportation Improvement Program Initial Scenarios (1A, 1B, 1C, 1D)

 

Scenario 1A

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Years Since Last PINFO Milestone FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,316,061 $1,316,061
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $450,163 $450,163
S12699 Stoneham STONEHAM- SHUTTLE SERVICE 72 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $796,817 $796,817
S12697 Watertown WATERTOWN- PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,002,198 $1,002,198
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
S12979 Arlington ARLINGTON- BROADWAY COMPLETE STREETS DESIGN 80.1 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,395,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,395,000 $1,395,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,878 $90,878
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A 2025
(FFYs 2025–29)
2025 2025 PS&E Received - Resubmission 3 (1/27/2025) 0.07 $2,312,688 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,312,688 $2,312,688
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $590,348 $590,348
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 2025
(FFYs 2025–29)
2025 2025 N/A N/A $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $379,470 $379,470
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 2025
(FFYs 2025–29)
2025 2025 N/A N/A $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $385,456 $385,456
S12968 CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $65,000 $65,000
S12982 Framingham FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $850,000 $850,000
S12984 Holliston HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] 42.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 2025
(FFYs 2025–29)
2025 2025 N/A N/A $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,250 $81,250
S12980 Marlborough MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,215,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,215,000 $1,215,000
S12974 MBTA MBTA- CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS (CAMBRIDGE) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12822 MBTA MBTA- COLUMBUS AVENUE BUS LANES PHASE II (BOSTON) N/A 2021
(FFYs 2021–25)
2021, 2024-25 2021, 2024-25 N/A N/A $2,750,509 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,750,509 $2,750,509
S12819 MBTA MBTA- JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $17,725,796 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000 $33,500,000
S12976 MBTA MBTA- NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12821 MBTA MBTA- RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000 $20,000,000
S12975 MBTA MBTA- SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $2,500,000
S12981 Norfolk, Wrentham, Walpole NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] 65 N/A 2025 2025 N/A N/A $1,550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,550,000 $1,550,000
609211 Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION 34 2024
(FFYs 2020–24)
2025 2025 PS&E Received - Resubmission 2 (5/31/2024) 0.73 $8,273,695 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,273,695 $8,273,695
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK 63.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $169,000 $169,000
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,800 $22,800
S12983 Sherborn SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] 81.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000 $900,000
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $278,127 $278,127
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN CITY LINE 59 2023
(FFYs 2020–24)
2025 2025 100% Received (1/19/2024) 1.09 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645 $37,452,645
S12969 CATA CATA- GLOUCESTER FACILITY MODERNIZATION TBD 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,605,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000 $1,605,500
S13202 CATA CATA- AUTOMATIC PASSENGER COUNTING AND AUTOMATIC VEHICLE LOCATION DEPLOYMENT (TRANSIT PROJECT ID CATA011695) 36.2 N/A N/A 2025 N/A N/A $680,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $680,000
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025 N/A N/A $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000
S13206 MBTA MBTA- CATAMARAN OVERHAUL 25 2024
(FFYs 2024–28)
Transit Program
N/A 2025 N/A N/A $2,634,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,634,000
S13207 MBTA MBTA- NATICK CENTER STATION ACCESSIBILITY IMPROVEMENTS 62 N/A N/A 2025 Construction N/A $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
S13208 MBTA MBTA- WELLESLEY SQUARE STATION UPGRADES 50 N/A N/A 2025 N/A N/A $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000
S12972 MWRTA MWRTA- PROCUREMENT OF NINE 29 FOOT BUSES (CNG) 52.2 2025
(FFYs 2025–29)
2025 2025 N/A N/A $6,180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $396,000 $0 $2,376,000 $6,576,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $3,510,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $7,750,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A $499,649 $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 0.31 $0 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 0.44 $0 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 1.08 $0 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 25% Received (1/5/2022) 3.13 $0 $8,000,000 $19,711,298 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $19,711,298 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 4.06 $0 $8,665,052 $8,331,781 $0 $0 $0 $0 $0 $0 $0 $0 $8,331,781 $8,665,052 $15,000,000
S13147 Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 0.81 $0 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
S13146 Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 0.19 $0 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
613872 Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
S13180 Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
S13179 Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
S13182 Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
S13194 Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
S13XXX CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE-BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $29,975 $0 $0 $0 $0 $0 $0 $0 $0 $29,975 $0 $29,975
613926 Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) 0.19 $0 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
0.04 $0 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,062,695
613816 Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
S13184 Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $6,250
S13183 Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $473,132
S13129 Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
S13181 Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 N/A N/A $0 $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028 PRC Approved (12/6/2018) 6.21 $0 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 1.36 $0 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 4.13 $0 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 0.69 $0 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 0.89 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) 2.17 $0 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 0.79 $0 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 1.10 $0 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 0.61 $0 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 0.33 $0 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 2.42 $0 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 Removed PRC Approved (1/28/2021) 4.07 $0 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $0 $0 $0 $11,705,708 $11,705,708
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 4.51 $0 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) 4.41 $0 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
0.46 $0 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 61.8 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $18,435,976 $28,492,560 $0 $0 $0 $0 $28,492,560 $16,581,200 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 53.3 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 1.40 $0 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) 2.17 $0 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) 6.21 $0 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $15,000,000 $0 $15,000,000 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 4.38 $0 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 0.62 $0 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) 0.66 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) 2.78 $0 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A $0 $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A $0 $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A $0 $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2026-29 Administrative N/A $0 $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000

 

Federal Fiscal Year 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $128,427,689 $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                       
Draft Total Programmed Regional Highway Target Funds: $127,962,693 $122,456,279 $98,848,795 $154,316,112 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $114,199,200 $676,499,119
Regional Highway Target Funds Remaining (Unprogrammed): $464,996 $2,829,409 $26,436,892 $816,031 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $45,838,211 $77,670,633
Percent Unprogrammed 0.4% 2.3% 21.1% 0.5% 1.0% 0.2% 1.3% 0.5% 1.2% 28.6% 10.3%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year.  GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority.  MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority.  N/A = not applicable.  NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined.  TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.     

 

 

 

 

Scenario 1B

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Years Since Last PINFO Milestone FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,316,061 $1,316,061
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $450,163 $450,163
S12699 Stoneham STONEHAM- SHUTTLE SERVICE 72 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $796,817 $796,817
S12697 Watertown WATERTOWN- PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,002,198 $1,002,198
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
S12979 Arlington ARLINGTON- BROADWAY COMPLETE STREETS DESIGN 80.1 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,395,000 $1,395,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,395,000 $1,395,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $90,878 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,878 $90,878
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A 2025
(FFYs 2025–29)
2025 2025 PS&E Received - Resubmission 3 (1/27/2025) 0.07 $2,305,605 $2,312,688 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,312,688 $2,312,688
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $590,348 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $590,348 $590,348
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 2025
(FFYs 2025–29)
2025 2025 N/A N/A $379,470 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $379,470 $379,470
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 2025
(FFYs 2025–29)
2025 2025 N/A N/A $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $385,456 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $385,456 $385,456
S12968 CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $65,000 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $65,000 $65,000
S12982 Framingham FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $850,000 $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $850,000 $850,000
S12984 Holliston HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] 42.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $250,000 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 2025
(FFYs 2025–29)
2025 2025 N/A N/A $81,250 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,250 $81,250
S12980 Marlborough MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,215,000 $1,215,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,215,000 $1,215,000
S12974 MBTA MBTA- CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS (CAMBRIDGE) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12822 MBTA MBTA- COLUMBUS AVENUE BUS LANES PHASE II (BOSTON) N/A 2021
(FFYs 2021–25)
2021, 2024-25 2021, 2024-25 N/A N/A $2,750,509 $2,750,509 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,750,509 $2,750,509
S12819 MBTA MBTA- JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $17,725,796 $17,725,796 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000 $33,500,000
S12976 MBTA MBTA- NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12821 MBTA MBTA- RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000 $20,000,000
S12975 MBTA MBTA- SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $2,500,000 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $2,500,000
S12981 Norfolk, Wrentham, Walpole NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] 65 N/A 2025 2025 N/A N/A $1,550,000 $1,550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,550,000 $1,550,000
609211 Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION 34 2024
(FFYs 2020–24)
2025 2025 PS&E Received - Resubmission 2 (5/31/2024) 0.73 $8,273,695 $8,273,695 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,273,695 $8,273,695
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK 63.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $169,000 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $169,000 $169,000
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,800 $22,800
S12983 Sherborn SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] 81.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $900,000 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000 $900,000
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $278,127 $278,127
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN CITY LINE 59 2023
(FFYs 2020–24)
2025 2025 100% Received (1/19/2024) 1.09 $37,452,645 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645 $37,452,645
S12969 CATA CATA- GLOUCESTER FACILITY MODERNIZATION TBD 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,293,000 $1,605,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000 $1,605,500
S13202 CATA CATA- AUTOMATIC PASSENGER COUNTING AND AUTOMATIC VEHICLE LOCATION DEPLOYMENT (TRANSIT PROJECT ID CATA011695) 36.2 N/A N/A 2025 N/A N/A $0 $680,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $680,000
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025 N/A N/A $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000
S13206 MBTA MBTA- CATAMARAN OVERHAUL 25 2024
(FFYs 2024–28)
Transit Program
N/A 2025 N/A N/A $0 $2,634,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,634,000
S13207 MBTA MBTA- NATICK CENTER STATION ACCESSIBILITY IMPROVEMENTS 62 N/A N/A 2025 Construction N/A $0 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
S13208 MBTA MBTA- WELLESLEY SQUARE STATION UPGRADES 50 N/A N/A 2025 N/A N/A $0 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000
S12972 MWRTA MWRTA- PROCUREMENT OF NINE 29 FOOT BUSES (CNG) 52.2 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,980,000 $6,180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $396,000 $0 $2,376,000 $6,576,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $1,710,000 $3,510,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $1,750,000 $7,750,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A $499,649 $499,649 $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 0.31 $6,061,917 $0 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 0.44 $13,966,099 $0 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 1.08 $3,438,311 $0 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 25% Received (1/5/2022) 3.13 $0 $0 $8,000,000 $19,711,298 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $19,711,298 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 4.06 $0 $0 $8,665,052 $8,331,781 $0 $0 $0 $0 $0 $0 $0 $0 $8,331,781 $8,665,052 $15,000,000
S13147 Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $0 $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 0.81 $0 $0 $28,738,432 $17,949,531 $0 $14,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
S13146 Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $0 $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 0.19 $0 $0 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
613872 Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
S13180 Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
S13179 Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
S13182 Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
S13194 Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
S13XXX CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE-BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $29,975 $0 $0 $0 $0 $0 $0 $0 $0 $29,975 $0 $29,975
613926 Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) 0.19 $0 $0 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
0.04 $0 $0 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,620,400
613816 Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
S13184 Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $0
S13183 Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $0
S13129 Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
S13181 Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
0.04 $0 $0 $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2027 PRC Approved (12/6/2018) 6.21 $0 $0 $10,000,000 $0 $9,698,640 $22,694,681 $0 $0 $0 $0 $0 $0 $22,694,681 $19,698,640 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 1.36 $0 $0 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 4.13 $0 $0 $27,636,336 $0 $0 $0 $0 $27,636,336 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 0.69 $0 $0 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 0.89 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) 2.17 $0 $0 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 0.79 $0 $0 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 1.10 $0 $0 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 0.61 $0 $0 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 0.33 $0 $0 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 2.42 $0 $0 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 Removed PRC Approved (1/28/2021) 4.07 $0 $0 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $0 $0 $0 $11,705,708 $11,705,708
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 4.51 $0 $0 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) 4.41 $0 $0 $0 $0 $0 $0 $10,000,000 $10,000,000 $18,995,267 $17,959,721 $0 $0 $27,959,721 $28,995,267 $27,959,721
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
0.46 $0 $0 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 61.8 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $8,624,000 $0 $0 $0 $8,624,000 $0 $8,624,000 $8,932,000 $8,624,000
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 53.3 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $18,435,976 $18,492,560 $0 $10,000,000 $0 $0 $28,492,560 $16,581,200 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 73 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 1.40 $0 $0 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 66.4 2027
(FFYs 2023–27)
2028-31 2028-31 PRC Approved (12/6/2018) 6.21 $0 $0 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $10,000,000 $20,000,000 $0 $30,000,000 $40,980,000 $44,258,400
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 74.9 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) 2.17 $0 $0 $0 $0 $0 $0 $4,858,127 $0 $0 $0 $4,858,127 $0 $4,858,127 $4,858,127 $4,858,127
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 4.38 $0 $0 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 0.62 $0 $0 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) 0.66 $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) 2.78 $0 $0 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A $0 $0 $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A $0 $0 $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A $0 $0 $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2026-29 Administrative N/A $0 $0 $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                         
Draft Total Programmed Regional Highway Target Funds: $0 $127,962,693 $122,456,279 $94,848,795 $154,316,112 $150,205,765 $157,810,837 $155,633,103 $160,243,467 $157,257,256 $132,681,327 $690,626,246
Regional Highway Target Funds Remaining (Unprogrammed): $128,427,689 $464,996 $2,829,409 $30,436,892 $816,031 $2,421,664 $241,338 $3,067,776 $787,141 $261,090 $27,356,084 $63,543,506
Percent Unprogrammed 100.0% 0.4% 2.3% 24.3% 0.5% 1.6% 0.2% 1.9% 0.5% 0.2% 17.1% 8.4%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year.  GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority.  MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority.  N/A = not applicable.  NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined.  TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.     

 

 

 

Scenario 1C

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Years Since Last PINFO Milestone FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,316,061 $1,316,061
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $450,163 $450,163
S12699 Stoneham STONEHAM- SHUTTLE SERVICE 72 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $796,817 $796,817
S12697 Watertown WATERTOWN- PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,002,198 $1,002,198
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
S12979 Arlington ARLINGTON- BROADWAY COMPLETE STREETS DESIGN 80.1 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,395,000 $1,395,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,395,000 $1,395,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $90,878 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,878 $90,878
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A 2025
(FFYs 2025–29)
2025 2025 PS&E Received - Resubmission 3 (1/27/2025) 0.07 $2,305,605 $2,312,688 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,312,688 $2,312,688
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $590,348 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $590,348 $590,348
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 2025
(FFYs 2025–29)
2025 2025 N/A N/A $379,470 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $379,470 $379,470
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 2025
(FFYs 2025–29)
2025 2025 N/A N/A $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $385,456 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $385,456 $385,456
S12968 CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $65,000 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $65,000 $65,000
S12982 Framingham FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $850,000 $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $850,000 $850,000
S12984 Holliston HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] 42.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $250,000 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 2025
(FFYs 2025–29)
2025 2025 N/A N/A $81,250 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,250 $81,250
S12980 Marlborough MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,215,000 $1,215,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,215,000 $1,215,000
S12974 MBTA MBTA- CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS (CAMBRIDGE) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12822 MBTA MBTA- COLUMBUS AVENUE BUS LANES PHASE II (BOSTON) N/A 2021
(FFYs 2021–25)
2021, 2024-25 2021, 2024-25 N/A N/A $2,750,509 $2,750,509 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,750,509 $2,750,509
S12819 MBTA MBTA- JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $17,725,796 $17,725,796 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000 $33,500,000
S12976 MBTA MBTA- NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12821 MBTA MBTA- RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000 $20,000,000
S12975 MBTA MBTA- SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $2,500,000 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $2,500,000
S12981 Norfolk, Wrentham, Walpole NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] 65 N/A 2025 2025 N/A N/A $1,550,000 $1,550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,550,000 $1,550,000
609211 Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION 34 2024
(FFYs 2020–24)
2025 2025 PS&E Received - Resubmission 2 (5/31/2024) 0.73 $8,273,695 $8,273,695 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,273,695 $8,273,695
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK 63.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $169,000 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $169,000 $169,000
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $22,800 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,800 $22,800
S12983 Sherborn SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] 81.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $900,000 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000 $900,000
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $278,127 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $278,127 $278,127
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN CITY LINE 59 2023
(FFYs 2020–24)
2025 2025 100% Received (1/19/2024) 1.09 $37,452,645 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645 $37,452,645
S12969 CATA CATA- GLOUCESTER FACILITY MODERNIZATION TBD 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,293,000 $1,605,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000 $1,605,500
S13202 CATA CATA- AUTOMATIC PASSENGER COUNTING AND AUTOMATIC VEHICLE LOCATION DEPLOYMENT (TRANSIT PROJECT ID CATA011695) 36.2 N/A N/A 2025 N/A N/A $0 $680,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $680,000
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025 N/A N/A $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000
S13206 MBTA MBTA- CATAMARAN OVERHAUL 25 2024
(FFYs 2024–28)
Transit Program
N/A 2025 N/A N/A $0 $2,634,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,634,000
S13207 MBTA MBTA- NATICK CENTER STATION ACCESSIBILITY IMPROVEMENTS 62 N/A N/A 2025 Construction N/A $0 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
S13208 MBTA MBTA- WELLESLEY SQUARE STATION UPGRADES 50 N/A N/A 2025 N/A N/A $0 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000
S12972 MWRTA MWRTA- PROCUREMENT OF NINE 29 FOOT BUSES (CNG) 52.2 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,980,000 $6,180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $396,000 $0 $2,376,000 $6,576,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $1,710,000 $3,510,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $1,750,000 $7,750,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A $499,649 $499,649 $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 0.31 $6,061,917 $0 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 0.44 $13,966,099 $0 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 1.08 $3,438,311 $0 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 25% Received (1/5/2022) 3.13 $0 $0 $8,000,000 $19,711,298 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $19,711,298 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 4.06 $0 $0 $8,665,052 $8,331,781 $0 $0 $0 $0 $0 $0 $0 $0 $8,331,781 $8,665,052 $15,000,000
S13147 Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $0 $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 0.81 $0 $0 $28,738,432 $31,949,531 $0 $0 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
S13146 Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $0 $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 0.19 $0 $0 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
613872 Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
S13180 Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
S13179 Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
S13182 Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
S13194 Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
S13XXX CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $29,975 $0 $0 $0 $0 $0 $0 $0 $0 $29,975 $0 $29,975
613926 Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) 0.19 $0 $0 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
0.04 $0 $0 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,620,400
613816 Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
S13184 Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $0
S13183 Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $0
S13129 Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
S13181 Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
0.04 $0 $0 $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2027 PRC Approved (12/6/2018) 6.21 $0 $0 $10,000,000 $0 $9,698,640 $22,694,681 $0 $0 $0 $0 $0 $0 $22,694,681 $19,698,640 $19,698,640
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 1.36 $0 $0 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 4.13 $0 $0 $27,636,336 $0 $0 $17,636,336 $0 $10,000,000 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 0.69 $0 $0 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 0.89 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) 2.17 $0 $0 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 0.79 $0 $0 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 1.10 $0 $0 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 0.61 $0 $0 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 0.33 $0 $0 $0 $0 $30,000,000 $25,000,000 $30,000,000 $25,000,000 $30,310,000 $30,310,000 $48,075,573 $53,750,000 $128,385,573 $95,310,000 $128,385,573
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 2.42 $0 $0 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 Removed PRC Approved (1/28/2021) 4.07 $0 $0 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $0 $0 $0 $11,705,708 $11,705,708
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 4.51 $0 $0 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) 4.41 $0 $0 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
0.46 $0 $0 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 61.8 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 53.3 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $18,435,976 $28,492,560 $0 $0 $0 $0 $28,492,560 $16,581,200 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 73 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 1.40 $0 $0 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 66.4 2027
(FFYs 2023–27)
2028-31 2028-31 PRC Approved (12/6/2018) 6.21 $0 $0 $0 $0 $0 $0 $15,000,000 $10,000,000 $20,000,000 $10,000,000 $20,000,000 $0 $40,000,000 $40,980,000 $44,258,400
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 74.9 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) 2.17 $0 $0 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 4.38 $0 $0 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 0.62 $0 $0 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) 0.66 $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) 2.78 $0 $0 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A $0 $0 $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A $0 $0 $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A $0 $0 $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2026-29 Administrative N/A $0 $0 $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                         
Draft Total Programmed Regional Highway Target Funds: $0 $127,962,693 $122,456,279 $108,848,795 $154,316,112 $148,842,101 $157,810,837 $154,961,473 $160,243,467 $155,699,104 $132,274,773 $700,626,246
Regional Highway Target Funds Remaining (Unprogrammed): $128,427,689 $464,996 $2,829,409 $16,436,892 $816,031 $3,785,328 $241,338 $3,739,406 $787,141 $1,819,242 $27,762,638 $53,543,506
Percent Unprogrammed 100.0% 0.4% 2.3% 13.1% 0.5% 2.5% 0.2% 2.4% 0.5% 1.2% 17.3% 7.1%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

Abbreviations

 ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year.  GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority.  MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority.  N/A = not applicable.  NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined.  TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.   

 

 

 

 

Scenario 1D

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Years Since Last PINFO Milestone FFY 2025 FFY 2025 (New) FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
S12703 MART MONTACHUSETT RTA MICROTRANSIT SERVICE 57 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $406,641 $406,641 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,316,061 $1,316,061
S12701 MWRTA MWRTA CATCHCONNECT MICROTRANSIT SERVICE EXPANSION – HUDSON AND MARLBOROUGH 59 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $159,488 $159,488 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $450,163 $450,163
S12699 Stoneham STONEHAM- SHUTTLE SERVICE 72 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $205,189 $205,189 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $796,817 $796,817
S12697 Watertown WATERTOWN- PLEASANT STREET SHUTTLE SERVICE EXPANSION 78 2023
(FFYs 2023–27)
2023-25 2023-25 N/A N/A $228,939 $228,939 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,002,198 $1,002,198
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A $165,625 $165,625 $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
S12979 Arlington ARLINGTON- BROADWAY COMPLETE STREETS DESIGN 80.1 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,395,000 $1,395,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,395,000 $1,395,000
S12965 Arlington ARLINGTON- INSTALLATION OF 123 BICYCLE RACKS AND RELATED MATERIALS 74.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $90,878 $90,878 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $90,878 $90,878
609531 MassDOT ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) N/A 2025
(FFYs 2025–29)
2025 2025 PS&E Received - Resubmission 3 (1/27/2025) 0.07 $2,305,605 $2,312,688 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,312,688 $2,312,688
S12958 Boston BOSTON- BLUEBIKES STATION REPLACEMENT AND ELECTRIFICATION, 12 STATIONS 76.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $590,348 $590,348 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $590,348 $590,348
S12959 Boston BOSTON- REPURPOSING SINGLE SPACE PARKING METER POLES FOR 1600 BICYCLE RACKS 82 2025
(FFYs 2025–29)
2025 2025 N/A N/A $379,470 $379,470 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $379,470 $379,470
S12691 Brookline BROOKLINE- BLUEBIKES STATE OF GOOD REPAIR, 3 STATIONS AND 62 PEDAL BIKES 67 2025
(FFYs 2025–29)
2025 2025 N/A N/A $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $200,000
S12960 Cambridge CAMBRIDGE- BLUEBIKES STATE OF GOOD REPAIR, 8 STATIONS AND 65 PEDAL BIKES 68.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $385,456 $385,456 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $385,456 $385,456
S12968 CATA CATA - FARE UPGRADES FOR ADA AND DIAL-A-RIDE CUSTOMERS N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $65,000 $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $65,000 $65,000
S12982 Framingham FRAMINGHAM- CHRIS WALSH TRAIL PHASE 2 [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $850,000 $850,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $850,000 $850,000
S12984 Holliston HOLLISTON- INTERSECTION IMPROVEMENTS AT ROUTE 16 AND WHITNEY STREET [DESIGN ONLY] 42.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $250,000 $250,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000
S12966 Malden MALDEN- CANAL STREET BICYCLE LANES 51.25 2025
(FFYs 2025–29)
2025 2025 N/A N/A $81,250 $81,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,250 $81,250
S12980 Marlborough MARLBOROUGH- RECONSTRUCTION OF GRANGER BOULEVARD [DESIGN ONLY] 79.9 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,215,000 $1,215,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,215,000 $1,215,000
S12974 MBTA MBTA- CENTRAL SQUARE STATION ACCESSIBILITY IMPROVEMENTS (CAMBRIDGE) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12822 MBTA MBTA- COLUMBUS AVENUE BUS LANES PHASE II (BOSTON) N/A 2021
(FFYs 2021–25)
2021, 2024-25 2021, 2024-25 N/A N/A $2,750,509 $2,750,509 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,750,509 $2,750,509
S12819 MBTA MBTA- JACKSON SQUARE STATION ACCESSIBILITY IMPROVEMENTS N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $17,725,796 $17,725,796 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $33,500,000 $33,500,000
S12976 MBTA MBTA- NUBIAN SQUARE ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS (BOSTON) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000
S12821 MBTA MBTA- RAIL TRANSFORMATION - EARLY ACTION ITEMS - READING STATION AND WILBUR INTERLOCKING N/A 2024
(FFYs 2024–28)
2024-25 2024-25 N/A N/A $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000,000 $20,000,000
S12975 MBTA MBTA- SYSTEMWIDE PEDAL AND PARK MODERNIZATION (ALEWIFE, ASHMONT, BRAINTREE, DAVIS SQUARE, FOREST HILLS, MALDEN CENTER, NUBIAN, OAK GROVE, ROUTE 128, SALEM, SOUTH STATION, WOLLASTON, WONDERLAND) N/A 2025
(FFYs 2025–29)
2025 2025 N/A N/A $2,500,000 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $2,500,000
S12981 Norfolk, Wrentham, Walpole NORFOLK-WRENTHAM-WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) [DESIGN ONLY] 65 N/A 2025 2025 N/A N/A $1,550,000 $1,550,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,550,000 $1,550,000
609211 Peabody PEABODY- INDEPENDENCE GREENWAY EXTENSION 34 2024
(FFYs 2020–24)
2025 2025 PS&E Received - Resubmission 2 (5/31/2024) 0.73 $8,273,695 $8,273,695 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,273,695 $8,273,695
S12694 Revere REVERE- BLUEBIKES EXPANSION TO NORTHERN STRAND (SALEM STREET AT NORTH MARSHALL STREET) AND GRISWOLD PARK 63.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $169,000 $169,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $169,000 $169,000
S12967 Scituate SCITUATE- INSTALLATION OF 25 BICYCLE RACKS 45.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $0 $22,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $22,800 $22,800
S12983 Sherborn SHERBORN- RECONSTRUCTION OF ROUTE 27 AND ROUTE 16 [DESIGN ONLY] 81.8 2025
(FFYs 2025–29)
2025 2025 N/A N/A $900,000 $900,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $900,000 $900,000
S12962 Somerville SOMERVILLE- BLUEBIKES STATE OF GOOD REPAIR, 13 STATIONS 67.5 2025
(FFYs 2025–29)
2025 2025 N/A N/A $0 $278,127 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $278,127 $278,127
608051 MassDOT WILMINGTON- RECONSTRUCTION ON ROUTE 38 (MAIN STREET), FROM ROUTE 62 TO THE WOBURN CITY LINE 59 2023
(FFYs 2020–24)
2025 2025 100% Received (1/19/2024) 1.09 $37,452,645 $37,452,645 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $37,452,645 $37,452,645
S12969 CATA CATA- GLOUCESTER FACILITY MODERNIZATION TBD 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,293,000 $1,605,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,293,000 $1,605,500
S13202 CATA CATA- AUTOMATIC PASSENGER COUNTING AND AUTOMATIC VEHICLE LOCATION DEPLOYMENT (TRANSIT PROJECT ID CATA011695) 36.2 N/A N/A 2025 N/A N/A $0 $680,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $680,000
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025 N/A N/A $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000
S13206 MBTA MBTA- CATAMARAN OVERHAUL 25 2024
(FFYs 2024–28)
Transit Program
N/A 2025 N/A N/A $0 $2,634,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,634,000
S13207 MBTA MBTA- NATICK CENTER STATION ACCESSIBILITY IMPROVEMENTS 62 N/A N/A 2025 Construction N/A $0 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000
S13208 MBTA MBTA- WELLESLEY SQUARE STATION UPGRADES 50 N/A N/A 2025 N/A N/A $0 $5,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000
S12972 MWRTA MWRTA- PROCUREMENT OF NINE 29 FOOT BUSES (CNG) 52.2 2025
(FFYs 2025–29)
2025 2025 N/A N/A $1,980,000 $6,180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $396,000 $0 $2,376,000 $6,576,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $1,710,000 $3,510,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A $1,750,000 $7,750,000 $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A $499,649 $499,649 $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 0.31 $6,061,917 $0 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 0.44 $13,966,099 $0 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 1.08 $3,438,311 $0 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 25% Received (1/5/2022) 3.13 $0 $0 $8,000,000 $19,711,298 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $19,711,298 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 4.06 $0 $0 $8,665,052 $8,331,781 $0 $0 $0 $0 $0 $0 $0 $0 $8,331,781 $8,665,052 $15,000,000
S13147 Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $0 $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 0.81 $0 $0 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
S13146 Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A $0 $0 $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 0.19 $0 $0 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
613872 Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
S13180 Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
S13179 Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
S13182 Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
S13194 Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
S13XXX CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE-BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $29,975 $0 $0 $0 $0 $0 $0 $0 $0 $29,975 $0 $29,975
613926 Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) 0.19 $0 $0 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
0.04 $0 $0 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,062,695
613816 Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) 0.39 $0 $0 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
S13184 Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $6,250
S13183 Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $473,132
S13129 Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A $0 $0 $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
S13181 Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 N/A N/A $0 $0 $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028 PRC Approved (12/6/2018) 6.21 $0 $0 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 1.36 $0 $0 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 4.13 $0 $0 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 0.69 $0 $0 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 0.89 $0 $0 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) 2.17 $0 $0 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 0.79 $0 $0 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 1.10 $0 $0 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 0.61 $0 $0 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 0.33 $0 $0 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 2.42 $0 $0 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 Removed PRC Approved (1/28/2021) 4.07 $0 $0 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $0 $0 $0 $11,705,708 $11,705,708
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 4.51 $0 $0 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) 4.41 $0 $0 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
0.46 $0 $0 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 61.8 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $18,435,976 $28,492,560 $0 $0 $0 $0 $28,492,560 $16,581,200 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 53.3 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 1.40 $0 $0 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) 2.17 $0 $0 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2029-32 PRC Approved (12/6/2018) 6.21 $0 $0 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $15,000,000 $15,000,000 $0 $30,000,000 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2030-34 25% Received - Resubmission 1 (10/5/2020) 4.38 $0 $0 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $0 $33,500,000 $0 $33,500,000 $197,759,449 $197,759,449
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 0.62 $0 $0 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) 5.18 $0 $0 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) 0.66 $0 $0 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) 2.78 $0 $0 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A $0 $0 $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A $0 $0 $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A $0 $0 $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2026-29 Administrative N/A $0 $0 $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000

 

Federal Fiscal Year 2025 2025 (New) 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $128,427,689 $128,427,689 $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                         
Draft Total Programmed Regional Highway Target Funds: $0 $127,962,693 $122,456,279 $98,848,795 $154,316,112 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $137,199,104 $114,199,200 $657,999,119
Regional Highway Target Funds Remaining (Unprogrammed): $128,427,689 $464,996 $2,829,409 $26,436,892 $816,031 $1,480,009 $241,338 $2,096,279 $787,141 $20,319,242 $45,838,211 $96,170,633
Percent Unprogrammed 100.0% 0.4% 2.3% 21.1% 0.5% 1.0% 0.2% 1.3% 0.5% 12.9% 28.6% 12.8%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year.  GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority.  MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority.  N/A = not applicable.  NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined.  TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.