FFYs 2026-2030 Transportation Improvement Program Revised Scenarios 2A-C

 

Scenario 2A

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A N/A N/A $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025-26 N/A N/A N/A N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $1,000,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A N/A N/A $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 100% 10/31/24 0.38 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 75% 9/12/24 0.52 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 25% 1/22/24 1.16 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 75% Rejected (3/6/2025) 75% 3/6/25 0.04 $8,000,000 $27,306,266 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $27,306,266 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 4.14 $8,665,052 $10,185,935 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $8,665,052 $15,000,000
S13147 Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A N/A N/A $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 75% 4/29/24 0.89 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
S13146 Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A N/A N/A $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 100% 12/13/24 0.27 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
613872 Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) PRC 10/02/2024 0.46 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
S13180 Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
S13179 Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
S13182 Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
613357 Cambridge CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET N/A 2025
(FFYs 2025–29)
Earmark Discretionary
2025 2026 25% Received
02/14/2025
25% 2/14/25 0.09 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $1,632,130 $2,000,000
S13194 Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
S13291 CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE-BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $43,000 $0 $0 $0 $0 $0 $0 $0 $0 $43,000 $0 $43,000
613926 Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) PRC 12/12/24 0.27 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
100% 2/6/25 0.12 $0 $5,829,514 $0 $0 $0 $0 $0 $0 $0 $0 $5,829,514 $38,491,410 $5,829,514
613816 Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) PRC 10/02/2024 0.46 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
S13184 Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $6,250
S13153 MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 44.6 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $3,216,897 $0 $0 $0 $0 $0 $0 $0 $0 $3,216,897 $0 $3,216,897
S13292 MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 N/A 2026- N/A 2026 N/A N/A N/A N/A $0 $1,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $0 $1,875,000
S13183 Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $473,132
S13129 Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
S13181 Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 N/A N/A N/A N/A $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 1.44 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 25% 1/5/21 4.21 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 75% 6/12/24 0.77 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 75% 4/1/24 0.97 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) PRC 12/21/22 2.25 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 25% 5/8/24 0.87 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 75% 1/17/24 1.17 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 25% 7/12/24 0.69 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 25% 10/21/24 0.41 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 25% 9/22/22 2.49 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 25% 8/19/20 4.59 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) PRC 9/24/20 4.49 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
25% 9/4/24 0.54 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 61.8 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $18,435,976 $28,492,560 $0 $0 $0 $0 $28,492,560 $16,581,200 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 53.3 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 25% 9/28/23 1.48 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) PRC 12/20/22 2.25 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $15,000,000 $0 $15,000,000 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 4.46 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 25% 7/9/24 0.70 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) PRC 6/24/24 0.74 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) PRC 5/12/22 2.86 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A N/A N/A $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A N/A N/A $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A N/A N/A $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2028-30 Administrative N/A N/A N/A $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 2030-31 PRC Approved (1/28/2021) PRC 1/28/21 4.14 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $8,000,000 $0 $8,000,000 $11,705,708 $12,123,769
612534 Melrose MELROSE- LEBANON STREET IMPROVEMENT PROJECT (LYNDE STREET TO MALDEN CITY LINE) 56.4 2030
(FFYs 2026–30)
N/A 2030 25% Submitted
(1/10/2025)
25% 1/10/25 0.19 $0 $0 $0 $0 $0 $0 $0 $0 $10,528,000 $0 $10,528,000 $0 $4,341,220
613594 Newton NEEDHAM-NEWTON- BRIDGE REPLACEMENT ON CHRISTINA STREET 65.6 2030
(FFYs 2026–30)
N/A 2030 PRC-Approved
(10/12/2023)
PRC 10/12/23 1.44 $0 $0 $0 $0 $0 $0 $0 $0 $5,551,514 $0 $5,551,514 $0 $5,551,514
612870 Concord CONCORD- ASSABET RIVER MULTI-USE TRAIL AND BRIDGE CONSTRUCTION 55.1 2030-31
(FFYs 2026–30)
N/A 2030-31 PRC-Approved
(8/29/2022)
PRC 8/29/22 2.56 $0 $0 $0 $0 $0 $0 $0 $0 $4,802,400 $0 $4,802,400 $0 $9,604,800
613695 Lexington LEXINGTON- ROADWAY RECONSTRUCTION ON HARTWELL AVENUE AND BEDFORD STREET 72.6 2030-32
(FFYs 2026–30)
N/A 2030-32 PRC-Approved
(5/31/2024)
PRC 5/31/24 0.80 $0 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $0 $10,000,000 $0 $46,195,840

 

 

Federal Fiscal Year 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                     
Draft Total Programmed Regional Highway Target Funds: $124,569,057 $121,169,658 $154,779,919 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $153,081,114 $737,701,896
Regional Highway Target Funds Remaining (Unprogrammed): $716,631 $4,116,029 $352,224 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $6,956,297 $16,467,856
Percent Unprogrammed 0.6% 3.3% 0.2% 1.0% 0.2% 1.3% 0.5% 1.2% 4.3% 2.2%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year. GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined. TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.

 

 

 


 

Scenario 2B

 

Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A N/A N/A $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025-26 N/A N/A N/A N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $1,000,000
CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A N/A N/A $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 100% 10/31/24 0.38 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 75% 9/12/24 0.52 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 25% 1/22/24 1.16 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 75% Rejected (3/6/2025) 75% 3/6/25 0.04 $8,000,000 $27,306,266 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $27,306,266 $20,499,750 $19,711,298
Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 4.14 $8,665,052 $10,185,935 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $8,665,052 $15,000,000
Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A N/A N/A $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 75% 4/29/24 0.89 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A N/A N/A $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 100% 12/13/24 0.27 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) PRC 10/02/2024 0.46 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
Cambridge CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET N/A 2025
(FFYs 2025–29)
Earmark Discretionary
2025 2026 25% Received
02/14/2025
25% 2/14/25 0.09 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $1,632,130 $2,000,000
Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE-BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $43,000 $0 $0 $0 $0 $0 $0 $0 $0 $43,000 $0 $43,000
Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) PRC 12/12/24 0.27 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
100% 2/6/25 0.12 $0 $5,829,514 $0 $0 $0 $0 $0 $0 $0 $0 $5,829,514 $38,491,410 $5,829,514
Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) PRC 10/02/2024 0.46 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $6,250
MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 44.6 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $3,216,897 $0 $0 $0 $0 $0 $0 $0 $0 $3,216,897 $0 $3,216,897
MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 N/A 2026- N/A 2026 N/A N/A N/A N/A $0 $1,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $0 $1,875,000
Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $473,132
Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 N/A N/A N/A N/A $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 1.44 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 25% 1/5/21 4.21 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 75% 6/12/24 0.77 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 75% 4/1/24 0.97 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) PRC 12/21/22 2.25 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 25% 5/8/24 0.87 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 75% 1/17/24 1.17 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 25% 7/12/24 0.69 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 25% 10/21/24 0.41 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 25% 9/22/22 2.49 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 25% 8/19/20 4.59 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) PRC 9/24/20 4.49 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
25% 9/4/24 0.54 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 61.8 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $18,435,976 $28,492,560 $0 $0 $0 $0 $28,492,560 $16,581,200 $18,435,976
Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 53.3 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 25% 9/28/23 1.48 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) PRC 12/20/22 2.25 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $47,536,800 $0 $47,536,800 $40,980,000 $47,536,800
Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 4.46 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 25% 7/9/24 0.70 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) PRC 6/24/24 0.74 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) PRC 5/12/22 2.86 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A N/A N/A $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A N/A N/A $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A N/A N/A $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2028-30 Administrative N/A N/A N/A $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000
Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 2030-31 PRC Approved (1/28/2021) PRC 1/28/21 4.14 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $12,123,769 $0 $12,123,769 $11,705,708 $12,123,769

 

 

Federal Fiscal Year 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                     
Draft Total Programmed Regional Highway Target Funds: $124,569,057 $121,169,658 $154,779,919 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $158,859,769 $743,480,551
Regional Highway Target Funds Remaining (Unprogrammed): $716,631 $4,116,029 $352,224 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $1,177,642 $10,689,201
Percent Unprogrammed 0.6% 3.3% 0.2% 1.0% 0.2% 1.3% 0.5% 1.2% 0.7% 1.4%

 

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year. GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined. TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.

 

 


 

Scenario 2C

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
S12807 MWRTA MWRTA CATCHCONNECT MICTROTRANSIT EXPANSION PHASE 2 – FRAMINGHAM AND NATICK EXTENDED HOURS 90 2024
(FFYs 2024–28)
2024-26 2024-26 N/A N/A N/A N/A $162,500 $162,500 $0 $0 $0 $0 $0 $0 $0 $0 $162,500 $380,477 $380,477
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025-26 N/A N/A N/A N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $1,000,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 53.75 2025
(FFYs 2025–29)
2025-27 2025-27 N/A N/A N/A N/A $450,278 $450,278 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $914,085 $1,413,734 $1,413,375
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 100% 10/31/24 0.38 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 75% 9/12/24 0.52 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 25% 1/22/24 1.16 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 75% Rejected (3/6/2025) 75% 3/6/25 0.04 $8,000,000 $27,306,266 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $27,306,266 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 4.14 $8,665,052 $10,185,935 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $8,665,052 $15,000,000
S13147 Framingham FRAMINGHAM- PRELIMINARY DESIGN OF INTERSECTION IMPROVEMENTS AT ROUTE 126/135/MBTA AND CSX RAILROAD TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A N/A N/A $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 75% 4/29/24 0.89 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
S13146 Lexington LEXINGTON- DESIGN OF SAFETY IMPROVEMENTS AT THE INTERSTATE 95 AND ROUTE 4/225 INTERCHANGE TBD 2026
(FFYs 2025–29)
2026 2026 N/A N/A N/A N/A $1,650,000 $1,650,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,000 $1,650,000 $1,650,000
608940 Weston WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET  50.6 2026
(FFYs 2023–27)
2026 2026 100% Received (12/13/2024) 100% 12/13/24 0.27 $3,237,804 $3,966,586 $0 $0 $0 $0 $0 $0 $0 $0 $3,966,586 $3,237,804 $4,125,249
613872 Acton ACTON- RECONSTRUCTION OF ROUTE 2A/119 (GREAT ROAD), FROM DAVIS ROAD TO HARRIS STREET (DESIGN ONLY) 41.35 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) PRC 10/02/2024 0.46 $0 $860,000 $0 $0 $0 $0 $0 $0 $0 $0 $860,000 $0 $860,000
S13180 Boston BOSTON- BLUEBIKES STATION REPLACEMENT, 20 STATIONS 70.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $783,860 $0 $0 $0 $0 $0 $0 $0 $0 $783,860 $0 $783,860
S13179 Brookline BROOKLINE- BLUEBIKES EXPANSION, 3 STATIONS, 20 EBIKES 67.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $238,646 $0 $0 $0 $0 $0 $0 $0 $0 $238,646 $0 $238,646
S13182 Cambridge CAMBRIDGE- BLUEBIKES STATION REPLACEMENT, 7 STATIONS 65.5 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $223,715 $0 $0 $0 $0 $0 $0 $0 $0 $223,715 $0 $223,715
613357 Cambridge CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET N/A 2025
(FFYs 2025–29)
Earmark Discretionary
2025 2026 25% Received
02/14/2025
25% 2/14/25 0.09 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $1,632,130 $2,000,000
S13194 Chelsea CHELSEA- BLUEBIKES EXPANSION, 3 STATIONS, 28 CLASSIC BIKES, 5 EBIKES 66 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $107,785 $0 $0 $0 $0 $0 $0 $0 $0 $107,785 $0 $107,785
S13291 CTPS CTPS- PROCUREMENT AND INSTALLATION OF SIX AIR QUALITY SENSORS FOR GHG MONITORING (PERFORMANCE-BASED PLANNING PROGRAM) N/A 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $43,000 $0 $0 $0 $0 $0 $0 $0 $0 $43,000 $0 $43,000
613926 Hudson HUDSON- BIKE PATH CONSTRUCTION OF MASS CENTRAL RAIL TRAIL, FROM FELTON STREET TO PRIEST STREET (DESIGN ONLY) 68.4 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (12/12/2024) PRC 12/12/24 0.27 $0 $909,700 $0 $0 $0 $0 $0 $0 $0 $0 $909,700 $0 $909,700
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
100% 2/6/25 0.12 $0 $5,829,514 $0 $0 $0 $0 $0 $0 $0 $0 $5,829,514 $38,491,410 $5,829,514
613816 Malden MALDEN- DESIGN OF IMPROVEMENTS ON ROUTE 60 (PHASE 1 AND 2), FRANKLIN STREET TO LYNN STREET 69 2026
(FFYs 2026–30)
N/A 2026 PRC Approved (10/02/2024) PRC 10/02/2024 0.46 $0 $800,000 $0 $0 $0 $0 $0 $0 $0 $0 $800,000 $0 $800,000
S13184 Marblehead MARBLEHEAD- INSTALLATION OF 22 BIKE RACKS 61 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $6,250 $0 $0 $0 $0 $0 $0 $0 $0 $6,250 $0 $6,250
S13153 MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 44.6 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $3,216,897 $0 $0 $0 $0 $0 $0 $0 $0 $3,216,897 $0 $3,216,897
S13292 MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 N/A 2026- N/A 2026 N/A N/A N/A N/A $0 $1,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $0 $1,875,000
S13183 Newton NEWTON- INSTALLATION OF 67 BIKE RACKS, 2 SHELTERS, 12 RRFBs 64 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $473,132 $0 $0 $0 $0 $0 $0 $0 $0 $473,132 $0 $473,132
S13129 Salem SALEM- BROAD STREET AND DALTON PARKWAY CORRIDOR PROJECT (DESIGN ONLY) 64.2 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $1,068,780 $0 $0 $0 $0 $0 $0 $0 $0 $1,068,780 $0 $1,068,780
S13181 Somerville SOMERVILLE- BLUEBIKES STATION REPLACEMENT, 5 STATIONS 67.5 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 N/A N/A N/A N/A $0 $107,417 $0 $0 $0 $0 $0 $0 $0 $0 $107,417 $38,491,410 $6,620,400
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 1.44 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 25% 1/5/21 4.21 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 75% 6/12/24 0.77 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
609532 MassDOT CHELSEA- TARGETED SAFETY IMPROVEMENTS AND RELATED WORK ON BROADWAY, FROM WILLIAMS STREET TO CITY HALL AVENUE 83 2026
(FFYs 2024–28)
2026 Removed 75% Comments to DE (4/1/2024) 75% 4/1/24 0.97 $9,807,515 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,807,515 $9,430,303
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 53.2 2026
(FFYs 2024–28)
2027 2027 PRC Approved (12/21/2022) PRC 12/21/22 2.25 $0 $0 $16,632,000 $16,531,736 $0 $0 $0 $0 $0 $0 $16,531,736 $16,632,000 $16,531,736
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 54 2024
(FFYs 2020–24)
2027 2027 25% Comments to DE (5/8/2024) 25% 5/8/24 0.87 $0 $0 $12,539,448 $12,075,024 $0 $0 $0 $0 $0 $0 $12,075,024 $12,539,448 $12,075,024
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 68 2026
(FFYs 2023–27)
2027 2027 75% Received (1/17/2024) 75% 1/17/24 1.17 $0 $0 $26,122,722 $25,155,213 $0 $0 $0 $0 $0 $0 $25,155,213 $26,122,722 $26,122,722
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 25% 7/12/24 0.69 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 25% 10/21/24 0.41 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 25% 9/22/22 2.49 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 Removed PRC Approved (1/28/2021) PRC 1/28/21 4.07 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $0 $0 $0 $11,705,708 $11,705,708
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 25% 8/19/20 4.59 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) PRC 9/24/20 4.49 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 67 2028
(FFYs 2024–28)
2028 2028 25% Received - Resubmission 1
(9/4/2024)
25% 9/4/24 0.54 $0 $0 $0 $0 $7,492,849 $11,085,739 $0 $0 $0 $0 $11,085,739 $7,760,451 $11,496,322
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 61.8 2028
(FFYs 2024–28)
2028 2028 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $18,435,976 $28,492,560 $0 $0 $0 $0 $28,492,560 $16,581,200 $18,435,976
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 53.3 FFY 2028
(FFYs 2024–28)
2028-29 2028-29 25% Design Public Hearing (9/28/2023) 25% 9/28/23 1.48 $0 $0 $0 $0 $12,854,847 $12,038,602 $10,000,000 $10,000,000 $0 $0 $22,038,602 $22,854,847 $22,854,847
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) PRC 12/20/22 2.25 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $15,000,000 $0 $15,000,000 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 4.46 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 47 2029
(FFYs 2025–29)
2029 2029-30 25% Received (7/9/2024) 25% 7/9/24 0.70 $0 $0 $0 $0 $0 $0 $4,263,000 $8,628,506 $0 $0 $8,628,506 $8,526,000 $8,628,506
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 75 2025
(FFYs 2021–25)
2029 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $0 $0 $9,335,200 $9,335,200 $8,691,200 $0 $18,026,400 $17,382,600 $18,670,200
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 54.3 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (6/24/2024) PRC 6/24/24 0.74 $0 $0 $0 $0 $0 $0 $8,340,000 $8,340,000 $7,508,000 $0 $15,848,000 $16,680,000 $15,848,000
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 37.9 2029
(FFYs 2025–29)
2029 2029-30 PRC Approved (5/12/2022) PRC 5/12/22 2.86 $0 $0 $0 $0 $0 $0 $3,000,000 $5,183,829 $0 $0 $5,183,829 $5,183,829 $5,183,829
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A N/A N/A 2027-30 Administrative N/A N/A N/A $0 $0 $0 $2,000,000 $0 $3,000,000 $0 $3,000,000 $3,000,000 $0 $11,000,000 $0 $11,000,000
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A N/A 2026-29 2027-30 Administrative N/A N/A N/A $1,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $8,000,000 $6,000,000 $7,000,000
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A N/A 2026-29 2027-30 Administrative N/A N/A N/A $1,887,222 $0 $2,036,193 $2,036,193 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $0 $9,036,193 $8,334,827 $8,423,415
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A N/A 2026-29 2028-30 Administrative N/A N/A N/A $5,000,000 $0 $5,500,000 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $0 $19,500,000 $21,500,000 $23,000,000
613568 Cambridge CAMBRIDGE- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR 79.4 2030
(FFYs 2026–30)
N/A 2030 PRC-Approved (5/31/2024) PRC 5/31/24 0.80 $0 $0 $0 $0 $0 $0 $0 $0 $18,238,535 $0 $18,238,535 $0 $18,238,535
613585 Everett CHELSEA-EVERETT- RECONSTRUCTION OF VINE STREET AND THIRD STREET FROM CHELSEA STREET TO 2ND STREET 67.1 2030-31
(FFYs 2026–30)
N/A 2030 PRC-Approved (10/12/2023) PRC 10/12/23 1.44 $0 $0 $0 $0 $0 $0 $0 $0 $13,119,298 $0 $13,119,298 $0 $13,119,298
613695 Lexington LEXINGTON- ROADWAY RECONSTRUCTION ON HARTWELL AVENUE AND BEDFORD STREET 72.6 2030-32
(FFYs 2026–30)
N/A 2030-32 PRC-Approved
(5/31/2024)
PRC 5/31/24 0.80 $0 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $0 $10,000,000 $0 $46,195,840

 

 

Federal Fiscal Year 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                     
Draft Total Programmed Regional Highway Target Funds: $124,569,057 $121,169,658 $154,779,919 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $155,557,033 $740,177,815
Regional Highway Target Funds Remaining (Unprogrammed): $716,631 $4,116,029 $352,224 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $4,480,378 $13,991,937
Percent Unprogrammed 0.6% 3.3% 0.2% 1.0% 0.2% 1.3% 0.5% 1.2% 2.8% 1.9%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles. 

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year. GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined. TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.