FFYs 2026-2030 Transportation Improvement Program Revised Scenarios 2A-C: Simplified

 

Scenario 2A-Simplified

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
2026 Higher-Risk Projects                                          
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 100% 10/31/24 0.38 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 75% 9/12/24 0.52 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 25% 1/22/24 1.16 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 75% Rejected (3/6/2025) 75% 3/6/25 0.04 $8,000,000 $27,306,266 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $27,306,266 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 4.14 $8,665,052 $10,185,935 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $8,665,052 $15,000,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 75% 4/29/24 0.89 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
2026 Transit Transformation                                          
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025-26 N/A N/A N/A N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $1,000,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S13153 MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 44.6 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $3,216,897 $0 $0 $0 $0 $0 $0 $0 $0 $3,216,897 $0 $3,216,897
S13XXX MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 N/A 2026- N/A 2026 N/A N/A N/A N/A $0 $1,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $0 $1,875,000
2026 Other New Projects                                          
613357 Cambridge CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET N/A 2025
(FFYs 2025–29)
Earmark Discretionary
2025 2026 25% Received
02/14/2025
25% 2/14/25 0.09 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $1,632,130 $2,000,000
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
100% 2/6/25 0.12 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,062,695
2026 Community Connections + GHG Monitoring: Bluebikes Replacement in Boston, Cambridge, and Somerville, Bluebikes Expansion in Brookline and Chelsea, Bike Racks/Shelters/RRFBs in Newton and Marblehead, and Air Quality Sensors for the PBPP                 $0 $1,983,805 $0 $0 $0 $0 $0 $0 $0 $0 $1,983,805 $606,917 $5,488,945
2026 New Design Projects: Acton Great Road, Hudson MCRT, Salem Broad/Dalton Redesign, Malden Route 60 Phases 1 & 2                 $0 $3,638,480 $0 $0 $0 $0 $0 $0 $0 $0 $3,638,480 $606,917 $5,488,945
2026 Lower-Risk Projects                                          
Low-Risk 2026 Projects: MWRTA CatchConnect, Chelsea/Revere Microtransit, Weston Intersection Improvements, Lexington 4/225/95 Interchange, Framingham 126/135/MBTA/CSX Intersection Improvements                 $6,900,582 $7,629,364   $463,807 $0 $0 $0 $0 $0   $8,093,171 $606,917 $5,488,945
2027 Higher-Risk Projects                                          
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 1.44 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 25% 1/5/21 4.21 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 75% 6/12/24 0.77 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 25% 7/12/24 0.69 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 25% 10/21/24 0.41 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
2027 Lower-Risk Projects                                          
Low Risk 2027 Projects: Boston Bridge Preservation on Cambridge Street, Everett Beacham Street, Salem/Peabody Boston Street                 $0 $0 $55,294,170 $53,761,973 $0 $0 $0 $0 $0 $0 $53,761,973 $606,917 $5,488,945
2028 Higher-Risk Projects                                          
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028-29 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 25% 9/22/22 2.49 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 25% 8/19/20 4.59 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) PRC 9/24/20 4.49 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
2028 Lower-Risk Projects                                          
Low Risk 2028 Projects: Natick Cochituate Rail Trail Extension, Wakefield Main Street, Westwood/Norwood Canton Street                 $0 $0 $0 $0 $38,783,672 $51,616,901 $10,000,000 $10,000,000 $0 $0 $61,616,901 $606,917 $5,488,945
2029-30 Higher-Risk Projects                                          
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) PRC 12/20/22 2.25 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $15,000,000 $0 $15,000,000 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 4.46 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 2030-31 PRC Approved (1/28/2021) PRC 1/28/21 4.14 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $8,000,000 $0 $8,000,000 $11,705,708 $11,705,708
2030 New Projects                                          
612534 Melrose MELROSE- LEBANON STREET IMPROVEMENT PROJECT (LYNDE STREET TO MALDEN CITY LINE) 56.4 2030
(FFYs 2026–30)
N/A 2030 25% Submitted
(1/10/2025)
25% 1/10/25 0.19 $0 $0 $0 $0 $0 $0 $0 $0 $10,528,000 $0 $10,528,000 $0 $4,341,220
613594 Newton NEEDHAM-NEWTON- BRIDGE REPLACEMENT ON CHRISTINA STREET 65.6 2030
(FFYs 2026–30)
N/A 2030 PRC-Approved
(10/12/2023)
PRC 10/12/23 1.44 $0 $0 $0 $0 $0 $0 $0 $0 $5,551,514 $0 $5,551,514 $0 $5,551,514
612870 Concord CONCORD- ASSABET RIVER MULTI-USE TRAIL AND BRIDGE CONSTRUCTION 55.1 2030-31
(FFYs 2026–30)
N/A 2030-31 PRC-Approved
(8/29/2022)
PRC 8/29/22 2.56 $0 $0 $0 $0 $0 $0 $0 $0 $4,802,400 $0 $4,802,400 $0 $9,604,800
613695 Lexington LEXINGTON- ROADWAY RECONSTRUCTION ON HARTWELL AVENUE AND BEDFORD STREET 72.6 2030-32
(FFYs 2026–30)
N/A 2030-32 PRC-Approved
(5/31/2024)
PRC 5/31/24 0.80 $0 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $0 $10,000,000 $0 $46,195,840
2029-30 Lower-Risk Projects                                          
Low-Risk 2029 Projects: Sudbury/Framingham Bruce Freeman Rail Trail, Woburn Common, Bellingham Hartford Road, Ipswich Argilla Road                   $0 $0 $0 $0 $0 $24,938,200 $31,487,535 $16,199,200 $0 $47,686,735 $606,917 $5,488,945
CTPS Set-Asides: Transit Transformation, Community Connections, Bikeshare Expansion, Project Design Pilot                 $7,887,222 $0 $9,536,193 $6,036,193 $10,000,000 $13,000,000 $11,000,000 $14,000,000 $14,500,000 $0 $47,536,193 $606,917 $5,488,945

 

Federal Fiscal Year 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                     
Draft Total Programmed Regional Highway Target Funds: $124,569,057 $121,402,839 $165,603,759 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $153,081,114 $737,935,077
Regional Highway Target Funds Remaining (Unprogrammed): $716,631 $3,882,848 -$10,471,616 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $6,956,297 $16,234,675
Percent Unprogrammed 0.6% 3.1% -6.8% 1.0% 0.2% 1.3% 0.5% 1.2% 4.3% 2.2%

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year.  GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority.  MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority.  N/A = not applicable.  NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee.  PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined.  TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.   

 

 

 


 

Scenario 2B-Simplified

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
2026 Higher-Risk Projects                                          
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 100% 10/31/24 0.38 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 75% 9/12/24 0.52 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 25% 1/22/24 1.16 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 75% Rejected (3/6/2025) 75% 3/6/25 0.04 $8,000,000 $27,306,266 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $27,306,266 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 4.14 $8,665,052 $10,185,935 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $8,665,052 $15,000,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 75% 4/29/24 0.89 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
2026 Transit Transformation                                          
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025-26 N/A N/A N/A N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $1,000,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S13153 MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 44.6 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $3,216,897 $0 $0 $0 $0 $0 $0 $0 $0 $3,216,897 $0 $3,216,897
S13XXX MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 N/A 2026- N/A 2026 N/A N/A N/A N/A $0 $1,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $0 $1,875,000
2026 Other New Projects                                          
613357 Cambridge CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET N/A 2025
(FFYs 2025–29)
Earmark Discretionary
2025 2026 25% Received
02/14/2025
25% 2/14/25 0.09 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $1,632,130 $2,000,000
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
100% 2/6/25 0.12 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,062,695
2026 Community Connections + GHG Monitoring: Bluebikes Replacement in Boston, Cambridge, and Somerville, Bluebikes Expansion in Brookline and Chelsea, Bike Racks/Shelters/RRFBs in Newton and Marblehead, and Air Quality Sensors for the PBPP                 $0 $1,983,805 $0 $0 $0 $0 $0 $0 $0 $0 $1,983,805 $606,917 $5,488,945
2026 New Design Projects: Acton Great Road, Hudson MCRT, Salem Broad/Dalton Redesign, Malden Route 60 Phases 1 & 2                 $0 $3,638,480 $0 $0 $0 $0 $0 $0 $0 $0 $3,638,480 $606,917 $5,488,945
2026 Lower-Risk Projects                                          
Low-Risk 2026 Projects: MWRTA CatchConnect, Chelsea/Revere Microtransit, Weston Intersection Improvements, Lexington 4/225/95 Interchange, Framingham 126/135/MBTA/CSX Intersection Improvements                 $6,900,582 $7,629,364   $463,807 $0 $0 $0 $0 $0   $8,093,171 $606,917 $5,488,945
2027 Higher-Risk Projects                                          
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 1.44 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 25% 1/5/21 4.21 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 75% 6/12/24 0.77 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 25% 7/12/24 0.69 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 25% 10/21/24 0.41 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
2027 Lower-Risk Projects                                          
Low Risk 2027 Projects: Boston Bridge Preservation on Cambridge Street, Everett Beacham Street, Salem/Peabody Boston Street                 $0 $0 $55,294,170 $53,761,973 $0 $0 $0 $0 $0 $0 $53,761,973 $606,917 $5,488,945
2028 Higher-Risk Projects                                          
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028-29 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 25% 9/22/22 2.49 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 25% 8/19/20 4.59 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) PRC 9/24/20 4.49 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
2028 Lower-Risk Projects                                          
Low Risk 2028 Projects: Natick Cochituate Rail Trail Extension, Wakefield Main Street, Westwood/Norwood Canton Street                 $0 $0 $0 $0 $38,783,672 $51,616,901 $10,000,000 $10,000,000 $0 $0 $61,616,901 $606,917 $5,488,945
2029-30 Higher-Risk Projects                                          
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) PRC 12/20/22 2.25 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $47,536,800 $0 $47,536,800 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 4.46 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 69.9 2027
(FFYs 2023–27)
2027 2030-31 PRC Approved (1/28/2021) PRC 1/28/21 4.14 $0 $0 $11,287,647 $0 $0 $0 $0 $0 $12,123,769 $0 $8,000,000 $11,705,708 $11,705,708
2030 New Projects                                          
2029-30 Lower-Risk Projects                                          
Low-Risk 2029 Projects: Sudbury/Framingham Bruce Freeman Rail Trail, Woburn Common, Bellingham Hartford Road, Ipswich Argilla Road                   $0 $0 $0 $0 $0 $24,938,200 $31,487,535 $16,199,200 $0 $47,686,735 $606,917 $5,488,945
CTPS Set-Asides: Transit Transformation, Community Connections, Bikeshare Expansion, Project Design Pilot                 $7,887,222 $0 $9,536,193 $6,036,193 $10,000,000 $13,000,000 $11,000,000 $14,000,000 $14,500,000 $0 $47,536,193 $606,917 $5,488,945

 

Federal Fiscal Year 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                     
Draft Total Programmed Regional Highway Target Funds: $124,569,057 $121,402,839 $165,603,759 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $158,859,769 $743,713,732
Regional Highway Target Funds Remaining (Unprogrammed): $716,631 $3,882,848 -$10,471,616 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $1,177,642 $10,456,020
Percent Unprogrammed 0.6% 3.1% -6.8% 1.0% 0.2% 1.3% 0.5% 1.2% 0.7% 1.4%

 

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles.  

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year. GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined. TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.

 

 


 

Scenario 2C-Simplified

 

Project ID Proponent(s) Project Name MPO Score Initial TIP Year & TIP FFYs 2025–29
Programmed Year(s)
FFYs 2026–30
Programmed
Year(s)
Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone FFY 2026 FFY 2026 (New) FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030
(New)
Other Non-Target Funds FFYs 2026–30
Target Program Spending
Adjusted TFPC
 (FFYs 2025-29)
Adjusted TFPC
 (FFYs 2026-30)
2026 Higher-Risk Projects                                          
611982 Medford MEDFORD- SHARED USE PATH CONNECTION AT THE ROUTE 28/WELLINGTON UNDERPASS N/A 2025
(FFYs 2025–29)
2025 2026 100% Received (10/31/2024) 100% 10/31/24 0.38 $0 $5,488,945 $0 $0 $0 $0 $0 $0 $0 $0 $5,488,945 $606,917 $5,488,945
610544 Peabody PEABODY- MULTI-USE PATH CONSTRUCTION OF INDEPENDENCE GREENWAY AT I-95 AND ROUTE 1 53 2025
(FFYs 2021–25)
2025 2026 75% Received (9/12/2024) 75% 9/12/24 0.52 $0 $19,127,610 $0 $0 $0 $0 $0 $0 $0 $0 $19,127,610 $13,966,099 $22,091,033
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 52 2025
(FFYs 2021–25)
2025 2026 25% Approved (1/22/2024) 25% 1/22/24 1.16 $0 $3,438,311 $0 $0 $0 $0 $0 $0 $0 $0 $3,438,311 $1,978,080 $3,438,311
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 64.6 2026
(FFYs 2023–27)
2026-27 2026 75% Rejected (3/6/2025) 75% 3/6/25 0.04 $8,000,000 $27,306,266 $12,499,750 $0 $0 $0 $0 $0 $0 $0 $27,306,266 $20,499,750 $19,711,298
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 58 2019
(FFYs 2016–20)
2026 2026 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 4.14 $8,665,052 $10,185,935 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $8,665,052 $15,000,000
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 55 2024
(FFYs 2020–24)
2026 2026-27 75% Comments to DE (4/29/2024) 75% 4/29/24 0.89 $28,738,432 $21,949,531 $0 $10,000,000 $0 $0 $0 $0 $0 $0 $31,949,531 $28,738,432 $31,949,531
2026 Transit Transformation                                          
S13212 MBTA MBTA- BUS PRIORITY AND ACCESSIBILITY IMPROVEMENTS  48 N/A N/A 2025-26 N/A N/A N/A N/A $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $6,000,000 $0 $1,000,000
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 TBD 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,460,000 $4,260,000
S12971 MWRTA MWRTA- BLANDIN HUB ACCESSIBLE REDESIGN 64 2025-26
(FFYs 2025–29)
2025-26 2025-26 N/A N/A N/A N/A $750,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $750,000 $2,500,000 $15,000,000
S13153 MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 44.6 2026
(FFYs 2026–30)
N/A 2026 N/A N/A N/A N/A $0 $3,216,897 $0 $0 $0 $0 $0 $0 $0 $0 $3,216,897 $0 $3,216,897
S13XXX MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 N/A 2026- N/A 2026 N/A N/A N/A N/A $0 $1,875,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,875,000 $0 $1,875,000
2026 Other New Projects                                          
613357 Cambridge CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET N/A 2025
(FFYs 2025–29)
Earmark Discretionary
2025 2026 25% Received
02/14/2025
25% 2/14/25 0.09 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $2,000,000 $1,632,130 $2,000,000
613163 Lynnfield LYNNFIELD- RAIL TRAIL CONSTRUCTION, FROM FORD AVENUE TO NICHOLS LANE (PHASE 1) TBD 2029
(FFYs 2025–29)
Statewide Highway
2029 2026 100% Submitted
(2/6/2025)
100% 2/6/25 0.12 $0 $6,062,695 $0 $0 $0 $0 $0 $0 $0 $0 $6,062,695 $38,491,410 $6,062,695
2026 Community Connections + GHG Monitoring: Bluebikes Replacement in Boston, Cambridge, and Somerville, Bluebikes Expansion in Brookline and Chelsea, Bike Racks/Shelters/RRFBs in Newton and Marblehead, and Air Quality Sensors for the PBPP                 $0 $1,983,805 $0 $0 $0 $0 $0 $0 $0 $0 $1,983,805 $606,917 $5,488,945
2026 New Design Projects: Acton Great Road, Hudson MCRT, Salem Broad/Dalton Redesign, Malden Route 60 Phases 1 & 2                 $0 $3,638,480 $0 $0 $0 $0 $0 $0 $0 $0 $3,638,480 $606,917 $5,488,945
2026 Lower-Risk Projects                                          
Low-Risk 2026 Projects: MWRTA CatchConnect, Chelsea/Revere Microtransit, Weston Intersection Improvements, Lexington 4/225/95 Interchange, Framingham 126/135/MBTA/CSX Intersection Improvements                 $6,900,582 $7,629,364   $463,807 $0 $0 $0 $0 $0   $8,093,171 $606,917 $5,488,945
2027 Higher-Risk Projects                                          
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 43 2024
(FFYs 2020–24)
2026 2027 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 1.44 $13,548,565 $0 $0 $13,548,565 $0 $0 $0 $0 $0 $0 $13,548,565 $9,758,201 $13,548,565
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  55 2021
(FFYs 2017–21)
2026-27 2027 25% Received - Resubmission 1 (1/5/2021) 25% 1/5/21 4.21 $27,636,336 $0 $0 $27,636,336 $0 $0 $0 $0 $0 $0 $27,636,336 $28,699,272 $27,636,336
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 41.1 2026
(FFYs 2025–29)
2026 2027 75% Received - Resubmission 1 (6/12/2024) 75% 6/12/24 0.77 $1,885,353 $0 $0 $3,700,546 $0 $0 $0 $0 $0 $0 $3,700,546 $1,885,353 $3,700,546
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 47 2023
(FFYs 2019–23)
2027-28 2027-28 25% Received (7/12/2024) 25% 7/12/24 0.69 $0 $0 $6,000,000 $6,000,000 $5,728,698 $9,035,254 $0 $0 $0 $0 $15,035,254 $11,728,698 $15,035,254
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 72.2 2027
(FFYs 2023–27)
2027-31 2027-31 25% Received (10/21/2024) 25% 10/21/24 0.41 $0 $0 $30,000,000 $30,000,000 $30,000,000 $33,075,573 $30,310,000 $30,310,000 $35,000,000 $53,750,000 $128,385,573 $95,310,000 $128,385,573
2027 Lower-Risk Projects                                          
Low Risk 2027 Projects: Boston Bridge Preservation on Cambridge Street, Everett Beacham Street, Salem/Peabody Boston Street                 $0 $0 $55,294,170 $53,761,973 $0 $0 $0 $0 $0 $0 $53,761,973 $606,917 $5,488,945
2028 Higher-Risk Projects                                          
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 66 2024
(FFYs 2020–24)
2026-27 2028-29 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $10,000,000 $0 $9,698,640 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $23,567,554 $19,698,640 $23,567,554
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 49.2 2026
(FFYs 2023–27)
2027 2028 25% Design Public Hearing (9/22/2022) 25% 9/22/22 2.49 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0 $19,999,712 $19,999,712 $19,999,712
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 38 2024
(FFYs 2020–24)
2028 2028 25% Comments to DE (8/19/2020) 25% 8/19/20 4.59 $0 $0 $0 $0 $1,316,340 $1,269,327 $0 $0 $0 $0 $1,269,327 $1,222,315 $1,269,327
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 62.4 2027
(FFYs 2023–27)
2028 2028 PRC Approved (9/24/2020) PRC 9/24/20 4.49 $0 $0 $0 $0 $10,000,000 $15,040,279 $18,995,267 $12,919,442 $0 $0 $27,959,721 $28,995,267 $27,959,721
2028 Lower-Risk Projects                                          
Low Risk 2028 Projects: Natick Cochituate Rail Trail Extension, Wakefield Main Street, Westwood/Norwood Canton Street                 $0 $0 $0 $0 $38,783,672 $51,616,901 $10,000,000 $10,000,000 $0 $0 $61,616,901 $606,917 $5,488,945
2029-30 Higher-Risk Projects                                          
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 73 2027
(FFYs 2024–28)
2028 2029 PRC Approved (12/20/2022) PRC 12/20/22 2.25 $0 $0 $0 $0 $4,858,127 $0 $0 $4,858,127 $0 $0 $4,858,127 $4,858,127 $4,858,127
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 66.4 2027
(FFYs 2023–27)
2028 2029 PRC Approved (12/19/2019) PRC 12/19/19 5.25 $0 $0 $0 $0 $8,624,000 $0 $0 $8,624,000 $0 $0 $8,624,000 $8,932,000 $8,624,000
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 74.9 2027
(FFYs 2023–27)
2028-31 2030-32 PRC Approved (12/6/2018) PRC 12/6/18 6.29 $0 $0 $0 $0 $15,000,000 $0 $20,000,000 $0 $15,000,000 $0 $15,000,000 $40,980,000 $47,536,800
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 59 2020
(FFYs 2016–20)
2028-32 2029-33 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 4.46 $0 $0 $0 $0 $33,500,000 $0 $45,000,000 $33,500,000 $33,500,000 $0 $67,000,000 $197,759,449 $197,759,449
2030 New Projects                                          
613568 Cambridge CAMBRIDGE- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR 79.4 2030
(FFYs 2026–30)
N/A 2030 PRC-Approved (5/31/2024) PRC 5/31/24 0.80 $0 $0 $0 $0 $0 $0 $0 $0 $18,238,535 $0 $18,238,535 $0 $18,238,535
613585 Everett CHELSEA-EVERETT- RECONSTRUCTION OF VINE STREET AND THIRD STREET FROM CHELSEA STREET TO 2ND STREET 67.1 2030-31
(FFYs 2026–30)
N/A 2030 PRC-Approved (10/12/2023) PRC 10/12/23 1.44 $0 $0 $0 $0 $0 $0 $0 $0 $13,119,298 $0 $13,119,298 $0 $13,119,298
613695 Lexington LEXINGTON- ROADWAY RECONSTRUCTION ON HARTWELL AVENUE AND BEDFORD STREET 72.6 2030-32
(FFYs 2026–30)
N/A 2030-32 PRC-Approved
(5/31/2024)
PRC 5/31/24 0.80 $0 $0 $0 $0 $0 $0 $0 $0 $10,000,000 $0 $10,000,000 $0 $46,195,840
2029-30 Lower-Risk Projects                                          
Low-Risk 2029 Projects: Sudbury/Framingham Bruce Freeman Rail Trail, Woburn Common, Bellingham Hartford Road, Ipswich Argilla Road                   $0 $0 $0 $0 $0 $24,938,200 $31,487,535 $16,199,200 $0 $47,686,735 $606,917 $5,488,945
CTPS Set-Asides: Transit Transformation, Community Connections, Bikeshare Expansion, Project Design Pilot                 $7,887,222 $0 $9,536,193 $6,036,193 $10,000,000 $13,000,000 $11,000,000 $14,000,000 $14,500,000 $0 $47,536,193 $606,917 $5,488,945

 

 

Federal Fiscal Year 2026 2026 (New) 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 (New) 2026-30 Total
Total Available Regional Highway Target Funds (FFYs 2026-30 TIP): $125,285,688 $125,285,687 $155,132,143 $152,627,429 $158,052,175 $158,700,879 $161,030,608 $157,518,346 $160,037,411 $754,169,752
                     
Draft Total Programmed Regional Highway Target Funds: $124,569,057 $121,402,839 $154,316,112 $151,147,420 $157,810,837 $156,604,600 $160,243,467 $155,699,104 $155,557,033 $740,410,996
Regional Highway Target Funds Remaining (Unprogrammed): $716,631 $3,882,848 $816,031 $1,480,009 $241,338 $2,096,279 $787,141 $1,819,242 $4,480,378 $13,758,756
Percent Unprogrammed 0.6% 3.1% 0.5% 1.0% 0.2% 1.3% 0.5% 1.2% 2.8% 1.8%

 

 

 

Projects in red text are identified as being high risk for staying on schedule based on information obtained at the February 2025 TIP readiness meeting.

Projects in orange text were identified as candidates to remain on schedule if near-term issue resolution occurs.

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.

Black, bolded text on project names indicates an administrative line item. These line items often set aside funding to be allocated in future TIP cycles. 

 

Highlighting indicates a project was recommended to move out to a later TIP year.
Highlighting indicates a project is proposed to be added to the TIP.  
Highlighting indicates a project is proposed to be removed from the TIP.

 

Abbreviations

ADA = Americans with Disabilities Act. CATA = Cape Ann Transportation Authority.CNG = compressed natural gas. CTPS = Central Transportation Planning Staff. DE = Design Engineer. FFY = federal fiscal year. GHG = greenhouse gas. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NB = northbound. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee. PS&E = Plans, Specifications, and Estimates. RRFB = Rectangular Rapid Flashing Beacon. RTA = Regional Transit Authority. SRTS = Safe Routes to School. TBD = to be determined. TFPC = Total Federal Participating Cost. TIP = Transportation Improvement Program.