| Project | Proposed Change | Explanation | Section/Funding Source | Current Cost | New Cost | Difference |
| FFY 2026 Earmark or Discretionary Program | ||||||
| 613727: BRAINTREE- RECONSTRUCTION OF ALLEN STREET (MA285) | New Project | This line item programs a FFY 2023 Transportation, Housing, and Urban Development appropriation with matching funding to reconstruction of Allen Street from Shaw Street to Quincy Avenue. The project has also been awarded $2.5 million in MassWorks funds. The total estimated project cost is $10,151,995, with the estimated federal cost for inclusion in the TIP being $8,555,285. The difference between the earmark funds and the estimated federal cost is funded through the FFY 2026 Statewide Highway Program. | HPP | $0 | $4,617,785 | $4,617,785 |
| FFY 2026 Statewide Highway Program | ||||||
| 613727: BRAINTREE- RECONSTRUCTION OF ALLEN STREET (MA285) | New Project | This line item programs a FFY 2023 Transportation, Housing, and Urban Development appropriation with matching funding to reconstruction of Allen Street from Shaw Street to Quincy Avenue. The project has also been awarded $2.5 million in MassWorks funds. The total estimated project cost is $10,151,995, with the estimated federal cost for inclusion in the TIP being $8,555,285. The difference between the earmark funds and the estimated federal cost is funded through the FFY 2026 Statewide Highway Program. | STBG | $0 | $3,937,500 | $3,937,500 |
| S13530: MBTA- FFY 2026 CATAMARAN OVERHAUL (FBP) FLEX TO FTA | New Project | This line item allocates $1,521,400 in FHWA Ferry Boat Program funds as a flex to the MBTA to support ongoing overhauls of its catamaran ferry assets. | FBP | $0 | $1,521,400 | $1,521,400 |
| FFY 2026 Transit Program | ||||||
| S13530: MBTA- FFY 2026 CATAMARAN OVERHAUL (FBP) FLEX TO FTA | New Project | This line item mirrors the above change to flex FHWA Ferry Boat Program funds from the FFY 2026 Statewide Highway Program to the MBTA in the FFY 2026 Transit Program. | FBP | $0 | $1,521,400 | $1,521,400 |
FBP = Ferry Boat Program. FFY = Federal Fiscal Year. FHWA = Federal Highway Administration. FTA = Federal Transit Administration. HPP = Highway Performance Program. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. STBG = Surface Transportation Block Grant. TIP = Transportation Improvement Program.