TIP ID | |
Project Name | |
Description | |
Category | |
Municipality | |
Subregion | |
Proponent | |
MPO Investment Program | |
STIP Program | |
Overall Evaluation Score |
Project Length | |
Existing Lane-Miles | |
Lane-Miles Added or Improved | |
Total Lane-Miles | |
Sidewalk Miles | |
Sidewalk Miles Improved | |
Miles of Exisiting On-road Bicycle Facilities | |
Miles of Exisiting Off-road Bicycle Facilities |
FDR On File? | |
Approved by PRC? | |
Year of PRC Approval | |
Design Status | |
Date of Design Status Update | |
Adds Capacity? | |
LRTP Project? | |
Current Cost Estimate | |
Project Update Date | |
Funding Status | |
LRTP Identified Need? | |
Amount Programmed | |
Municipal Priority |
Proponent | Contact Name | Contact Information |
Crash Data Years | |
Project in HSIP Cluster | |
Total ADT | |
Crash Rate | |
Intersection Type | |
Urban Federal Functional Class | |
Crash Rate Score (up to 5 points) |
Number of Fatal Crashes | |
Number of Crashes with Injuries | |
Number of Crashes with Property Damage | |
Total Number of Crashes | |
EPDO | |
EPDO of Crash Cluster with Highest EPDO in Project Area | |
Crash Severity Value Score (up to 5 points) |
Number of Crashes Involving Pedestrians | |
Existing Pedestrian Facilities | |
Existing Pedestrian Safety Issues | |
Existing Pedestrian Use | |
Description of Existing Pedestrian Use | |
Description of Desired Pedestrian Use | |
Proposed Pedestrian Safety Countermeasures | |
Effectiveness of Proposed Pedestrian Safety Countermeasures | |
Effectiveness of Pedestrian Safety Countermeasures Score (up to 3 points) | |
Project in Pedestrian HSIP Cluster | |
Bonus for Improving Safety at Pedestrian HSIP Cluster (up to 2 points) |
Number of Crashes Involving Bicyclists | |
Existing Bicycle Facilities | |
Existing Bicycle Safety Issues | |
Existing Bicycle Use | |
Description of Existing Bicycle Use | |
Description of Desired Bicycle Use | |
Proposed Bicycle Safety Countermeasures | Database field to read is TBD. |
Effectiveness of Proposed Bicycle Safety Countermeasures | |
Effectiveness of Bicycle Safety Countermeasures Score (up to 3 points) | |
Project in Bicycle HSIP Cluster | |
Bonus Score for Improving Safety at Bicycle HSIP Cluster (up to 2 points) |
Truck ADT | |
Number of Truck Crashes | |
Existing Roadway Deficiency for Trucks | |
Proposed Truck Safety Countermeasures | |
Effectiveness of Proposed Truck Safety Countermeasures | |
Improves Truck Safety Score (up to 3 points) | |
Bonus Score for Improving Safety at HSIP Cluster (2 points) |
Project Area Includes At-grade Railroad Crossing | |
Type of Safety Improvement of At-grade Railroad Crossing | |
Description of At-grade Railroad Crossing Improvements | |
Improves Safety at Railroad Crossing Score (up to 5 points) |
Overall Safety Score (up to 30 points) |
Project Includes Bridge Improvements | |
Improves Substandard Bridge Score (up to 3 points) |
Pavement IRI Value | |
IRI Rating | |
IRI Data Year | |
Description of Existing Pavement Condition | |
Improves Substandard Pavement Score (up to 6 points) |
Number of Existing Signals in Project Area | |
Number of Existing Signals to Be Improved | |
Description of Existing Signal Condition | |
Planned Signal Improvements Included in Project | |
Improves Substandard Traffic Signals Score (up to 6 points) |
Project Brings Existing Transit Asset into State of Good Repair | |
Description of Improvements to Transit Asset Included in Project | |
Project Meets Identified Need in Asset Management Plan | |
Improves Transit Asset(s) Score (up to 3 points) |
Existing Sidewalk Condition Rating | |
Existing Sidewalk Condition Description | |
Proposed Sidewalk Improvements Included in Project | |
Improved Substandard Sidewalks Score (up to 3 points) |
Project Located in Hurricane Evacuation Zone | |
Project Improves Emergency Evacuation Route | |
Emergency Support Facilities Located within 1/4 Mile of Project | |
Name(s) of Emergency Support Facilities in Project Area | |
Project Improves Access to Emergency Support Facilities | |
Description of Improvements to Emergency Support Facility Access Included In Project | |
Improves Emergency Response Score (up to 2 points) |
Project Lies within a Flood Zone | |
Description of Flooding-Related Problems in Project Area and how Project Addresses them | |
Project Brings Facility up to Current Seismic Standards | |
Description of Seismic Standard Deficiencies and how Project Addresses them | |
Project Addresses Critical Transportation Infrastructure | |
Description of how Project Addresses Critical Transportation Infrastructure | |
Project Helps to Implement Hazard Mitigation and/or Climate Adaptation Plan | |
Description of Project Contribution to Hazard Mitigation / Climate Adaptation Plan | |
Project Protects Freight Network Elements | |
Improves Response to Other Extreme Conditions Score (up to 6 points) |
Overall System Preservation Score (up to 29 points) |
Bridges
BDEPT | Bridge Rating | AASHTO Rating | Year Built | Year Rebuilt |
MBTA Bus Routes on Project Roadways | |
Other Transit Routes on Project Roadways | |
Daily Transit Runs on Project Roadways | |
No-build Signal Delay | |
Build Signal Delay | |
Change in Signal Delay | |
Change in Transit Vehicle Delay | |
Reduces Transit Vehicle Delay Base Score (up to 3 points) | |
Project Improves Key Bus Route(s) | |
Improves Key Bus Route(s) Bonus Score (up to 1 point) |
Vehicle Delay Change | |
Reduces Vehicle Congestion Score (up to 6 points) |
Project Adds New Sidewalks | |
Project Includes ADA Accessibility Improvements | |
Project Closes an Identified Gap in the Pedestrian Network | |
Description of Existing Gap in the Pedestrian Network | |
Improves Pedestrian Network and ADA Accessibility Score (up to 5 points) |
Project Closes an Identified Gap in the Bicycle Network | |
Description of Existing Gap in the Bicycle Network | |
Improves Bicycle Network Score (up to 4 points) |
Description of Improvements to Transit Connections | |
Transit Connection Improvement Assessment | |
Level of Intermodal Facility Use | |
Description of Intermodal Facility Use | |
Improves Intermodal Connections to Transit Score (up to 6 points) |
Existing Truck-related Roadway Conditions | |
Description of Truck-related Roadway Deficiencies | |
Magnitude of Truck Movement Improvements | |
Project Area Includes MPO-identified Bottleneck Location(s) | |
Improves Truck Movement Score (up to 4 points) |
Overall Capacity Management / Mobility Score (up to 29 points) |
Project is Located in an EOEEA-certified Green Community | |
EOEEA-certified Green Community Score (up to 2 points) |
CO2 Impact - Change in Annual Tons | |
Reduces CO2 Score (up to 5 points) | |
Other Emissions (VOC, NOx, CO) Impact - Change in Annual Tons | |
Reduces Other Emissions Score (up to 5 points) |
Project Includes Stormwater Best Management Practices | |
Description of Stormwater Best Management Practices Included in Project | |
Project Includes Improvements to Cultural Resources / Open Space | |
Description of Cultural Resources / Open Space Improvements Included in Project | |
Project Enhances or Improves Wetlands Resources | |
Description of Wetlands Resources Improvements Included in Project | |
Project Enhances or Improves Wildlife Preservation Areas / Protected Habitats | |
Description of Wildlife Preservation Improvements Included in Project | |
Addresses Environmental Impacts Score (up to 4 points) |
Overall Clean Air / Sustainable Communities Score (up to 16 points) |
Percentage of Population in Project Area that is Minority | |
Minority Population in Project Area | |
Concentration of Minority Population in Project Area | |
Serves Minority Population Score (up to 2 points) |
Percentage of Low-Income Households in Project Area | |
Low-Income Households in Project Area | |
Concentration of Low-Income Households in Project Area | |
Serves Low-Income Households Score (up to 2 points) |
Percentage of Limited-English Proficient (LEP) Population in Project Area | |
LEP Population in Project Area | |
Concentration of LEP Population in Project Area | |
Serves LEP Population Score (up to 2 points) |
Percentage of Elderly (Over 75) Population in Project Area | |
Elderly Population in Project Area | |
Concentration of Elderly Population in Project Area | |
Serves Elderly Population Score (up to 2 points) |
Percentage of Zero-vehicle Households in Project Area | |
Zero-vehicle Households in Project Area | |
Concentration of Zero-vehicle Households in Project Area | |
Serves Zero-vehicle Households Score (up to 2 points) |
Percentage of Population with Disabilities in Project Area | |
Population with Disabilities in Project Area | |
Concentration of Population with Disabilities in Project Area | |
Serves Persons with Disabilities Score (up to 2 points) |
Project Creates a Burden for Title VI / Non-discrimination Populations | |
Score Penalty for Creating a Burden for Title VI / Non-discrimination |
Overall Transportation Equity Score (up to 12 points) |
Project Serves a Targeted Economic Development Site | |
Name of Targeted Development Site | |
Description of Access Improvements to Targeted Development Site | |
Description of New or Improved Transit Access to or within Site | |
Project Provides for Bicycle Access to or within Targeted Development Site | |
Project Provides for Pedestrian Access to or within Targeted Development Site | |
Project Provides for Improved Road Access to or within Targeted Development Site | |
Serves Targeted Development Site Score (up to 6 points) |
Area of Concentrated Development is Present in the Project Area | |
Project Mostly or Partly Serves an Area of Concentrated Development | |
Project Area has Zoning or Other Regulations Supportive of Smart Growth | |
Project Area is Served by a Commercial District Organization | |
Name of Commercial District Organization | |
Provides for Development Consistent with MetroFuture Score (up to 5 points) |
Project Improves Transit Access to an Area of High Economic Activity | |
Project Improves Pedestrian Access to an Area of High Economic Activity | |
Project Improves Bicycle Access to an Area of High Economic Activity | |
Project Improves Truck Access to an Area of High Economic Activity | |
Project Improves Multimodal Access to an Activity Center Score (up to 4 points) |
Type of non-TIP Investment in Project | |
Percentage of Project Cost Covered by non-TIP Investments | |
Leverages Other Investments Score (up to 3 points) |
Overall Economic Vitality Score (up to 18 points) |